US Green Building Council LEED-AP-BD-C Exam (page: 1)
US Green Building Council LEED AP Building Design + Construction
Updated on: 28-Jul-2025

Viewing Page 1 of 62

Which of the following buildings meets the Minimum Program Requirements for LEED certification?

  1. A 1,500 ft2 (139 m2) Tourism Center located on a previously undeveloped one-acre site
  2. A 20,000 ft2 (1 859 m2) Transit Parking Garage located on a previously developed five-acre site
  3. A 2,500 ft2 (232 m2) mobile Health Clinic located on a previously constructed above-water dock
  4. A 5,000 ft2 (465 m2) Science Education center on an above-water pier that is being built specifically for the Education center

Answer(s): D

Explanation:

The Minimum Program Requirements (MPRs) for LEED certification are:
MPR 1: Must be in a permanent location on existing land MPR 2: Must use reasonable LEED boundaries
MPR 3: Must comply with project size requirements
Option A does not meet MPR 1 because it is located on a previously undeveloped site, which is not considered existing land. Option B does not meet MPR 3 because it is a parking garage, which is excluded from LEED certification unless it is part of a larger project. Option C does not meet MPR 1 because it is a mobile clinic, which is not considered permanent. Option D meets all the MPRs because it is a permanent building on existing land, it has reasonable LEED boundaries, and it meets the minimum gross floor area of 1,000 ft2 (93 m2) for BD+C projects.


Reference:

LEED minimum program requirements
Minimum Program Requirements (MPRs)
What do the LEED Minimum Program Requirements Really Mean?



Which of the following would be most useful to a school project that is attempting to pursue Water Efficiency Credit, Indoor Water Use Reduction?

  1. A standard garbage disposal
  2. Electronic submeter at the domestic water supply pipe to the building
  3. An open-loop HVAC system that discharges potable cooling water to a nearby lake
  4. Commercial dishwasher that is ENERGY STAR® labeled or performance equivalent

Answer(s): D

Explanation:

The Water Efficiency Credit, Indoor Water Use Reduction aims to reduce indoor water consumption by installing water-efficient fixtures and fittings, such as faucets, showerheads, toilets, and urinals. A commercial dishwasher that is ENERGY STAR® labeled or performance equivalent would help reduce the water use for dishwashing, which is one of the process water uses included in the credit calculation. A standard garbage disposal would not reduce water use, but rather increase it. An electronic submeter at the domestic water supply pipe to the building would help measure and monitor water use, but not directly reduce it. An open-loop HVAC system that discharges potable cooling water to a nearby lake would waste a lot of water and potentially harm the environment.


Reference:

Indoor Water Use Reduction
"Maximizing Water Efficiency in Commercial Buildings: Understanding LEED BD+C Water Efficiency Credits"



A project has total waste of 20 tons (18.1 tonnes) that includes the following:
· 8 tons (7.3 tonnes) of recycled demolition steel and concrete · 2 tons (1.8 tonnes) of trees cleared from the site
. 3 tons (2.7 tonnes) of commingled scrap with 40% diverted . 6 tons (5.4 tonnes) of used furniture donated to a non-profit organization · 1 ton (0.9 tonnes) of removed carpet and ceiling tiles sent back to the manufacturer
What is the percentage of diverted waste for Materials and Resources Credit, Construction and Demolition Waste
Management?

  1. 60%
  2. 75%
  3. 90%
  4. 100%

Answer(s): B

Explanation:

The percentage of diverted waste for Materials and Resources Credit, Construction and Demolition Waste Management is calculated by dividing the total weight of diverted materials by the total weight of waste generated. Diverted materials are those that are reused, recycled, salvaged, or donated. In this case, the total weight of diverted materials is:
8 tons (7.3 tonnes) of recycled demolition steel and concrete 6 tons (5.4 tonnes) of used furniture donated to a non-profit organization 1 ton (0.9 tonnes) of removed carpet and ceiling tiles sent back to the manufacturer 40% of 3 tons (2.7 tonnes) of commingled scrap, which is 1.2 tons (1.1 tonnes) The sum of these weights is 16.2 tons (14.7 tonnes). The total weight of waste generated is 20 tons (18.1 tonnes). Therefore, the percentage of diverted waste is:
(16.2 / 20) x 100 = 81%
However, the credit allows for a 10% adjustment for vegetative waste, which is not considered a building material. Therefore, the percentage of diverted waste after adjustment is:
(81 - 10) = 71%
The closest answer option to this value is B. 75%.


Reference:

Construction and Demolition Waste Management
Construction Waste Management
Construction and Demolition Waste Management - Canada Green Building Council



A LEED Building Design and Construction project includes an outdoor stage for theatrical performances. In pursuit of Sustainable Sites Credit, Light Pollution Reduction the engineer has specified an LED fixture to illuminate actors on the stage while limiting light pollution.
Which of the following suggestions should the LEED AP give to the project owner?

  1. Modify the design to enclose the performance areas
  2. Calculate the return on investment over the 20-year life of the project
  3. Compare the energy consumption against an alternative
  4. Inform the owner that the LED fixture is exempt from Sustainable Sites Credit, Light Pollution Reduction

Answer(s): D

Explanation:

The Sustainable Sites Credit, Light Pollution Reduction aims to minimize the adverse effects of artificial lighting on the night sky, human health, and wildlife. However, the credit does not apply to lighting that is required for safety, security, or emergency purposes. According to the LEED Reference Guide for Building Design and Construction, lighting for theatrical performances is considered an emergency purpose and is exempt from the credit requirements. Therefore, the LEED AP should inform the owner that the LED fixture is exempt from Sustainable Sites Credit, Light Pollution Reduction and does not need to be modified or compared to an alternative. Enclosing the performance areas would not reduce light pollution, but rather increase energy consumption and affect the outdoor experience. Calculating the return on investment over the 20-year life of the project is irrelevant to the credit and would not help achieve it.


Reference:

Light Pollution Reduction
Light Pollution Reduction: Sustainable Site Credit for LEED Existing Building O+M [LEED Reference Guide for Building Design and Construction v4], page 581



During the early stages of a LEED for Schools project, the team was able to reduce the number of lighting fixtures in classrooms by 25% because the project team selected paint color whose light reflectance value was 75% instead of the initially proposed 64% value. This strategy is an example of applying which of the following credits to the project?

  1. Innovation Credit, Innovation
  2. Integrative Process Credit
  3. Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control
  4. Materials and Resources Credit, Interiors Life-Cycle Impact Reduction

Answer(s): B

Explanation:

The Integrative Process Credit is a credit in LEED Building Design and Construction that supports high-performance, cost-effective project outcomes through an early analysis of the interrelationships among systems. The credit requires project teams to perform analyses for both energy- and water- related systems before completing the schematic design, and to use the findings to inform the owner's project requirements, basis of design, and design and construction documents. The example given in the question is an illustration of how selecting a paint color with a higher light reflectance value can reduce the energy use and cost of lighting fixtures, which is an energy-related system. This strategy shows how the project team applied an integrative process to evaluate the impacts of different design options on the building performance and environmental benefits. Therefore, the correct answer is B. Integrative Process Credit.


Reference:

Integrative Process



Viewing Page 1 of 62



Share your comments for US Green Building Council LEED-AP-BD-C exam with other users:

Nico 4/23/2023 11:41:00 PM

my 3rd purcahse from this site. these exam dumps are helpful. very helpful.
ITALY


Chere 9/15/2023 4:21:00 AM

found it good
Anonymous


Thembelani 5/30/2023 2:47:00 AM

excellent material
Anonymous


vinesh phale 9/11/2023 2:51:00 AM

very helpfull
UNITED STATES


Bhagiii 11/4/2023 7:04:00 AM

well explained.
Anonymous


Rahul 8/8/2023 9:40:00 PM

i need the pdf, please.
CANADA


CW 7/11/2023 2:51:00 PM

a good source for exam preparation
UNITED STATES


Anchal 10/23/2023 4:01:00 PM

nice questions
INDIA


J Nunes 9/29/2023 8:19:00 AM

i need ielts general training audio guide questions
BRAZIL


Ananya 9/14/2023 5:16:00 AM

please make this content available
UNITED STATES


Swathi 6/4/2023 2:18:00 PM

content is good
Anonymous


Leo 7/29/2023 8:45:00 AM

latest dumps please
INDIA


Laolu 2/15/2023 11:04:00 PM

aside from pdf the test engine software is helpful. the interface is user-friendly and intuitive, making it easy to navigate and find the questions.
UNITED STATES


Zaynik 9/17/2023 5:36:00 AM

questions and options are correct, but the answers are wrong sometimes. so please check twice or refer some other platform for the right answer
Anonymous


Massam 6/11/2022 5:55:00 PM

90% of questions was there but i failed the exam, i marked the answers as per the guide but looks like they are not accurate , if not i would have passed the exam given that i saw about 45 of 50 questions from dump
Anonymous


Anonymous 12/27/2023 12:47:00 AM

answer to this question "what administrative safeguards should be implemented to protect the collected data while in use by manasa and her product management team? " it should be (c) for the following reasons: this administrative safeguard involves controlling access to collected data by ensuring that only individuals who need the data for their job responsibilities have access to it. this helps minimize the risk of unauthorized access and potential misuse of sensitive information. while other options such as (a) documenting data flows and (b) conducting a privacy impact assessment (pia) are important steps in data protection, implementing a "need to know" access policy directly addresses the issue of protecting data while in use by limiting access to those who require it for legitimate purposes. (d) is not directly related to safeguarding data during use; it focuses on data transfers and location.
INDIA


Japles 5/23/2023 9:46:00 PM

password lockout being the correct answer for question 37 does not make sense. it should be geofencing.
Anonymous


Faritha 8/10/2023 6:00:00 PM

for question 4, the righr answer is :recover automatically from failures
UNITED STATES


Anonymous 9/14/2023 4:27:00 AM

question number 4s answer is 3, option c. i
UNITED STATES


p das 12/7/2023 11:41:00 PM

very good questions
UNITED STATES


Anna 1/5/2024 1:12:00 AM

i am confused about the answers to the questions. are the answers correct?
KOREA REPUBLIC OF


Bhavya 9/13/2023 10:15:00 AM

very usefull
Anonymous


Rahul Kumar 8/31/2023 12:30:00 PM

need certification.
CANADA


Diran Ole 9/17/2023 5:15:00 PM

great exam prep
CANADA


Venkata Subbarao Bandaru 6/24/2023 8:45:00 AM

i require dump
Anonymous


D 7/15/2023 1:38:00 AM

good morning, could you please upload this exam again,
Anonymous


Ann 9/15/2023 5:39:00 PM

hi can you please upload the dumps for sap contingent module. thanks
AUSTRALIA


Sridhar 1/16/2024 9:19:00 PM

good questions
Anonymous


Summer 10/4/2023 9:57:00 PM

looking forward to the real exam
Anonymous


vv 12/2/2023 2:45:00 PM

good ones for exam preparation
UNITED STATES


Danny Zas 9/15/2023 4:45:00 AM

this is a good experience
UNITED STATES


SM 1211 10/12/2023 10:06:00 PM

hi everyone
UNITED STATES


A 10/2/2023 6:08:00 PM

waiting for the dump. please upload.
UNITED STATES


Anonymous 7/16/2023 11:05:00 AM

upload cks exam questions
Anonymous