At the time of registering a project in LEED Online, Regional Priority credits are determined based upon the project's
Answer(s): B
At the time of registering a project in LEED Online, Regional Priority credits are determined based on the project's longitude and latitude. Regional Priority credits are bonus points that reward projects for addressing the environmental, social, and public health issues that are most relevant to their location. The project team must enter the project's address and confirm the precise location using the Google Maps interface in LEED Online. The longitude and latitude coordinates are then used to identify the Regional Priority credits that are applicable to the project. The project can earn up to four Regional Priority points by achieving the base credits that correspond to the Regional Priority credits.
Regional priority credit lookup | U.S. Green Building Council Regional Priority (RP) credits U.S. Green Building Council
Which of the following activities must be prohibited within a building as a prerequisite to LEED certification?
Smoking tobacco products must be prohibited within a building as a prerequisite to LEED certification, according to the Indoor Environmental Quality Prerequisite, Environmental Tobacco Smoke Control. This prerequisite aims to prevent or minimize exposure of building occupants, indoor surfaces, and ventilation air distribution systems to environmental tobacco smoke (ETS), which is a known human carcinogen and a source of indoor air pollution. The prerequisite requires the project to meet one of the following options:Option 1. No Smoking. Prohibit smoking in the building and within 25 feet (8 meters) of all entries, outdoor air intakes, and operable windows.Option 2. Smoking Areas. Designate smoking areas outside the building and at least 25 feet (8 meters) from all entries, outdoor air intakes, and operable windows. If smoking areas are enclosed, they must be negatively pressurized and vented directly to the outdoors. Prohibit smoking in all common areas of residential buildings and provide signage to indicate smoking and nonsmoking areas.The other activities, such as burning fossil fuels, preparing non-organic foods, and manufacturing toxic chemicals, are not explicitly prohibited by any LEED prerequisites, although they may have negative impacts on the environment, health, and energy performance of the building.
LEED Reference Guide for Building Design and Construction v4 Environmental Tobacco Smoke Control | U.S. Green Building Council Environmental tobacco smoke (ETS) - World Health Organization Environmental Tobacco Smoke - an overview | ScienceDirect Topics
What is a benefit of including the public in a charrette for a new school before the pre-design phase?
Answer(s): C
A charrette is a collaborative design process that involves multiple stakeholders, such as the owner, the design team, the community, and the users. By including the public in a charrette for a new school before the pre-design phase, potential partnerships with the community can be revealed. For example, the school might share facilities or resources with a nearby library, park, or community center. This can enhance the social and environmental benefits of the project, as well as reduce costs and increase efficiency.
LEED BD+C Reference Guide, Introduction, page 171; LEED BD+C Reference Guide, Integrative Process, page 291
Which of the following contributes to the value of the commissioning process?
The commissioning process is a quality assurance process that ensures that the building systems perform as intended, based on the owner's project requirements and the design team's basis of design. The commissioning process can provide value to the project by improving energy efficiency, reducing operation and maintenance costs, enhancing occupant comfort and satisfaction, and reducing risks and liabilities.
LEED BD+C Reference Guide, Energy and Atmosphere, page 631; LEED BD+C Reference Guide, Enhanced Commissioning, page 661; LEED Building Commissioning: Why You Should Get Accredited
What LEED Building Design and Construction rating system mandates a preliminary LEED meeting with the principal members of the project team to create a LEED action plan that includes the anticipated certification tier, targeted credits and parties responsible for each credit?
Data centers is the only LEED BD+C rating system that mandates a preliminary LEED meeting with the principal members of the project team to create a LEED action plan that includes the anticipated certification tier, targeted credits and parties responsible for each credit. This is because data centers have unique design and operational characteristics that require a more integrative and customized approach to achieve LEED certification. The preliminary LEED meeting is intended to facilitate early goal setting, alignment, and communication among the project team members.
LEED BD+C Reference Guide, Data Centers, page 91; LEED v4.1 BD+C: Data Centers
Share your comments for US Green Building Council LEED-AP-BD-C exam with other users:
awesome training material
where is dump
q. 289 - the correct answer should be b not d, since the question asks for the most secure way to provide access to a s3 bucket (a single one), and by principle of the least privilege you should not be giving access to all buckets.
please i need if possible h12-831,
good collection of questions and solution for pl500 certification
i would like to appear the exam.
i am very happy as i cleared my comptia a+ 220-1101 exam. i studied from as it has all exam dumps and mock tests available. i got 91% on the test.
need this dump
its really good to eventuate knowledge before appearing for the actual exam.
this is great
please i want the questions to pass the exam
i need to pass exam
great, i appreciate it.
please could you upload (isc)2 certified in cybersecurity (cc) exam questions
good questions, wrong answers
im preparing for exams
question no: 42 isnt azure vm an iaas solution? so, shouldnt the answer be "no"?
im study azure
i need this now
i took the aws saa-c03 test and scored 935/1000. it has all the exam dumps and important info.
good questions
well explained
i got the full version and it helped me pass the exam. pdf version is very good.
provide the download link, please
please upload thank.
please can you share 1z0-1055-22 dump pls
i will wait impatiently. thank youu
is it possible to clear the exam if we focus on only these 156 questions instead of 623 questions? kindly help!
really helped with preparation of my scrum exam
very informative and through explanations
prep for exam
thanks for helping us
i prepared for the eccouncil 350-401 exam. i scored 92% on the test.
aba questions to practice