Dale has 20 days to complete production of an order for an important customer. The customer wants 96 units of product that may be painted either red or white. The red units can be produced at a rate of 4 per day. The white units, because of a different quality of paint, can be produced at a rate of 7 per day. The materials for the red units cost US $80 each, while the white units cost US $120 each. Dale wants to keep costs at a minimum.
What is the constraint that expresses the number of units to be produced?

  1. 4R + 7W = 20
  2. (R/4) + (W-7) 20
  3. R + W=20
  4. 4R + 7W=96

Answer(s): B

Explanation:

The constraint function that expresses the number of units to be produced is R + W = 96, but that is not one of the answer choices. Another constraint is that the total quantities of red (R) and white (W) units must be produced in 20 or fewer days at a rate of 4 red units per day and 7 white units per day. Thus, the time constraint is (R + 4) + (W + 7) 20.



The data below were gathered on two different machine centers and two products.



Which item below would be part of a linear programming formulation of this problem?

  1. Maximize: Contribution 4A + 5B.
  2. Subject to: A 0.
  3. Subject to: 2.5A+4B60.
  4. Subject to: 4A + 5B130.

Answer(s): C

Explanation:

The linear programming solution is subject to constraints on the availability of machine hours in both centers. For example, products A and B require 2.5 and 4 hours per unit, respectively, in Machine Center 1, but only 60 hours are available. Hence, the optimal production of A and B to the following constraint:
2.5A + 4B 60



A firm must decide the mix of production of Product X and Product Y. There are only two resources used in the two products, resources A and B. Data related to the two products is given in the following table:


What is the appropriate objective function to maximize profit?

  1. 3X + 7Y
  2. 2X + Y
  3. 8X + 6Y
  4. 5X + 8Y

Answer(s): C

Explanation:

The objective function is the function to be optimized. This firm wishes to maximize profits on the sales of two products (X and Y). Based on profits per unit (US $8 and US $6, respectively), the objective function is 8X + 6Y.



Under throughput costing, the only cost considered to be truly variable in the short run is:

  1. Direct materials.
  2. Direct labor.
  3. Manufacturing overhead.
  4. All manufacturing costs are considered variable.

Answer(s): D

Explanation:

Throughput costing, also called super variable costing, recognizes only direct materials costs as being truly variable and thus relevant to the calculation of throughput margin.



The immediate goal of a theory of constraints (TOC) analysis is to:

  1. Maximize the efficiency of the entire production process.
  2. Minimize direct materials cost.
  3. Maximize contribution margin through the constraint.
  4. Smooth production flow to eliminate backup in the system.

Answer(s): C

Explanation:

A basic principle of TOC analysis is that short-term profit maximization requires maximizing the contribution margin through the constraint, called the throughput margin or throughput contribution.



Share your comments for Financial CIA-III-2012 exam with other users:

B
Berihun
7/13/2023 7:29:00 AM

all questions are so important and covers all ccna modules

N
nspk
1/19/2024 12:53:00 AM

q 44. ans:- b (goto setup > order settings > select enable optional price books for orders) reference link --> https://resources.docs.salesforce.com/latest/latest/en-us/sfdc/pdf/sfom_impl_b2b_b2b2c.pdf(decide whether you want to enable the optional price books feature. if so, select enable optional price books for orders. you can use orders in salesforce while managing price books in an external platform. if you’re using d2c commerce, you must select enable optional price books for orders.)

M
Muhammad Rawish Siddiqui
12/2/2023 5:28:00 AM

"cost of replacing data if it were lost" is also correct.

A
Anonymous
7/14/2023 3:17:00 AM

pls upload the questions

M
Mukesh
7/10/2023 4:14:00 PM

good questions

E
Elie Abou Chrouch
12/11/2023 3:38:00 AM

question 182 - correct answer is d. ethernet frame length is 64 - 1518b. length of user data containing is that frame: 46 - 1500b.

D
Damien
9/23/2023 8:37:00 AM

i need this exam pls

N
Nani
9/10/2023 12:02:00 PM

its required for me, please make it enable to access. thanks

E
ethiopia
8/2/2023 2:18:00 AM

seems good..

W
whoAreWeReally
12/19/2023 8:29:00 PM

took the test last week, i did have about 15 - 20 word for word from this site on the test. (only was able to cram 600 of the questions from this site so maybe more were there i didnt review) had 4 labs, bgp, lacp, vrf with tunnels and actually had to skip a lab due to time. lots of automation syntax questions.

V
vs
9/2/2023 12:19:00 PM

no comments

J
john adenu
11/14/2023 11:02:00 AM

nice questions bring out the best in you.

O
Osman
11/21/2023 2:27:00 PM

really helpful

E
Edward
9/13/2023 5:27:00 PM

question #50 and question #81 are exactly the same questions, azure site recovery provides________for virtual machines. the first says that it is fault tolerance is the answer and second says disater recovery. from my research, it says it should be disaster recovery. can anybody explain to me why? thank you

M
Monti
5/24/2023 11:14:00 PM

iam thankful for these exam dumps questions, i would not have passed without this exam dumps.

A
Anon
10/25/2023 10:48:00 PM

some of the answers seem to be inaccurate. q10 for example shouldnt it be an m custom column?

P
PeterPan
10/18/2023 10:22:00 AM

are the question real or fake?

C
CW
7/11/2023 3:19:00 PM

thank you for providing such assistance.

M
Mn8300
11/9/2023 8:53:00 AM

nice questions

N
Nico
4/23/2023 11:41:00 PM

my 3rd purcahse from this site. these exam dumps are helpful. very helpful.

C
Chere
9/15/2023 4:21:00 AM

found it good

T
Thembelani
5/30/2023 2:47:00 AM

excellent material

V
vinesh phale
9/11/2023 2:51:00 AM

very helpfull

B
Bhagiii
11/4/2023 7:04:00 AM

well explained.

R
Rahul
8/8/2023 9:40:00 PM

i need the pdf, please.

C
CW
7/11/2023 2:51:00 PM

a good source for exam preparation

A
Anchal
10/23/2023 4:01:00 PM

nice questions

J
J Nunes
9/29/2023 8:19:00 AM

i need ielts general training audio guide questions

A
Ananya
9/14/2023 5:16:00 AM

please make this content available

S
Swathi
6/4/2023 2:18:00 PM

content is good

L
Leo
7/29/2023 8:45:00 AM

latest dumps please

L
Laolu
2/15/2023 11:04:00 PM

aside from pdf the test engine software is helpful. the interface is user-friendly and intuitive, making it easy to navigate and find the questions.

Z
Zaynik
9/17/2023 5:36:00 AM

questions and options are correct, but the answers are wrong sometimes. so please check twice or refer some other platform for the right answer

M
Massam
6/11/2022 5:55:00 PM

90% of questions was there but i failed the exam, i marked the answers as per the guide but looks like they are not accurate , if not i would have passed the exam given that i saw about 45 of 50 questions from dump

AI Tutor 👋 I’m here to help!