A cost analyst team member asks the project manager for the latest risk data for inclusion with the cost estimates for the project.
Which tool should the cost analyst team member use to identify the probability of achieving specific cost targets?

  1. Monte Carlo analysis
  2. Decision tree analysis
  3. Analogous estimating
  4. Brainstorming

Answer(s): A



The project manager is implementing a computer interface to facilitate communications between two ticketing systems for two major companies in the IT industry. During the Plan Risk Response process, the project team agrees on the contingency plan that should mitigate the negative impact of the risk. However, during the project execution, one of the subject matter experts identifies a residual risk that was not taken into consideration during the risk response planning session, but could potentially affect the project schedule baseline.

What should the risk manager do to handle this residual risk?

  1. Increase the management reserve.
  2. Analyze this risk and update the risk register.
  3. Accept the risk, since it is minor.
  4. Reject the risk, since the risk plan will take care of all the risks.

Answer(s): B



The risk management process can be defined as which of the following?

  1. Iterative through the planning phase
  2. Baselined at the beginning of execution
  3. Iterative throughout the entire project
  4. Updated in the execution phase

Answer(s): C



A risk manager creates a survey for project stakeholders to obtain their opinions on high levels of risk. Key questions in the survey address acceptable levels of cost increases and schedule delays.

What is the risk manager trying to determine?

  1. Risk urgency
  2. Risk exposure
  3. Risk threshold
  4. Risk attitude

Answer(s): C



Which of the following will ultimately determine risk thresholds?

  1. The absolute value of the consequence
  2. The risk appetite of the key stakeholders
  3. The practice standard for risk management
  4. The project manager

Answer(s): B



Which of the following represents levels of risk attitude?

  1. Conservative, moderate, and liberal
  2. Risk-averse, risk-neutral, risk-tolerant, risk-seeking
  3. Risk-mitigating, risk-avoiding, risk-transferring, risk-accepting
  4. High, medium, and low

Answer(s): B



Which of the following should multicultural groups be aware of on a project relative to risk?

  1. Problematic risk management practices
  2. Multicultural beta risk management software
  3. Differences regarding risk attitudes and emotional literacy
  4. "Parent-child" risk relationships

Answer(s): C



Project stakeholders identify, analyze, and plan the risk responses for a project. However, the contingency reserves are depleted before the project is completed.

What recommendation could be implemented to prevent this from recurring?

  1. Use the Monte Carlo simulation.
  2. Implement a reserve analysis process.
  3. Conduct more frequent reserve watch list status meetings.
  4. Increase the contingency reserve.

Answer(s): B



Share your comments for PMI PMI-RMP exam with other users:

A
Anne
9/13/2023 2:33:00 AM

upload please. many thanks!

P
pepe el toro
9/12/2023 7:55:00 PM

this is so interesting

A
Antony
11/28/2023 12:13:00 AM

great material thanks

T
Thembelani
5/30/2023 2:22:00 AM

anyone who wrote this exam recently

P
P
9/16/2023 1:27:00 AM

ok they re good

J
Jorn
7/13/2023 5:05:00 AM

relevant questions

A
AM
6/20/2023 7:54:00 PM

please post

N
Nagendra Pedipina
7/13/2023 2:22:00 AM

q:42 there has to be a image in the question to choose what does it mean from the options

B
BrainDumpee
11/18/2023 1:36:00 PM

looking for cphq dumps, where can i find these for free? please and thank you.

S
sheik
10/14/2023 11:37:00 AM

@aarun , thanks for the information. it would be great help if you share your email

R
Random user
12/11/2023 1:34:00 AM

1z0-1078-23 need this dumps

L
labuschanka
11/16/2023 6:06:00 PM

i gave the microsoft azure az-500 tests and prepared from this site as it has latest mock tests available which helped me evaluate my performance and score 919/1000

M
Marianne
10/22/2023 11:57:00 PM

i cannot see the button to go to the questions

S
sushant
6/28/2023 4:52:00 AM

good questions

A
A\MAM
6/27/2023 5:17:00 PM

q-6 ans-b correct. https://docs.paloaltonetworks.com/pan-os/9-1/pan-os-cli-quick-start/use-the-cli/commit-configuration-changes

U
unanimous
12/15/2023 6:38:00 AM

very nice very nice

A
akminocha
9/28/2023 10:36:00 AM

please help us with 1z0-1107-2 dumps

J
Jefi
9/4/2023 8:15:00 AM

please upload the practice questions

T
Thembelani
5/30/2023 2:45:00 AM

need this dumps

A
Abduraimov
4/19/2023 12:43:00 AM

preparing for this exam is overwhelming. you cannot pass without the help of these exam dumps.

P
Puneeth
10/5/2023 2:06:00 AM

new to this site but i feel it is good

A
Ashok Kumar
1/2/2024 6:53:00 AM

the correct answer to q8 is b. explanation since the mule app has a dependency, it is necessary to include project modules and dependencies to make sure the app will run successfully on the runtime on any other machine. source code of the component that the mule app is dependent of does not need to be included in the exported jar file, because the source code is not being used while executing an app. compiled code is being used instead.

M
Merry
7/30/2023 6:57:00 AM

good questions

V
VoiceofMidnight
12/17/2023 4:07:00 PM

Delayed the exam until December 29th.

U
Umar Ali
8/29/2023 2:59:00 PM

A and D are True

V
vel
8/28/2023 9:17:09 AM

good one with explanation

G
Gurdeep
1/18/2024 4:00:15 PM

This is one of the most useful study guides I have ever used.