US Green Building Council LEED-AP-ID-C Exam (page: 3)
US Green Building Council LEED AP Interior Design + Construction V4
Updated on: 12-Feb-2026

Viewing Page 3 of 21

A project has access to two alternative water sources. How should they determine which source to use where?

  1. A project may not use two alternative water sources
  2. Target the uses that require the least treatment first, such as toilet flushing or irrigation
  3. Match uses by location: indoor sources to indoor uses, outdoor sources to outdoor uses
  4. All sources should be treated to potable water standards and used to supplement the municipal supply

Answer(s): B

Explanation:

When a project has access to two alternative water sources, the strategy is to use the source that requires the least amount of treatment for applications where water quality is less critical. This approach is efficient and sustainable as it reduces the need for extensive treatment processes. For instance, using untreated rainwater for irrigation or treated greywater for toilet flushing makes practical and environmental sense.


Reference:

LEED v4: Interior Design + Construction Guide2

LEED v4 water efficiency credits and standards3



Source reduction appears at the top of the Environmental Protection Agency's (EPA's) hierarchy because it

  1. reduces environmental impacts by reusing existing materials
  2. reduces environmental impacts associated with material containing high levels of toxic chemicals
  3. reduces environmental impacts throughout the material's life cycle by specifying recycled content in the material selected
  4. reduces environmental impacts throughout the material's life cycle, from the supply chain and use to recycling and waste disposal

Answer(s): D

Explanation:

According to the EPA's hierarchy, source reduction is prioritized because it addresses the environmental impacts of materials across their entire life cycle. This includes the extraction of raw materials, manufacturing, distribution, usage, and end-of-life management, including recycling and disposal. By reducing the amount of material used, source reduction minimizes the environmental footprint throughout the entire process.


Reference:

The explanation aligns with the principles outlined in the EPA's waste management hierarchy, which emphasizes the importance of source reduction as the most preferred approach to managing materials and waste streams. This is also consistent with the sustainable materials management strategies detailed in the LEED v4 Reference Guide for Interior Design and Construction.



An owner has expressed concerns to the LEED AP about the costs associated with the integrative process. How can the LEED AP relieve the owner's concerns?

  1. The LEED AP should explain to the owner that since the integrative process is not a prerequisite, it can be dropped from the project thus cutting back project costs
  2. The LEED AP should explain that while the first costs and the design fees will be higher due to the integrative process, the operational savings will make up for the extra costs
  3. The LEED AP should explain that the integrative process can easily be postponed and reconsidered until after the design for the construction phase, when it will most likely save costs for the project
  4. The LEED AP should explain that the integrative process reduces costs by avoiding delays associated with design changes during the construction document phase and reducing change orders during construction

Answer(s): D

Explanation:

The integrative process is a strategy that can lead to both immediate and long-term cost savings. By engaging in early analysis of the interrelationships among systems, the project team can identify unique opportunities and challenges. This early engagement helps to optimize the design, which can reduce the time and cost associated with making design changes later in the project and minimize the need for change orders during construction.


Reference:

Understanding Integrative Design in LEEDv4 - BuildingGreen. LEED v4 for Interior Design and Construction (ID+C): Reference Guide. New LEED Integrative Process Credit Encourages Design-Build.



To satisfy the Increased Ventilation strategy in the Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, the breathing zone rates of outdoor air ventilation to all occupied spaces must be increased above the minimum rates required in ASHRAE 62.1-2010 by at least what percentage?

  1. 10%
  2. 20%
  3. 30%
  4. 50%

Answer(s): C

Explanation:

To meet the Increased Ventilation strategy under the Enhanced Indoor Air Quality Strategies credit, the breathing zone outdoor air ventilation rates must be increased by at least 30% above the minimum rates required by ASHRAE 62.1-2010. This increase is intended to improve indoor air quality and promote a healthier indoor environment.


Reference:

The LEED v4 reference guide for Interior Design and Construction includes this requirement as part of the strategies to enhance indoor air quality.



Which of the following phases should be included in the Integrative Process Credit, Integrative Process in order to comply with the intent of this credit?

  1. Discovery; design and construction; occupancy; operations and feedback
  2. Discovery and design; construction and occupancy; post occupancy and operations
  3. Pre-design and design; construction and occupancy; post occupancy and operations
  4. Pre-design and design; construction and pre-occupancy; post occupancy and operations

Answer(s): A

Explanation:

The Integrative Process Credit under LEED AP Interior Design + Construction V4 emphasizes the importance of a holistic approach that includes various phases of a project. The correct phases that should be included to comply with the intent of this credit are Discovery, Design and Construction, Occupancy, Operations, and Feedback. This approach ensures that sustainable strategies are integrated from the earliest stages of the project and continue through to post-occupancy to maximize performance and sustainability.


Reference:

The LEED v4 Reference Guide for Interior Design and Construction provides detailed guidance on the Integrative Process Credit, highlighting the need for a comprehensive approach that spans the entire project timeline.



Viewing Page 3 of 21



Share your comments for US Green Building Council LEED-AP-ID-C exam with other users:

MS 1/19/2024 2:56:00 PM

question no: 42 isnt azure vm an iaas solution? so, shouldnt the answer be "no"?
Anonymous


keylly 11/28/2023 10:10:00 AM

im study azure
Anonymous


dorcas 9/22/2023 8:08:00 AM

i need this now
Anonymous


treyf 11/9/2023 5:13:00 AM

i took the aws saa-c03 test and scored 935/1000. it has all the exam dumps and important info.
UNITED STATES


anonymous 1/11/2024 4:50:00 AM

good questions
Anonymous


Anjum 9/23/2023 6:22:00 PM

well explained
Anonymous


Thakor 6/7/2023 11:52:00 PM

i got the full version and it helped me pass the exam. pdf version is very good.
INDIA


sartaj 7/18/2023 11:36:00 AM

provide the download link, please
INDIA


loso 7/25/2023 5:18:00 AM

please upload thank.
THAILAND


Paul 6/23/2023 7:12:00 AM

please can you share 1z0-1055-22 dump pls
UNITED STATES


exampei 10/7/2023 8:14:00 AM

i will wait impatiently. thank youu
Anonymous


Prince 10/31/2023 9:09:00 PM

is it possible to clear the exam if we focus on only these 156 questions instead of 623 questions? kindly help!
Anonymous


Ali Azam 12/7/2023 1:51:00 AM

really helped with preparation of my scrum exam
Anonymous


Jerman 9/29/2023 8:46:00 AM

very informative and through explanations
Anonymous


Jimmy 11/4/2023 12:11:00 PM

prep for exam
INDONESIA


Abhi 9/19/2023 1:22:00 PM

thanks for helping us
Anonymous


mrtom33 11/20/2023 4:51:00 AM

i prepared for the eccouncil 350-401 exam. i scored 92% on the test.
Anonymous


JUAN 6/28/2023 2:12:00 AM

aba questions to practice
UNITED STATES


LK 1/2/2024 11:56:00 AM

great content
Anonymous


Srijeeta 10/8/2023 6:24:00 AM

how do i get the remaining questions?
INDIA


Jovanne 7/26/2022 11:42:00 PM

well formatted pdf and the test engine software is free. well worth the money i sept.
ITALY


CHINIMILLI SATISH 8/29/2023 6:22:00 AM

looking for 1z0-116
Anonymous


Pedro Afonso 1/15/2024 8:01:00 AM

in question 22, shouldnt be in the data (option a) layer?
Anonymous


Pushkar 11/7/2022 12:12:00 AM

the questions are incredibly close to real exam. you people are amazing.
INDIA


Ankit S 11/13/2023 3:58:00 AM

q15. answer is b. simple
UNITED STATES


S. R 12/8/2023 9:41:00 AM

great practice
FRANCE


Mungara 3/14/2023 12:10:00 AM

thanks to this exam dumps, i felt confident and passed my exam with ease.
UNITED STATES


Anonymous 7/25/2023 2:55:00 AM

need 1z0-1105-22 exam
Anonymous


Nigora 5/31/2022 10:05:00 PM

this is a beautiful tool. passed after a week of studying.
UNITED STATES


Av dey 8/16/2023 2:35:00 PM

can you please upload the dumps for 1z0-1096-23 for oracle
INDIA


Mayur Shermale 11/23/2023 12:22:00 AM

its intresting, i would like to learn more abouth this
JAPAN


JM 12/19/2023 2:23:00 PM

q252: dns poisoning is the correct answer, not locator redirection. beaconing is detected from a host. this indicates that the system has been infected with malware, which could be the source of local dns poisoning. location redirection works by either embedding the redirection in the original websites code or having a user click on a url that has an embedded redirect. since users at a different office are not getting redirected, it isnt an embedded redirection on the original website and since the user is manually typing in the url and not clicking a link, it isnt a modified link.
UNITED STATES


Freddie 12/12/2023 12:37:00 PM

helpful dump questions
SOUTH AFRICA


Da Costa 8/25/2023 7:30:00 AM

question 423 eigrp uses metric
Anonymous