A tenant implements the following strategies to reduce the amount of water used.
Which strategy is applicable to the Water Efficiency Credit, Indoor Water Use Reduction for LEED Interior Design and Construction: Commercial Interiors?

  1. Composting toilet
  2. Low-flow irrigation system
  3. Commercial clothes washer
  4. Roof runoff for chiller make-up water

Answer(s): A

Explanation:

The composting toilet is applicable to the Water Efficiency Credit, Indoor Water Use Reduction for LEED Interior Design and Construction: Commercial Interiors because it significantly reduces the amount of water used for conventional flushing toilets. By composting human waste, this system eliminates the need for water in the disposal process, contributing to indoor water use reduction.


Reference:

The LEED v4 Reference Guide for Interior Design and Construction includes the composting toilet as a strategy for reducing water use within the indoor environment. The LEED v4 Indoor Water Use Reduction Calculator also provides a framework for calculating water savings, where the use of composting toilets can contribute to achieving the prerequisite and credit requirements for water use reduction.



Which of the following must be considered in order to meet Energy and Atmosphere Prerequisite, Fundamental Refrigerant Management if the tenant requires 24-hour cooling in a server room?

  1. Base-building chiller specifications
  2. CFC-free refrigerants in tenant cooling units
  3. Temperature monitoring of building cooling water
  4. ENERGY STAR® compliant cooling units with low CFCs

Answer(s): B



A tenant with 1,000 employees wishes to pursue LEED Interior Design and Construction Certification for their space in which they will be the sole tenant.
Which of the following building attributes will help the tenant achieve points in the Location and Transportation category?

  1. A car sharing program
  2. 60 bike racks and seven shower/changing rooms
  3. Electric car charging stations in the parking garage
  4. A bus line with 30 daily rides with a bus stop within 1/2 mi. (0.80 km) of the building entrance

Answer(s): B

Explanation:

To comply with the Energy and Atmosphere Prerequisite, Fundamental Refrigerant Management, especially for a server room that requires 24-hour cooling, it's essential to use refrigerants that have no ozone depletion potential and low global warming potential. CFC-free refrigerants in tenant cooling units are necessary to meet this prerequisite, as they minimize the environmental impact of the refrigerants used.


Reference:

The LEED reference guide for Interior Design and Construction outlines the requirements for the Fundamental Refrigerant Management prerequisite. It specifies that projects must not use CFC-based refrigerants or must plan to phase out such refrigerants in favor of alternatives with lower environmental impact.



If the client has purchased green power that is not Green-e certified, then the project team should

  1. accept not earning Energy and Atmosphere Credit, Green Power
  2. provide documentation as to how the green power is equivalent to Green-e certified
  3. apply for an Innovation Credit and explain the situation in a narrative
  4. apply the percentage to Energy and Atmosphere Credit, Renewable Energy Generation

Answer(s): B

Explanation:

When green power is not Green-e certified, the project team can still pursue the Energy and Atmosphere Credit for Green Power by demonstrating that the purchased green power meets equivalent standards. This involves providing documentation that verifies the green power's quality and production process align with the criteria set by Green-e certification.


Reference:

The LEED v4 Reference Guide for Interior Design and Construction includes provisions for using green power that is not Green-e certified, as long as the project team can substantiate its equivalence. This can be done through third-party verification and ensuring that the energy source meets the requirements for renewable resources detailed in the current version of the Green-e standard.



Discussing the project goals to help identify the credits and options that the team should attempt is an example of

  1. documenting LEED credits
  2. creating the Basis of Design
  3. developing the LEED Scorecard
  4. implementing the Commissioning Plan

Answer(s): C

Explanation:

The process of discussing project goals to identify the credits and options that the team should attempt aligns with the development of the LEED Scorecard. The LEED Scorecard is a tool used to track the credits pursued and points earned by a project, guiding the team in selecting the most appropriate and beneficial credits to achieve their sustainability objectives.


Reference:

LEED v4: Interior Design + Construction Guide2
LEED scorecard overview and resources1



Share your comments for US Green Building Council LEED-AP-ID-C exam with other users:

F
Future practitioner
8/10/2023 1:26:00 PM

question 4 answer is c. this site shows the correct answer as b. "adopt a consumption model" is clearly a cost optimization design principle. looks like im done using this site to study!!!

A
Ace
8/3/2023 10:37:00 AM

number 52 answer is d

N
Nathan
12/17/2023 12:04:00 PM

just started preparing for my exam , and this site is so much help

C
Corey
12/29/2023 5:06:00 PM

question 35 is incorrect, the correct answer is c, it even states so: explanation: when a vm is infected with ransomware, you should not restore the vm to the infected vm. this is because the ransomware will still be present on the vm, and it will encrypt the files again. you should also not restore the vm to any vm within the companys subscription. this is because the ransomware could spread to other vms in the subscription. the best way to restore a vm that is infected with ransomware is to restore it to a new azure vm. this will ensure that the ransomware is not present on the new vm.

R
Rajender
10/18/2023 3:54:00 AM

i would like to take psm1 exam.

B
Blessious Phiri
8/14/2023 9:53:00 AM

cbd and pdb are key to the database

A
Alkaed
10/19/2022 10:41:00 AM

the purchase and download process is very much streamlined. the xengine application is very nice and user-friendly but there is always room for improvement.

D
Dave Gregen
9/4/2023 3:17:00 PM

please upload p_sapea_2023

S
Sarah
6/13/2023 1:42:00 PM

anyone use this? the question dont seem to follow other formats and terminology i have been studying im getting worried

S
Shuv
10/3/2023 8:19:00 AM

good questions

R
Reb974
8/5/2023 1:44:00 AM

hello are these questions valid for ms-102

M
Mchal
7/20/2023 3:38:00 AM

some questions are wrongly answered but its good nonetheless

S
Sonbir
8/8/2023 1:04:00 PM

how to get system serial number using intune

M
Manju
10/19/2023 1:19:00 PM

is it really helpful to pass the exam

L
LeAnne Hair
8/24/2023 12:47:00 PM

#229 in incorrect - all the customers require an annual review

A
Abdul SK
9/28/2023 11:42:00 PM

kindy upload

A
Aderonke
10/23/2023 12:53:00 PM

fantastic assessment on psm 1

S
SAJI
7/20/2023 2:51:00 AM

56 question correct answer a,b

R
Raj Kumar
10/23/2023 8:52:00 PM

thank you for providing the q bank

P
piyush keshari
7/7/2023 9:46:00 PM

true quesstions

B
B.A.J
11/6/2023 7:01:00 AM

i can´t believe ms asks things like this, seems to be only marketing material.

G
Guss
5/23/2023 12:28:00 PM

hi, could you please add the last update of ns0-527

R
Rond65
8/22/2023 4:39:00 PM

question #3 refers to vnet4 and vnet5. however, there is no vnet5 listed in the case study (testlet 2).

C
Cheers
12/13/2023 9:55:00 AM

sometimes it may be good some times it may be

S
Sumita Bose
7/21/2023 1:01:00 AM

qs 4 answer seems wrong- please check

A
Amit
9/7/2023 12:53:00 AM

very detailed explanation !

F
FisherGirl
5/16/2022 10:36:00 PM

the interactive nature of the test engine application makes the preparation process less boring.

C
Chiranthaka
9/20/2023 11:15:00 AM

very useful.

S
SK
7/15/2023 3:51:00 AM

complete question dump should be made available for practice.

G
Gamerrr420
5/25/2022 9:38:00 PM

i just passed my first exam. i got 2 exam dumps as part of the 50% sale. my second exam is under work. once i write that exam i report my result. but so far i am confident.

K
Kudu hgeur
9/21/2023 5:58:00 PM

nice create dewey stefen

A
Anorag
9/6/2023 9:24:00 AM

i just wrote this exam and it is still valid. the questions are exactly the same but there are about 4 or 5 questions that are answered incorrectly. so watch out for those. best of luck with your exam.

N
Nathan
1/10/2023 3:54:00 PM

passed my exam today. this is a good start to 2023.

1
1
10/28/2023 7:32:00 AM

great sharing

AI Tutor 👋 I’m here to help!