A tenant implements the following strategies to reduce the amount of water used.
Which strategy is applicable to the Water Efficiency Credit, Indoor Water Use Reduction for LEED Interior Design and Construction: Commercial Interiors?

  1. Composting toilet
  2. Low-flow irrigation system
  3. Commercial clothes washer
  4. Roof runoff for chiller make-up water

Answer(s): A

Explanation:

The composting toilet is applicable to the Water Efficiency Credit, Indoor Water Use Reduction for LEED Interior Design and Construction: Commercial Interiors because it significantly reduces the amount of water used for conventional flushing toilets. By composting human waste, this system eliminates the need for water in the disposal process, contributing to indoor water use reduction.


Reference:

The LEED v4 Reference Guide for Interior Design and Construction includes the composting toilet as a strategy for reducing water use within the indoor environment. The LEED v4 Indoor Water Use Reduction Calculator also provides a framework for calculating water savings, where the use of composting toilets can contribute to achieving the prerequisite and credit requirements for water use reduction.



Which of the following must be considered in order to meet Energy and Atmosphere Prerequisite, Fundamental Refrigerant Management if the tenant requires 24-hour cooling in a server room?

  1. Base-building chiller specifications
  2. CFC-free refrigerants in tenant cooling units
  3. Temperature monitoring of building cooling water
  4. ENERGY STAR® compliant cooling units with low CFCs

Answer(s): B



A tenant with 1,000 employees wishes to pursue LEED Interior Design and Construction Certification for their space in which they will be the sole tenant.
Which of the following building attributes will help the tenant achieve points in the Location and Transportation category?

  1. A car sharing program
  2. 60 bike racks and seven shower/changing rooms
  3. Electric car charging stations in the parking garage
  4. A bus line with 30 daily rides with a bus stop within 1/2 mi. (0.80 km) of the building entrance

Answer(s): B

Explanation:

To comply with the Energy and Atmosphere Prerequisite, Fundamental Refrigerant Management, especially for a server room that requires 24-hour cooling, it's essential to use refrigerants that have no ozone depletion potential and low global warming potential. CFC-free refrigerants in tenant cooling units are necessary to meet this prerequisite, as they minimize the environmental impact of the refrigerants used.


Reference:

The LEED reference guide for Interior Design and Construction outlines the requirements for the Fundamental Refrigerant Management prerequisite. It specifies that projects must not use CFC-based refrigerants or must plan to phase out such refrigerants in favor of alternatives with lower environmental impact.



If the client has purchased green power that is not Green-e certified, then the project team should

  1. accept not earning Energy and Atmosphere Credit, Green Power
  2. provide documentation as to how the green power is equivalent to Green-e certified
  3. apply for an Innovation Credit and explain the situation in a narrative
  4. apply the percentage to Energy and Atmosphere Credit, Renewable Energy Generation

Answer(s): B

Explanation:

When green power is not Green-e certified, the project team can still pursue the Energy and Atmosphere Credit for Green Power by demonstrating that the purchased green power meets equivalent standards. This involves providing documentation that verifies the green power's quality and production process align with the criteria set by Green-e certification.


Reference:

The LEED v4 Reference Guide for Interior Design and Construction includes provisions for using green power that is not Green-e certified, as long as the project team can substantiate its equivalence. This can be done through third-party verification and ensuring that the energy source meets the requirements for renewable resources detailed in the current version of the Green-e standard.



Discussing the project goals to help identify the credits and options that the team should attempt is an example of

  1. documenting LEED credits
  2. creating the Basis of Design
  3. developing the LEED Scorecard
  4. implementing the Commissioning Plan

Answer(s): C

Explanation:

The process of discussing project goals to identify the credits and options that the team should attempt aligns with the development of the LEED Scorecard. The LEED Scorecard is a tool used to track the credits pursued and points earned by a project, guiding the team in selecting the most appropriate and beneficial credits to achieve their sustainability objectives.


Reference:

LEED v4: Interior Design + Construction Guide2
LEED scorecard overview and resources1



Share your comments for US Green Building Council LEED-AP-ID-C exam with other users:

J
Jaro
12/18/2023 3:12:00 PM

i think in question 7 the first answer should be power bi portal (not power bi)

9
9eagles
4/7/2023 10:04:00 AM

on question 10 and so far 2 wrong answers as evident in the included reference link.

T
Tai
8/28/2023 5:28:00 AM

wonderful material

V
VoiceofMidnight
12/29/2023 4:48:00 PM

i passed!! ...but barely! got 728, but needed 720 to pass. the exam hit me with labs right out of the gate! then it went to multiple choice. protip: study the labs!

A
A K
8/3/2023 11:56:00 AM

correct answer for question 92 is c -aws shield

N
Nitin Mindhe
11/27/2023 6:12:00 AM

great !! it is really good

B
BailleyOne
11/22/2023 1:45:00 AM

explanations for the answers are to the point.

P
patel
10/25/2023 8:17:00 AM

how can rea next

M
MortonG
10/19/2023 6:32:00 PM

question: 128 d is the wrong answer...should be c

J
Jayant
11/2/2023 3:15:00 AM

thanks for az 700 dumps

B
Bipul Mishra
12/14/2023 7:12:00 AM

thank you for this tableau dumps . it will helpfull for tableau certification

H
hello
10/31/2023 12:07:00 PM

good content

M
Matheus
9/3/2023 2:14:00 PM

just testing if the comments are real

Y
yenvti2@gmail.com
8/12/2023 7:56:00 PM

very helpful for exam preparation

M
Miguel
10/5/2023 12:16:00 PM

question 11: https://help.salesforce.com/s/articleview?id=sf.admin_lead_to_patient_setup_overview.htm&type=5

N
Noushin
11/28/2023 4:52:00 PM

i think the answer to question 42 is b not c

S
susan sandivore
8/28/2023 1:00:00 AM

thanks for the dump

A
Aderonke
10/31/2023 12:51:00 AM

fantastic assessments

P
Priscila
7/22/2022 9:59:00 AM

i find the xengine test engine simulator to be more fun than reading from pdf.

S
suresh
12/16/2023 10:54:00 PM

nice document

W
Wali
6/4/2023 10:07:00 PM

thank you for making the questions and answers intractive and selectable.

N
Nawaz
7/18/2023 1:10:00 AM

answers are correct?

D
das
6/23/2023 7:57:00 AM

can i belive this dump

S
Sanjay
10/15/2023 1:34:00 PM

great site to practice for sitecore exam

J
jaya
12/17/2023 8:36:00 AM

good for students

B
Bsmaind
8/20/2023 9:23:00 AM

nice practice dumps

K
kumar
11/15/2023 11:24:00 AM

nokia 4a0-114 dumps

V
Vetri
10/3/2023 12:59:00 AM

great content and wonderful to have the answers with explanation

R
Ranjith
8/21/2023 3:39:00 PM

for question #118, the answer is option c. the screen shot is showing the drop down, but the answer is marked incorrectly please update . thanks for sharing such nice questions.

E
Eduardo Ramírez
12/11/2023 9:55:00 PM

the correct answer for the question 29 is d.

D
Dass
11/2/2023 7:43:00 AM

question no 22: correct answers: bc, 1 per session 1 per page 1 per component always

R
Reddy
12/14/2023 2:42:00 AM

these are pretty useful

D
Daisy Delgado
1/9/2023 1:05:00 PM

awesome

A
Atif
6/13/2023 4:09:00 AM

yes please upload

AI Tutor 👋 I’m here to help!