US Green Building Council LEED AP Interior Design + Construction V4 LEED-AP-ID-C Dumps in PDF

Free US Green Building Council LEED-AP-ID-C Real Questions (page: 17)

A tenant implements the following strategies to reduce the amount of water used.
Which strategy is applicable to the Water Efficiency Credit, Indoor Water Use Reduction for LEED Interior Design and Construction: Commercial Interiors?

  1. Composting toilet
  2. Low-flow irrigation system
  3. Commercial clothes washer
  4. Roof runoff for chiller make-up water

Answer(s): A

Explanation:

The composting toilet is applicable to the Water Efficiency Credit, Indoor Water Use Reduction for LEED Interior Design and Construction: Commercial Interiors because it significantly reduces the amount of water used for conventional flushing toilets. By composting human waste, this system eliminates the need for water in the disposal process, contributing to indoor water use reduction.


Reference:

The LEED v4 Reference Guide for Interior Design and Construction includes the composting toilet as a strategy for reducing water use within the indoor environment. The LEED v4 Indoor Water Use Reduction Calculator also provides a framework for calculating water savings, where the use of composting toilets can contribute to achieving the prerequisite and credit requirements for water use reduction.



Which of the following must be considered in order to meet Energy and Atmosphere Prerequisite, Fundamental Refrigerant Management if the tenant requires 24-hour cooling in a server room?

  1. Base-building chiller specifications
  2. CFC-free refrigerants in tenant cooling units
  3. Temperature monitoring of building cooling water
  4. ENERGY STAR® compliant cooling units with low CFCs

Answer(s): B



A tenant with 1,000 employees wishes to pursue LEED Interior Design and Construction Certification for their space in which they will be the sole tenant.
Which of the following building attributes will help the tenant achieve points in the Location and Transportation category?

  1. A car sharing program
  2. 60 bike racks and seven shower/changing rooms
  3. Electric car charging stations in the parking garage
  4. A bus line with 30 daily rides with a bus stop within 1/2 mi. (0.80 km) of the building entrance

Answer(s): B

Explanation:

To comply with the Energy and Atmosphere Prerequisite, Fundamental Refrigerant Management, especially for a server room that requires 24-hour cooling, it's essential to use refrigerants that have no ozone depletion potential and low global warming potential. CFC-free refrigerants in tenant cooling units are necessary to meet this prerequisite, as they minimize the environmental impact of the refrigerants used.


Reference:

The LEED reference guide for Interior Design and Construction outlines the requirements for the Fundamental Refrigerant Management prerequisite. It specifies that projects must not use CFC-based refrigerants or must plan to phase out such refrigerants in favor of alternatives with lower environmental impact.



If the client has purchased green power that is not Green-e certified, then the project team should

  1. accept not earning Energy and Atmosphere Credit, Green Power
  2. provide documentation as to how the green power is equivalent to Green-e certified
  3. apply for an Innovation Credit and explain the situation in a narrative
  4. apply the percentage to Energy and Atmosphere Credit, Renewable Energy Generation

Answer(s): B

Explanation:

When green power is not Green-e certified, the project team can still pursue the Energy and Atmosphere Credit for Green Power by demonstrating that the purchased green power meets equivalent standards. This involves providing documentation that verifies the green power's quality and production process align with the criteria set by Green-e certification.


Reference:

The LEED v4 Reference Guide for Interior Design and Construction includes provisions for using green power that is not Green-e certified, as long as the project team can substantiate its equivalence. This can be done through third-party verification and ensuring that the energy source meets the requirements for renewable resources detailed in the current version of the Green-e standard.



Discussing the project goals to help identify the credits and options that the team should attempt is an example of

  1. documenting LEED credits
  2. creating the Basis of Design
  3. developing the LEED Scorecard
  4. implementing the Commissioning Plan

Answer(s): C

Explanation:

The process of discussing project goals to identify the credits and options that the team should attempt aligns with the development of the LEED Scorecard. The LEED Scorecard is a tool used to track the credits pursued and points earned by a project, guiding the team in selecting the most appropriate and beneficial credits to achieve their sustainability objectives.


Reference:

LEED v4: Interior Design + Construction Guide2
LEED scorecard overview and resources1



Share your comments for US Green Building Council LEED-AP-ID-C exam with other users:

A
Antony
11/23/2023 11:36:00 AM

this looks accurate

E
Ethan
8/23/2023 12:52:00 AM

question 46, the answer should be data "virtualization" (not visualization).

N
nSiva
9/22/2023 5:58:00 AM

its useful.

R
Ranveer
7/26/2023 7:26:00 PM

Pass this exam 3 days ago. The PDF version and the Xengine App is quite useful.

S
Sanjay
8/15/2023 10:22:00 AM

informative for me.

T
Tom
12/12/2023 8:53:00 PM

question 134s answer shoule be "dlp"

A
Alex
11/7/2023 11:02:00 AM

in 72 the answer must be [sys_user_has_role] table.

F
Finn
5/4/2023 10:21:00 PM

i appreciated the mix of multiple-choice and short answer questions. i passed my exam this morning.

A
AJ
7/13/2023 8:33:00 AM

great to find this website, thanks

C
Curtis Nakawaki
6/29/2023 9:11:00 PM

examination questions seem to be relevant.

U
Umashankar Sharma
10/22/2023 9:39:00 AM

planning to take psm test

E
ED SHAW
7/31/2023 10:34:00 AM

please allow to download

A
AD
7/22/2023 11:29:00 AM

please provide dumps

A
Ayyjayy
11/6/2023 7:29:00 AM

is the answer to question 15 correct ? i feel like the answer should be b

B
Blessious Phiri
8/12/2023 11:56:00 AM

its getting more technical

J
Jeanine J
7/11/2023 3:04:00 PM

i think these questions are what i need.

A
Aderonke
10/23/2023 2:13:00 PM

helpful assessment

T
Tom
1/5/2024 2:32:00 AM

i am confused about the answers to the questions. do you know if the answers are correct?

V
Vinit N.
8/28/2023 2:33:00 AM

hi, please make the dumps available for my upcoming examination.

S
Sanyog Deshpande
9/14/2023 7:05:00 AM

good practice

T
Tyron
9/8/2023 12:12:00 AM

so far it is really informative

B
beast
7/30/2023 2:22:00 PM

hi i want it please please upload it

M
Mirex
5/26/2023 3:45:00 AM

am preparing for exam ,just nice questions

E
exampei
8/7/2023 8:05:00 AM

please upload c_tadm_23 exam

A
Anonymous
9/12/2023 12:50:00 PM

can we get tdvan4 vantage data engineering pdf?

A
Aish
10/11/2023 5:51:00 AM

want to clear the exam.

S
Smaranika
6/22/2023 8:42:00 AM

could you please upload the dumps of sap c_sac_2302

B
Blessious Phiri
8/15/2023 1:56:00 PM

asm management configuration is about storage

L
Lewis
7/6/2023 8:49:00 PM

kool thumb up

M
Moreece
5/15/2023 8:44:00 AM

just passed the az-500 exam this last friday. most of the questions in this exam dumps are in the exam. i bought the full version and noticed some of the questions which were answered wrong in the free version are all corrected in the full version. this site is good but i wish the had it in an interactive version like a test engine simulator.

T
Terry
5/24/2023 4:41:00 PM

i can practice for exam

E
Emerys
7/29/2023 6:55:00 AM

please i need this exam.

G
Goni Mala
9/2/2023 12:27:00 PM

i need the dump

L
Lenny
9/29/2023 11:30:00 AM

i want it bad, even if cs6 maybe retired, i want to learn cs6

AI Tutor 👋 I’m here to help!