US Green Building Council LEED AP Interior Design + Construction V4 LEED-AP-ID-C Dumps in PDF

Free US Green Building Council LEED-AP-ID-C Real Questions (page: 2)

The project material costs for Building Product Disclosure and Optimization cost-based credits are

  1. actual costs, furniture included
  2. default costs, 30% of total construction cost
  3. actual costs, furniture optional
  4. default costs, 40% of total construction cost

Answer(s): C

Explanation:

The costs considered for Building Product Disclosure and Optimization (BPDO) cost-based credits should reflect the actual costs of the materials used in the project. Furniture is considered optional for these calculations. This approach allows for flexibility in reporting and aligns with the intent of the BPDO credits to encourage the use of sustainable materials.


Reference:

The information is based on the guidelines provided by the U.S. Green Building Council for LEED v4 ID+C MR Credits Building Product Disclosure and Optimization.



Best practices recommend that the LEED AP confirm that minimum program requirements have been met

  1. as part of the discovery phase
  2. as part of the final certification submittal
  3. after the design phase but before construction
  4. after the Commissioning (Cx) review but before design phase submittal

Answer(s): A

Explanation:

Best practices for ensuring that minimum program requirements (MPRs) for LEED certification are met involve confirming these requirements early in the project lifecycle. Specifically, this confirmation should occur during the discovery phase, which is the initial stage of a project. The discovery phase involves beginning initial research and analysis, and when sufficient information has been gathered, a goal-setting workshop is held to discuss findings. Part of these findings should include checking that the project complies with the MPRs for the applicable LEED rating system. Confirming MPRs during this early phase helps in setting a clear direction for the project and ensures that all subsequent work is aligned with LEED's fundamental requirements, facilitating a smoother certification process.


Reference:

Excerpt from the document outlining the process and importance of checking minimum program requirements as part of the project's initial stages, specifically during the discovery phase .



What should a team focus on first to significantly improve energy performance or achieve the lowest possible operation cost?

  1. Choosing energy efficient systems
  2. Conducting a simple box energy model
  3. Implementing passive design strategies
  4. Performing commissioning of energy systems

Answer(s): C

Explanation:

Implementing passive design strategies should be the primary focus as they utilize the climate to maintain a comfortable temperature range in the building, reducing the reliance on mechanical heating and cooling systems. This approach can significantly improve energy performance and reduce operational costs by maximizing natural heating, cooling, and daylighting before considering mechanical or electrical systems.


Reference:

The LEED v4 Reference Guide for Interior Design and Construction emphasizes the importance of passive design strategies within the integrative process for optimizing energy performance. Additionally, the LEED v4 energy update reflects a focus on increased energy efficiency and greenhouse gas emissions reductions, which can be effectively addressed through passive design.



A project is pursuing Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control.
Which lighting control could the design team specify to meet the credit requirements for open-office workstations?

  1. Standard on-off switches at each workstation
  2. Plug-in task light at each workstation that allow for on, off and a 50% light level
  3. Overhead lighting for the open-office space with fully automatic dimming via daylight sensors for the space
  4. Overhead lighting for the open-office space with controls that allow for on, off and a 50% light level for the space

Answer(s): D

Explanation:

To meet the requirements for Indoor Environmental Quality Credit, Interior Lighting, Option 1, the design team should specify lighting controls that enable adjustments to suit individual tasks and preferences. This includes providing controls that allow for on, off, and at least one intermediate light level, such as 50%. Overhead lighting with these controls for the open-office space would meet this criterion.


Reference:

The LEED reference guide for Interior Design and Construction provides detailed information on the requirements for lighting controls under the Indoor Environmental Quality Credit, Interior Lighting, Option 1. Specifically, it states that for at least 90% of individual occupant spaces, there must be individual lighting controls that enable occupants to adjust the lighting to suit their tasks and preferences, with at least three lighting levels or scenes (on, off, midlevel) 1.



A tenant moving into an existing building will need to install new HVAC, power, lighting systems and other equipment.
Which of the following resources would help the tenant meet the requirements of Energy and Atmosphere Credit, Optimize Energy Performance?

  1. Green Seal Standard 11
  2. ANSI/ASHRAE Standard 62.1-2010
  3. ANSI/ASHRAE/IESNA Standard 90.1-2010
  4. South Coast Air Quality Management District (SCAQMD)

Answer(s): C

Explanation:

The ANSI/ASHRAE/IESNA Standard 90.1-2010 is the benchmark for energy efficiency in building design, providing minimum requirements for the energy-efficient design of buildings except low-rise residential buildings. It is directly referenced in LEED v4 for the Energy and Atmosphere Credit, Optimize Energy Performance, as it sets the baseline for energy performance.


Reference:

The LEED v4 Reference Guide for Interior Design and Construction specifically mentions ANSI/ASHRAE/IESNA Standard 90.1-2010 as a key standard for establishing the baseline for the Energy and Atmosphere Credit, Optimize Energy Performance.



Share your comments for US Green Building Council LEED-AP-ID-C exam with other users:

N
Nabeel
7/25/2023 4:11:00 PM

still learning

G
gure
7/26/2023 5:10:00 PM

excellent way to learn

C
ciken
8/24/2023 2:55:00 PM

help so much

B
Biswa
11/20/2023 9:28:00 AM

understand sql col.

S
Saint Pierre
10/24/2023 6:21:00 AM

i would give 5 stars to this website as i studied for az-800 exam from here. it has all the relevant material available for preparation. i got 890/1000 on the test.

R
Rose
7/24/2023 2:16:00 PM

this is nice.

A
anon
10/15/2023 12:21:00 PM

q55- the ridac workflow can be modified using flow designer, correct answer is d not a

N
NanoTek3
6/13/2022 10:44:00 PM

by far this is the most accurate exam dumps i have ever purchased. all questions are in the exam. i saw almost 90% of the questions word by word.

E
eriy
11/9/2023 5:12:00 AM

i cleared the az-104 exam by scoring 930/1000 on the exam. it was all possible due to this platform as it provides premium quality service. thank you!

M
Muhammad Rawish Siddiqui
12/8/2023 8:12:00 PM

question # 232: accessibility, privacy, and innovation are not data quality dimensions.

V
Venkat
12/27/2023 9:04:00 AM

looks wrong answer for 443 question, please check and update

V
Varun
10/29/2023 9:11:00 PM

great question

D
Doc
10/29/2023 9:36:00 PM

question: a user wants to start a recruiting posting job posting. what must occur before the posting process can begin? 3 ans: comment- option e is incorrect reason: as part of enablement steps, sap recommends that to be able to post jobs to a job board, a user need to have the correct permission and secondly, be associated with one posting profile at minimum

I
It‘s not A
9/17/2023 5:31:00 PM

answer to question 72 is d [sys_user_role]

I
indira m
8/14/2023 12:15:00 PM

please provide the pdf

R
ribrahim
8/1/2023 6:05:00 AM

hey guys, just to let you all know that i cleared my 312-38 today within 1 hr with 100 questions and passed. thank you so much brain-dumps.net all the questions that ive studied in this dump came out exactly the same word for word "verbatim". you rock brain-dumps.net!!! section name total score gained score network perimeter protection 16 11 incident response 10 8 enterprise virtual, cloud, and wireless network protection 12 8 application and data protection 13 10 network défense management 10 9 endpoint protection 15 12 incident d

A
Andrew
8/23/2023 6:02:00 PM

very helpful

L
latha
9/7/2023 8:14:00 AM

useful questions

I
ibrahim
11/9/2023 7:57:00 AM

page :20 https://exam-dumps.com/snowflake/free-cof-c02-braindumps.html?p=20#collapse_453 q 74: true or false: pipes can be suspended and resumed. true. desc.: pausing or resuming pipes in addition to the pipe owner, a role that has the following minimum permissions can pause or resume the pipe https://docs.snowflake.com/en/user-guide/data-load-snowpipe-intro

F
Franklin Allagoa
7/5/2023 5:16:00 AM

i want hcia exam dumps

S
SSA
12/24/2023 1:18:00 PM

good training

B
BK
8/11/2023 12:23:00 PM

very useful

D
Deepika Narayanan
7/13/2023 11:05:00 PM

yes need this exam dumps

B
Blessious Phiri
8/15/2023 3:31:00 PM

these questions are a great eye opener

J
Jagdesh
9/8/2023 8:17:00 AM

thank you for providing these questions and answers. they helped me pass my exam. you guys are great.

T
TS
7/18/2023 3:32:00 PM

good knowledge

A
Asad Khan
11/1/2023 2:44:00 AM

answer 10 should be a because only a new project will be created & the organization is the same.

R
Raj
9/12/2023 3:49:00 PM

can you please upload the dump again

C
Christian Klein
6/23/2023 1:32:00 PM

is it legit questions from sap certifications ?

A
anonymous
1/12/2024 3:34:00 PM

question 16 should be b (changing the connector settings on the monitor) pc and monitor were powered on. the lights on the pc are on indicating power. the monitor is showing an error text indicating that it is receiving power too. this is a clear sign of having the wrong input selected on the monitor. thus, the "connector setting" needs to be switched from hdmi to display port on the monitor so it receives the signal from the pc, or the other way around (display port to hdmi).

N
NSPK
1/18/2024 10:26:00 AM

q 10. ans is d (in the target org: open deployment settings, click edit next to the source org. select allow inbound changes and save

M
mohamed abdo
9/1/2023 4:59:00 AM

very useful

T
Tom
3/18/2022 8:00:00 PM

i purchased this exam dumps from another website with way more questions but they were all invalid and outdate. this exam dumps was right to the point and all from recent exam. it was a hard pass.

E
Edrick GOP
10/24/2023 6:00:00 AM

it was a good experience and i got 90% in the 200-901 exam.

AI Tutor 👋 I’m here to help!