Which of the following products are eligible for a WaterSense label?

  1. Tankless toilets
  2. Waterless urinals
  3. Public lavatory faucets
  4. Private lavatory faucets

Answer(s): D

Explanation:

Private lavatory faucets are eligible for a WaterSense label, provided they meet EPA's specifications for water efficiency and performance, and are backed by independent, third-party certification. Tankless toilets, waterless urinals, and public lavatory faucets are not eligible for a WaterSense label because they are not included in the product categories that WaterSense covers. WaterSense currently labels products in the following categories: tank-type toilets, water-using urinals, private lavatory faucets, showerheads, irrigation controllers, spray sprinkler bodies, and pre-rinse spray valves.


Reference:

WaterSense Products | US EPA1
The WaterSense Label | US EPA2
Water Sense Labeling | LEEDuser3

Labeled Faucet Questions | WaterSense | US EPA4
What is the WaterSense Label and How Does it Apply?5



For schools intended for grades eight and below (or ages 14 and below), which of the following scenarios would demonstrate compliance with Location and Transportation Credit, Access to Quality Transit, Schools, Option 2. Pedestrian Access?

  1. 30% of the students live no more than a 3/4 mi. (1.20 km) walking distance from a functional entry of a school building
  2. 50% of the students live no more than a 3/4 mi. (1.20 km) walking distance from a functional entry of a school building
  3. 30% of the students live no more than a 1 1/2 mi. (2.40 km) walking distance from a functional entry of a school building
  4. 50% of the students live no more than a 1 1/2 mi. (2.40 km) walking distance from a functional entry of a school building

Answer(s): B

Explanation:

For schools intended for grades eight and below (or ages 14 and below), Option 2. Pedestrian Access requires that at least 50% of the students live no more than a 3/4 mi. (1.20 km) walking distance from a functional entry of a school building. This option aims to encourage schools to locate in areas where students can walk or bike to school, reducing vehicle trips and emissions, and promoting physical activity and health. Option 2 is available only for projects that do not meet the requirements of Option 1. Transit-Served Location, which requires access to quality transit service within a 1/4 mi. (400 m) walking distance for at least 50% of the students.


Reference:

Access to Quality Transit credit in LEED BD+C: Schools v4 - LEED v41 LEED Certification- Requirements for LT CREDIT: ACCESS TO QUALITY TRANSIT2 Understanding the LEED BD+C: Location and Transport credit3



The owner has stated a desire to provide a variety of non-automobile commuting options for the future occupants.
What credits should the LEED AP suggest to meet this goal?

  1. Sustainable Sites Credit, Heat Island Reduction and Location and Transportation Credit, Bicycle Facilities
  2. Location and Transportation Credit, Access to Quality Transit and Location and Transportation Credit, Sensitive Land Protection
  3. Location and Transportation Credit, Surrounding Density and Diverse Uses and Sustainable Sites Credit, Open Space
  4. Location and Transportation Credit, Reduced Parking Footprint and Location and Transportation Credit, Access to Quality Transit

Answer(s): D



Which of the following strategies is allowed under Energy Atmosphere Credit, Renewable Energy Production, and will help a project achieve Energy Atmosphere Credit, Optimize Energy Performance?

  1. Install an on-site photovoltaic array
  2. Purchase Green-e certified carbon offsets
  3. Purchase Green-e certified Renewable Energy Certificates (RECs)
  4. Install a ground-source heat pump

Answer(s): A

Explanation:

. Install an on-site photovoltaic array
Installing an on-site photovoltaic array is a direct method to produce renewable energy on the project site, which can be used to achieve points under the Energy Atmosphere Credit for Renewable Energy Production. Additionally, it contributes to optimizing energy performance by generating clean electricity on-site and reducing the need for energy from non-renewable sources.


Reference:

As per the LEED AP Building Design + Construction (LEED AP BD+C) V4 resources, the installation of on-site renewable energy systems like photovoltaic arrays is encouraged to reduce environmental impacts and improve a building's energy performance. This aligns with the goals of both the Renewable Energy Production and Optimize Energy Performance credits under the LEED rating system. For more detailed information, you can refer to the web-based reference guide in the credit library at USGBC's official website.



A LEED AP submitted a Preliminary Design and Construction review and has received a review comment and technical advice on Materials and Resources Prerequisite, Construction and Demolition Waste Management Planning.
Which of the following actions should the LEED AP do if the project continues to pursue LEED certification?

  1. Revise the documentation and resubmit the form
  2. Abandon meeting this prerequisite
  3. Submit an appeal to Green Business Certification Inc.
  4. Ask the General Contractor to be more aggressive with recycling goals

Answer(s): A

Explanation:

. Revise the documentation and resubmit the form
If a project receives a review comment and technical advice on a prerequisite, it means that the documentation submitted was incomplete, inaccurate, or unclear, and that the project team needs to address the issues raised by the reviewer and provide additional information or clarification. The project team should revise the documentation and resubmit the form as part of the final review to demonstrate compliance with the prerequisite requirements. Abandoning meeting this prerequisite is not an option, as prerequisites are mandatory for LEED certification. Submitting an appeal to Green Business Certification Inc. is only applicable if the project team disagrees with the reviewer's decision or interpretation, and has additional evidence or arguments to support their claim. Asking the General Contractor to be more aggressive with recycling goals is not relevant to this prerequisite, as it does not address the documentation issue.


Reference:

As per the LEED AP Building Design + Construction (LEED AP BD+C) V4 resources, the Materials and Resources Prerequisite for Construction and Demolition Waste Management Planning requires the project team to develop and implement a construction and demolition waste management plan that identifies at least five materials targeted for diversion from disposal in landfills and incinerators. The project team must also estimate a diversion rate for each material and describe how they will achieve it. The project team must submit this plan as part of the preliminary design review, along with a letter from the owner or project manager confirming that they will implement it during construction. If the reviewer finds any issues with the plan or the letter, they will provide a review comment and technical advice on how to improve it. The project team must then revise the documentation and resubmit it as part of the final design review, along with a narrative describing how they addressed the reviewer's feedback. For more detailed information, you can refer to the web-based reference guide in the credit library at USGBC's official website.



Viewing Page 12 of 62



Share your comments for US Green Building Council LEED-AP-BD-C exam with other users:

Biswa 11/20/2023 9:07:00 AM

understanding about joins
Anonymous


Jimmy Lopez 8/25/2023 10:19:00 AM

please upload oracle cloud infrastructure 2023 foundations associate exam braindumps. thank you.
Anonymous


Lily 4/24/2023 10:50:00 PM

questions made studying easy and enjoyable, passed on the first try!
UNITED STATES


John 8/7/2023 12:12:00 AM

has anyone recently attended safe 6.0 exam? did you see any questions from here?
Anonymous


Big Dog 6/24/2023 4:47:00 PM

question 13 should be dhcp option 43, right?
UNITED STATES


B.Khan 4/19/2022 9:43:00 PM

the buy 1 get 1 is a great deal. so far i have only gone over exam. it looks promissing. i report back once i write my exam.
INDIA


Ganesh 12/24/2023 11:56:00 PM

is this dump good
Anonymous


Albin 10/13/2023 12:37:00 AM

good ................
EUROPEAN UNION


Passed 1/16/2022 9:40:00 AM

passed
GERMANY


Harsh 6/12/2023 1:43:00 PM

yes going good
Anonymous


Salesforce consultant 1/2/2024 1:32:00 PM

good questions for practice
FRANCE


Ridima 9/12/2023 4:18:00 AM

need dump and sap notes for c_s4cpr_2308 - sap certified application associate - sap s/4hana cloud, public edition - sourcing and procurement
Anonymous


Tanvi Rajput 10/6/2023 6:50:00 AM

question 11: d i personally feel some answers are wrong.
UNITED KINGDOM


Anil 7/18/2023 9:38:00 AM

nice questions
Anonymous


Chris 8/26/2023 1:10:00 AM

looking for c1000-158: ibm cloud technical advocate v4 questions
Anonymous


sachin 6/27/2023 1:22:00 PM

can you share the pdf
Anonymous


Blessious Phiri 8/13/2023 10:26:00 AM

admin ii is real technical stuff
Anonymous


Luis Manuel 7/13/2023 9:30:00 PM

could you post the link
UNITED STATES


vijendra 8/18/2023 7:54:00 AM

hello send me dumps
Anonymous


Simeneh 7/9/2023 8:46:00 AM

it is very nice
Anonymous


john 11/16/2023 5:13:00 PM

i gave the amazon dva-c02 tests today and passed. very helpful.
Anonymous


Tao 11/20/2023 8:53:00 AM

there is an incorrect word in the problem statement. for example, in question 1, there is the word "speci c". this is "specific. in the other question, there is the word "noti cation". this is "notification. these mistakes make this site difficult for me to use.
Anonymous


patricks 10/24/2023 6:02:00 AM

passed my az-120 certification exam today with 90% marks. studied using the dumps highly recommended to all.
Anonymous


Ananya 9/14/2023 5:17:00 AM

i need it, plz make it available
UNITED STATES


JM 12/19/2023 2:41:00 PM

q47: intrusion prevention system is the correct answer, not patch management. by definition, there are no patches available for a zero-day vulnerability. the way to prevent an attacker from exploiting a zero-day vulnerability is to use an ips.
UNITED STATES


Ronke 8/18/2023 10:39:00 AM

this is simple but tiugh as well
Anonymous


CesarPA 7/12/2023 10:36:00 PM

questão 4, segundo meu compilador local e o site https://www.jdoodle.com/online-java-compiler/, a resposta correta é "c" !
UNITED STATES


Jeya 9/13/2023 7:50:00 AM

its very useful
INDIA


Tracy 10/24/2023 6:28:00 AM

i mastered my skills and aced the comptia 220-1102 exam with a score of 920/1000. i give the credit to for my success.
Anonymous


James 8/17/2023 4:33:00 PM

real questions
UNITED STATES


Aderonke 10/23/2023 1:07:00 PM

very helpful assessments
UNITED KINGDOM


Simmi 8/24/2023 7:25:00 AM

hi there, i would like to get dumps for this exam
AUSTRALIA


johnson 10/24/2023 5:47:00 AM

i studied for the microsoft azure az-204 exam through it has 100% real questions available for practice along with various mock tests. i scored 900/1000.
GERMANY


Manas 9/9/2023 1:48:00 AM

please upload 1z0-1072-23 exam dups
UNITED STATES