Which rating system is appropriate for a new mixed-use building with 300,000 ft2 (27 871 m2) of residential units, 150,000 ft2 (13 935 m2) hotel and 50,000 ft2 (4 645 m2) of retail space?
Answer(s): D
New Construction is the appropriate rating system for a new mixed-use building with 300,000 ft2 (27 871 m2) of residential units, 150,000 ft2 (13 935 m2) hotel and 50,000 ft2 (4 645 m2) of retail space. According to the LEED rating system selection guidance1, the New Construction rating system applies to buildings that are being newly constructed or going through a major renovation, and that include any of the following use types: office, retail, hospitality, education, residential, warehouse and distribution centers, or data centers. The New Construction rating system can also be used for mixed-use buildings that have more than one use type. Since the project involves new construction of a mixed-use building with residential, hospitality, and retail uses, the New Construction rating system is the most suitable option. The other rating systems are not applicable because they are either specific to one use type (Retail and Hospitality) or to buildings that are not complete at the time of certification (Core and Shell Development).
LEED rating system selection guidance | U.S. Green Building Council LEED v4: Building Design + Construction Guide - U.S. Green Building Council LEED v4 Rating Systems | USGBC-LI
The scope of analysis in Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 4.Whole-Building Life-Cycle Assessment is a
Answer(s): C
The scope of analysis in Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 4. Whole-Building Life-Cycle Assessment is a cradle-to-grave assessment. This means that the life cycle assessment (LCA) covers all stages of the building's life cycle, from the extraction of raw materials (cradle) to the disposal or reuse of the building components at the end of their service life (grave)1. The LCA must include the following life cycle stages: product stage, construction process stage, use stage, and end-of-life stage. The LCA must also account for the environmental impacts of the building's structure and enclosure, as well as any other building elements that are permanently attached to and share service systems with the building.
Whole building life cycle assessment through LEED v4Building life-cycle impact reduction | U.S. Green Building Council
The project landscape architect suggests reducing the area planned for surface parking and replacing it with additional vegetated space. What benefit would this strategy provide to the owner?
Answer(s): A
Reducing the area planned for surface parking and replacing it with additional vegetated space can provide several benefits to the owner, such as:Decreasing the amount of bicycle parking that must be provided, since there will be less demand for parking spaces for cyclists.Increasing the overall SR (solar reflectance) of the hardscape area, which can reduce the cooling load and energy consumption of the building.Decreasing the required amount of on-street parking that must be provided, since there will be less demand for parking spaces for cars.However, one of the most significant benefits of this strategy is increasing the rainwater infiltration capacity, which can improve the water quality and quantity in the stormwater system. According to a study by Biondolilo1, integrating green space into parking lots can decrease stormwater runoff, mitigate the heat island effect, store carbon, improve air quality and may have social benefits as well. The study estimated that converting 30% of Manhattan's parking into green space would decrease runoff and pollutants from parking lots. Therefore, this strategy can help reduce water demand and environmental impact in arid climates.
How Eliminating Parking Minimums Actually Makes Cities Better Analyzing the benefits of reducing parking: improving public transportation to reduce parking demand and increase space for green infrastructure in Manhattan, Kansas Benefits of Urban Vegetation and Green Spaces - BeautyHarmonyLife Reduce Urban Heat Island Effect | Green Infrastructure | US EPA
The maximum number of points for Water Efficiency Credit, Cooling Tower Water Use can be obtained by
Achieving a minimum of 10 cooling tower cycles by increasing the level of make-up water treatment is the way to obtain the maximum number of points for Water Efficiency Credit, Cooling Tower Water Use. This credit aims to conserve water used for cooling tower equipment by encouraging the use of non-potable water sources and increasing the cycles of concentration. The cycles of concentration are the ratio of the concentration of dissolved solids in the blowdown water to the concentration of dissolved solids in the make-up water. Increasing the cycles of concentration reduces the amount of make-up water and blowdown water, and thus saves water and energy. The credit has two options:Option 1. Non-potable Water Source (1 point) and Option 2. Cooling Tower Water Use (2 points). Option 1 requires using at least 50% non-potable water for cooling tower make-up water. Option 2 requires achieving a minimum number of cooling tower cycles based on the quality of the make-up water, as specified in Table 1 of the credit requirements. The maximum number of cycles is 10, which can be achieved by increasing the level of make-up water treatment to meet the criteria for conductivity, silica, and alkalinity. Therefore, Option 2 is the way to obtain the maximum number of points for this credit.
Credit: Cooling tower water use | U.S. Green Building Council Cooling Tower Evaporation Credits | WaterSignal
What are the Storage and Collection of Recyclables requirements for only Retail projects under the Materials and Resources Prerequisite?
Retail projects must conduct a waste stream audit for the duration of the project in an existing location or make projections based on historical data for similar establishments. Identify the top-five recyclable waste streams while stating the top-four waste streams where both collection and storage space will be provided. This is the requirement for Retail projects under the Materials and Resources Prerequisite, Storage and Collection of Recyclables, according to the LEED v4 BD+C Reference Guide. The purpose of this prerequisite is to facilitate the reduction of waste generated by building occupants that is hauled to and disposed of in landfills. The prerequisite applies to all LEED BD+C projects, but Retail projects have a different approach than other project types because of their unique waste streams and operational characteristics. Retail projects must conduct a waste stream audit for the duration of the project in an existing location or make projections based on historical data for similar establishments. The audit or projection must identify the top-five recyclable waste streams by weight or volume using consistent metrics throughout. The waste stream study period must be a minimum of 24 hours. Retail projects must also provide dedicated areas that serve the entire building and are accessible to waste haulers and building occupants for the collection and storage of materials for recycling for at least four of the top-five recyclable waste streams identified by the audit or projection.
Prerequisite: Storage and collection of recyclables | U.S. Green Building Council
Share your comments for US Green Building Council LEED-AP-BD-C exam with other users:
this is a beautiful tool. passed after a week of studying.
can you please upload the dumps for 1z0-1096-23 for oracle
its intresting, i would like to learn more abouth this
q252: dns poisoning is the correct answer, not locator redirection. beaconing is detected from a host. this indicates that the system has been infected with malware, which could be the source of local dns poisoning. location redirection works by either embedding the redirection in the original websites code or having a user click on a url that has an embedded redirect. since users at a different office are not getting redirected, it isnt an embedded redirection on the original website and since the user is manually typing in the url and not clicking a link, it isnt a modified link.
helpful dump questions
question 423 eigrp uses metric
hello nice dumps
good resource for learning
very useful
physical tempering techniques
its giving best technical knowledge
please upload
great question with explanation thanks!!
does this exam have lab sections?
please upload the braindump for .net
i need this exam 1z0-1107-2. please.
very useful!
for this question - "which three type of basic patient or member information is displayed on the patient info component? (choose three.)", list of conditions is not displayed (it is displayed in patient card, not patient info). so should be thumbnail of chatter photo
q52 should be d. vm storage controller bandwidth represents the amount of data (in terms of bandwidth) that a vms storage controller is using to read and write data to the storage fabric.
nice questions
question # 208: failure logs is not an example of operational metadata.
good questions
thank you for the test materials!
its very helpful
good questons
i need the dumb of the hcip security v4.0 exam
upload the dump please
yes, iam looking this
please upload cima e2 managing performance dumps
wonderful questions
i used this site since 2000, still great to support my career