In a theory of constraints (TOC) analysis, the bottleneck operation (the constraint) corresponds to which part of the drum-buffer-rope model?
Answer(s): B
Production flow through a constraint is managed using the drum-buffer-rope (DBR) system. The drum (i.e., the beat to which a production process marches) is the bottleneck operation. The constraint sets the pace for the entire process. The buffer is a minimal amount of work-in-process input to the drum that is maintained to ensure that it is always in operation. The rope is the sequence of activities preceding and including the bottleneck operation that must be coordinated to avoid inventory buildup.
The process model used in a theory of constraints (TOC) analysis is called:
Production flow through a constraint is managed using the drum-buffer-rope (DBR) system. The drum (i.e.. the beat to which a production process marches) is the bottleneck operation. The constraint sets the pace for the entire process. The buffer is a minimal amount of work-in-process input to the drum that is maintained to ensure that it is always in operation. The rope is the sequence of activities preceding and including the bottleneck operation that must be coordinated to avoid inventory buildup.
The following steps make up the stages of a theory of constraints (TOC) analysis.I). Determine the most profitable product mix given the constraint.II). Increase capacity at the constraint.Ill). Identify the constraint.IV). Redesign the manufacturing process.V). Maximize the flow through the constraint.If executed in the correct order, the sequence is
Answer(s): D
The steps in a TOC analysis are (1) identify the constraint. (2) determine the most profitable product mix given the constraint, (3) maximize the flow through the constraint, (4) increase capacity at the constraint, and (5) redesign the manufacturing process for greater flexibility and speed.
A manufacturer can sell its single product for US $660. Below are the cost data for the product:Direct materials US$170Direct labor 225Manufacturing overhead 90The relevant margin amount when beginning a theory of constraints (TOC) analysis is:
Answer(s): A
A theory of constraints (TOC) analysis proceeds from the assumption that only direct materials costs are truly variable in the short run. This is called throughput, or super variable, costing. The relevant margin amount is throughput margin, which equals price minus direct materials. Thus, the relevant margin amount for this manufacturer is US $490 (US $660-US $170).
Below are data concerning the hours spent by a manufacturer's two products in its two processes.The constraint is:
Answer(s): C
In theory of constraints (TOC) analysis, the constraint (bottleneck) operation is the slowest part of the process. It can usually be identified as the one where work-in-process backs up the most of this manufacturer's two operations, the one that requires the most total time is assembly.
Share your comments for Financial CIA-III-2012 exam with other users:
thank you for the test materials!
its very helpful
good questions
good questons
i need the dumb of the hcip security v4.0 exam
upload the dump please
yes, iam looking this
please upload cima e2 managing performance dumps
wonderful questions
i used this site since 2000, still great to support my career
why is the answer to "which of the following is required by scrum?" all of the following stated below since most of them are not mandatory? sprint retrospective. members must be stand up at the daily scrum. sprint burndown chart. release planning.
great job. hope this helps out.
upload please. many thanks!
this is so interesting
great material thanks
anyone who wrote this exam recently
ok they re good
relevant questions
please post
q:42 there has to be a image in the question to choose what does it mean from the options
looking for cphq dumps, where can i find these for free? please and thank you.
@aarun , thanks for the information. it would be great help if you share your email
1z0-1078-23 need this dumps
i gave the microsoft azure az-500 tests and prepared from this site as it has latest mock tests available which helped me evaluate my performance and score 919/1000
i cannot see the button to go to the questions
q-6 ans-b correct. https://docs.paloaltonetworks.com/pan-os/9-1/pan-os-cli-quick-start/use-the-cli/commit-configuration-changes
very nice very nice
please help us with 1z0-1107-2 dumps
please upload the practice questions
need this dumps
preparing for this exam is overwhelming. you cannot pass without the help of these exam dumps.
new to this site but i feel it is good
the correct answer to q8 is b. explanation since the mule app has a dependency, it is necessary to include project modules and dependencies to make sure the app will run successfully on the runtime on any other machine. source code of the component that the mule app is dependent of does not need to be included in the exported jar file, because the source code is not being used while executing an app. compiled code is being used instead.