At the time of registering a project in LEED Online, Regional Priority credits are determined based upon the project's

  1. environmental zone
  2. longitude and latitude
  3. ASHRAE 90.1 - 2010 climate zone
  4. Environmental Protection Agency Phase I Assessment

Answer(s): B

Explanation:

At the time of registering a project in LEED Online, Regional Priority credits are determined based on the project's longitude and latitude. Regional Priority credits are bonus points that reward projects for addressing the environmental, social, and public health issues that are most relevant to their location. The project team must enter the project's address and confirm the precise location using the Google Maps interface in LEED Online. The longitude and latitude coordinates are then used to identify the Regional Priority credits that are applicable to the project. The project can earn up to four Regional Priority points by achieving the base credits that correspond to the Regional Priority credits.


Reference:

Regional priority credit lookup | U.S. Green Building Council Regional Priority (RP) credits ­ U.S. Green Building Council



Which of the following activities must be prohibited within a building as a prerequisite to LEED certification?

  1. Burning fossil fuels
  2. Smoking tobacco products
  3. Preparing non-organic foods
  4. Manufacturing toxic chemicals

Answer(s): B

Explanation:

Smoking tobacco products must be prohibited within a building as a prerequisite to LEED certification, according to the Indoor Environmental Quality Prerequisite, Environmental Tobacco Smoke Control. This prerequisite aims to prevent or minimize exposure of building occupants, indoor surfaces, and ventilation air distribution systems to environmental tobacco smoke (ETS), which is a known human carcinogen and a source of indoor air pollution. The prerequisite requires the project to meet one of the following options:
Option 1. No Smoking. Prohibit smoking in the building and within 25 feet (8 meters) of all entries, outdoor air intakes, and operable windows.
Option 2. Smoking Areas. Designate smoking areas outside the building and at least 25 feet (8 meters) from all entries, outdoor air intakes, and operable windows. If smoking areas are enclosed, they must be negatively pressurized and vented directly to the outdoors. Prohibit smoking in all common areas of residential buildings and provide signage to indicate smoking and nonsmoking areas.
The other activities, such as burning fossil fuels, preparing non-organic foods, and manufacturing toxic chemicals, are not explicitly prohibited by any LEED prerequisites, although they may have negative impacts on the environment, health, and energy performance of the building.


Reference:

LEED Reference Guide for Building Design and Construction v4 Environmental Tobacco Smoke Control | U.S. Green Building Council Environmental tobacco smoke (ETS) - World Health Organization Environmental Tobacco Smoke - an overview | ScienceDirect Topics



What is a benefit of including the public in a charrette for a new school before the pre-design phase?

  1. Neighbors can plan for future construction
  2. It will help streamline the permitting process
  3. Potential partnerships with the community can be revealed
  4. The owner can determine financial strategies based on the public's input

Answer(s): C

Explanation:

A charrette is a collaborative design process that involves multiple stakeholders, such as the owner, the design team, the community, and the users. By including the public in a charrette for a new school before the pre-design phase, potential partnerships with the community can be revealed. For example, the school might share facilities or resources with a nearby library, park, or community center. This can enhance the social and environmental benefits of the project, as well as reduce costs and increase efficiency.


Reference:

LEED BD+C Reference Guide, Introduction, page 171; LEED BD+C Reference Guide, Integrative Process, page 291



Which of the following contributes to the value of the commissioning process?

  1. Ensuring that the project budgetary goal is met
  2. Verifying that the building systems perform as intended
  3. Verifying that the building water fixtures are installed properly
  4. Ensuring that the project is delivered to meet the permitting requirements

Answer(s): B

Explanation:

The commissioning process is a quality assurance process that ensures that the building systems perform as intended, based on the owner's project requirements and the design team's basis of design. The commissioning process can provide value to the project by improving energy efficiency, reducing operation and maintenance costs, enhancing occupant comfort and satisfaction, and reducing risks and liabilities.


Reference:

LEED BD+C Reference Guide, Energy and Atmosphere, page 631; LEED BD+C Reference Guide, Enhanced Commissioning, page 661; LEED Building Commissioning: Why You Should Get Accredited



What LEED Building Design and Construction rating system mandates a preliminary LEED meeting with the principal members of the project team to create a LEED action plan that includes the anticipated certification tier, targeted credits and parties responsible for each credit?

  1. Healthcare
  2. Schools
  3. Data centers
  4. Hospitality

Answer(s): C

Explanation:

Data centers is the only LEED BD+C rating system that mandates a preliminary LEED meeting with the principal members of the project team to create a LEED action plan that includes the anticipated certification tier, targeted credits and parties responsible for each credit. This is because data centers have unique design and operational characteristics that require a more integrative and customized approach to achieve LEED certification. The preliminary LEED meeting is intended to facilitate early goal setting, alignment, and communication among the project team members.


Reference:

LEED BD+C Reference Guide, Data Centers, page 91; LEED v4.1 BD+C: Data Centers



Share your comments for US Green Building Council LEED-AP-BD-C exam with other users:

P
PiPi Li
12/12/2023 8:32:00 PM

nice questions

D
Dan
8/10/2023 4:19:00 PM

question 129 is completely wrong.

G
gayathiri
7/6/2023 12:10:00 AM

i need dump

D
Deb
8/15/2023 8:28:00 PM

love the site.

M
Michelle
6/23/2023 4:08:00 AM

can you please upload it back?

A
Ajay
10/3/2023 12:17:00 PM

could you please re-upload this exam? thanks a lot!

H
him
9/30/2023 2:38:00 AM

great about shared quiz

S
San
11/14/2023 12:46:00 AM

goood helping

W
Wang
6/9/2022 10:05:00 PM

pay attention to questions. they are very tricky. i waould say about 80 to 85% of the questions are in this exam dump.

M
Mary
5/16/2023 4:50:00 AM

wish you would allow more free questions

T
thomas
9/12/2023 4:28:00 AM

great simulation

S
Sandhya
12/9/2023 12:57:00 AM

very g inood

A
Agathenta
12/16/2023 1:36:00 PM

q35 should be a

M
MD. SAIFUL ISLAM
6/22/2023 5:21:00 AM

sap c_ts450_2021

S
Satya
7/24/2023 3:18:00 AM

nice questions

S
sk
5/13/2023 2:10:00 AM

ecellent materil for unserstanding

G
Gerard
6/29/2023 11:14:00 AM

good so far

L
Limbo
10/9/2023 3:08:00 AM

this is way too informative

T
Tejasree
8/26/2023 1:46:00 AM

very helpfull

Y
Yolostar Again
10/12/2023 3:02:00 PM

q.189 - answers are incorrect.

S
Shikha Bakra
9/10/2023 5:16:00 PM

awesome job in getting these questions

K
Kevin
10/20/2023 2:01:00 AM

i cant find aws certified practitioner clf-c01 exam in aws website but i found aws certified practitioner clf-c02 exam. can everyone please verify the difference between the two clf-c01 and clf-c02? thank you

D
D Mario
6/19/2023 10:38:00 PM

grazie mille. i got a satisfactory mark in my exam test today because of this exam dumps. sorry for my english.

B
Bharat Kumar Saraf
10/31/2023 4:36:00 AM

some of the answers are incorrect. need to be reviewed.

J
JP
7/13/2023 12:21:00 PM

so far so good

K
Kiky V
8/8/2023 6:32:00 PM

i am really liking it

T
trying
7/28/2023 12:37:00 PM

thanks good stuff

E
exampei
10/4/2023 2:40:00 PM

need dump c_tadm_23

E
Eman Sawalha
6/10/2023 6:18:00 AM

next time i will write a full review

J
johnpaul
11/15/2023 7:55:00 AM

first time using this site

O
omiornil@gmail.com
7/25/2023 9:36:00 AM

please sent me oracle 1z0-1105-22 pdf

J
John
8/29/2023 8:59:00 PM

very helpful

K
Kvana
9/28/2023 12:08:00 PM

good info about oml

C
Checo Lee
7/3/2023 5:45:00 PM

very useful to practice

AI Tutor 👋 I’m here to help!