Which of these is a method to assess the regional context of a building's design for sustainability?
Answer(s): A
Conducting a site analysis is a method to assess the regional context of a building's design for sustainability. A site analysis involves collecting and evaluating information about the site's location, climate, ecology, history, culture, infrastructure, regulations, and stakeholders. This can help identify the opportunities and constraints for the project, as well as the potential impacts and benefits for the environment and the community. A site analysis can inform the design decisions regarding site selection, site development, water management, energy efficiency, material selection, indoor environmental quality, and innovation.
LEED BD+C Reference Guide, Integrative Process, page 281; Site Analysis for Construction
To achieve the Sustainable Sites Credit, Light Pollution Reduction, Option 1. BUG Rating Method, projects must demonstrate
Answer(s): C
To achieve the Sustainable Sites Credit, Light Pollution Reduction, Option 1. BUG Rating Method, projects must demonstrate that all luminaires meet acceptable fixture ratings for the project's Model Lighting Ordnance (MLO) lighting zone. The MLO lighting zone is determined by the site-specific characteristics and the definitions provided in the IES/IDA MLO User Guide. The fixture ratings are based on the backlight-uplight-glare (BUG) system, which measures the amount of light emitted in different directions by a luminaire, as defined in IES TM-15-11, Addendum A2. The maximum allowable ratings for each lighting zone are given in Table 1 of the credit language.
IES/IDA MLO User Guide; IES TM-15-11, Addendum A; Light pollution reduction
A tenant of a new office building will require 100 workstations per floor. Each floor will have two bathroom facilities and one conference room. How many lighting control devices with at least three lighting levels per floor are required to comply with Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control?
Answer(s): B
To comply with Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control, the tenant of a new office building will require 93 lighting control devices with at least three lighting levels per floor. This is because the credit requires that at least 90% of individual occupant spaces have lighting controls that enable occupants to adjust the lighting to suit their individual tasks and preferences. The credit also requires that all shared multioccupant spaces have lighting controls that enable adjustments that meet the needs of the group. According to the LEED BD+C Reference Guide, an individual occupant space is defined as an enclosed space or an open space that is occupied by one person and is at least 50 square feet (4.6 square meters) in area. A shared multioccupant space is defined as an enclosed or open space that is occupied by more than one person and is at least 100 square feet (9.3 square meters) in area. Based on the given information, each workstation can be considered as an individual occupant space, and each bathroom facility and conference room can be considered as a shared multioccupant space. Therefore, the number of lighting control devices per floor can be calculated as follows:For the 100 workstations, 90% of them need lighting controls, which is 90 workstations. Each workstation needs one lighting control device, so the total number of lighting control devices for the workstations is 90.For the two bathroom facilities, each facility needs one lighting control device, so the total number of lighting control devices for the bathroom facilities is 2. For the one conference room, one lighting control device is needed, so the total number of lighting control devices for the conference room is 1.The total number of lighting control devices per floor is then 90 + 2 + 1 = 93.
Interior lighting
Which of the following standards needs to be followed to comply with Indoor Environmental Quality Credit, Thermal Comfort?
To comply with Indoor Environmental Quality Credit, Thermal Comfort, the standard that needs to be followed is ASHRAE 55-2010, Thermal Environmental Conditions for Human Occupancy, with errata or a local equivalent. This standard specifies the combinations of indoor thermal environmental factors and personal factors that will produce thermal environmental conditions acceptable to a majority of the occupants within the space. The standard also provides methods for measuring and evaluating thermal comfort, as well as guidance for design, operation, and maintenance of thermal comfort systems.
Thermal comfort; ASHRAE 55-2010
Which of the following documents contains the design team's interpretation of the Owner's Project Requirements?
The Basis of Design (BOD) is the document that contains the design team's interpretation of the Owner's Project Requirements (OPR). The BOD describes the proposed systems and how they will meet the OPR, as well as the assumptions and criteria used for the design. The BOD is a key document for the Integrative Process credit and the Enhanced Commissioning credit in LEEDBD+C12.
LEED BD+C Reference Guide, Integrative Process, page 301; LEED BD+C Reference Guide, Enhanced Commissioning, page 681
Share your comments for US Green Building Council LEED-AP-BD-C exam with other users:
need this dumps
preparing for this exam is overwhelming. you cannot pass without the help of these exam dumps.
new to this site but i feel it is good
the correct answer to q8 is b. explanation since the mule app has a dependency, it is necessary to include project modules and dependencies to make sure the app will run successfully on the runtime on any other machine. source code of the component that the mule app is dependent of does not need to be included in the exported jar file, because the source code is not being used while executing an app. compiled code is being used instead.
good questions
Delayed the exam until December 29th.
A and D are True
good one with explanation
This is one of the most useful study guides I have ever used.