What is the intent of Indoor Environmental Quality Credit, Daylight and Quality Views?

  1. To achieve a daylight factor in all spaces
  2. To provide lighting controls for regularly occupied spaces
  3. To achieve direct line of site to vision glazing for all building occupants
  4. To provide a connection between building occupants and the outdoor environment

Answer(s): D

Explanation:

The intent of Indoor Environmental Quality Credit, Daylight and Quality Views is D: to provide a connection between building occupants and the outdoor environment1. This credit aims to enhance the well-being, productivity, and satisfaction of building occupants by introducing natural light and views into the regularly occupied spaces2. The other options are incorrect because they either describe different aspects of the credit requirements or are not part of the credit intent.
1: Daylight and Views - Daylight - Chaney Enterprises 2: LEED v4.1 O+M Reference Guide, page 249

The intent of the Indoor Environmental Quality Credit, Daylight and Quality Views, is to provide a connection between building occupants and the outdoor environment. This credit emphasizes the importance of natural light and outside views in creating healthy and productive indoor spaces. By ensuring that interior spaces have access to daylight and views of the outdoors, buildings can enhance occupant well-being, reduce the need for artificial lighting, and promote a connection to the natural world. This credit encourages the design and orientation of buildings and interior spaces in a way that maximizes the penetration of natural light and provides clear lines of sight to outdoor environments.



Which of the following strategies is allowed under Energy and Atmosphere Credit, Renewable Energy and Carbon
Offsets, and will help a project achieve Energy and Atmosphere Credit, Optimize Energy Performance?

  1. Install an on-site photovoltaic array
  2. Purchase Green-e certified carbon offsets
  3. Purchase Green-e certified Renewable Energy Certificates (RECs)
  4. Install an on-site geothermal energy with a ground-source heat pump

Answer(s): A

Explanation:

The correct answer is A because installing an on-site photovoltaic array is a strategy that is allowed under Energy and Atmosphere Credit, Renewable Energy and Carbon Offsets, and will help a project achieve Energy and Atmosphere Credit, Optimize Energy Performance, as stated in the LEED v4.1 O+M Reference Guide1. An on-site photovoltaic array can generate renewable energy for the project and reduce its greenhouse gas emissions and energy costs1. The other options are incorrect because they either do not help the project achieve Energy and Atmosphere Credit, Optimize Energy Performance, or are not allowed by the credit requirements.


Reference:

LEED v4.1 O+M Reference Guide, page 145
Guide to the LEED AP Operations and Maintenance (O+M) Exam, page 90 LEED v4 AP O+M Mock Exam, page 87



What requirement must be met when creating a demand response program that satisfies Energy and Atmosphere Credit, Demand Response?

  1. Demonstrate a load shift reduction of 5% in the building
  2. Permanently reduce the energy consumption in the building by 5%
  3. Have the building management sign a two-year demand response enrollment
  4. Create a comprehensive plan for meeting the contractual commitment during a demand response event

Answer(s): D

Explanation:

The correct answer is D because creating a comprehensive plan for meeting the contractual commitment during a demand response event is a requirement for Energy and Atmosphere Credit, Demand Response, as stated in the LEED v4.1 O+M Reference Guide1. The plan must include the roles and responsibilities of the building staff, the communication protocols, the load reduction strategies, and the measurement and verification methods1. The other options are incorrect because they are either not required or relevant for this credit.


Reference:

LEED v4.1 O+M Reference Guide, page 151
Guide to the LEED AP Operations and Maintenance (O+M) Exam, page 91 LEED v4 AP O+M Mock Exam, page 88



When developing a transportation survey, a LEED AP must make certain that the survey instrument collects information

  1. in a consistent manner from all respondents
  2. from the morning and evening commute only
  3. from non-consecutive days over a calendar month
  4. on every mode of transportation in a multi-mode daily commute

Answer(s): A

Explanation:

When developing a transportation survey, it is crucial that the survey instrument collects information in a consistent manner from all respondents. This ensures that the data collected is reliable and can be accurately analyzed to inform decisions about transportation strategies. Collecting data consistently allows for a fair comparison of responses and helps to identify trends or patterns in the data.


Reference:

LEED v4: Building Operations + Maintenance Guide1, LEED v4.1 OPERATIONS AND MAINTENANCE - WAP Sustainability Consulting



When sampling a population in a multi-tenant building, how can the transportation surveys be distributed to meet Location and Transportation Credit, Alternative Transportation, Option 1.
Transportation Survey?

  1. Distribute the total number of surveys across all tenants evenly
  2. Distribute the total number of surveys across all tenants proportionately, according to their populations
  3. Distribute the total number of surveys across all tenants proportionately, according to their gross floor area
  4. Distribute the total number of surveys across all tenants proportionately, according to their regularly occupied Area

Answer(s): B

Explanation:

The correct answer is B because the transportation surveys must be distributed across all tenants proportionately, according to their populations, as stated in the LEED v4.1 O+M Reference Guide1. This ensures that the survey results are representative of the actual transportation patterns of the building occupants and avoids sampling bias. The other options are incorrect because they either do not account for the population size of each tenant or are not relevant for the survey distribution.


Reference:

LEED v4.1 O+M Reference Guide, page 123
Guide to the LEED AP Operations and Maintenance (O+M) Exam, page 83 LEED v4 AP O+M Mock Exam, page 89



Share your comments for US Green Building Council LEED-AP-O-M exam with other users:

S
Sanjay
10/15/2023 1:34:00 PM

great site to practice for sitecore exam

J
jaya
12/17/2023 8:36:00 AM

good for students

B
Bsmaind
8/20/2023 9:23:00 AM

nice practice dumps

K
kumar
11/15/2023 11:24:00 AM

nokia 4a0-114 dumps

V
Vetri
10/3/2023 12:59:00 AM

great content and wonderful to have the answers with explanation

R
Ranjith
8/21/2023 3:39:00 PM

for question #118, the answer is option c. the screen shot is showing the drop down, but the answer is marked incorrectly please update . thanks for sharing such nice questions.

E
Eduardo Ramírez
12/11/2023 9:55:00 PM

the correct answer for the question 29 is d.

D
Dass
11/2/2023 7:43:00 AM

question no 22: correct answers: bc, 1 per session 1 per page 1 per component always

R
Reddy
12/14/2023 2:42:00 AM

these are pretty useful

D
Daisy Delgado
1/9/2023 1:05:00 PM

awesome

A
Atif
6/13/2023 4:09:00 AM

yes please upload

X
Xunil
6/12/2023 3:04:00 PM

great job whoever put this together, for the greater good! thanks!

L
Lakshmi
10/2/2023 5:26:00 AM

just started to view all questions for the exam

R
rani
1/19/2024 11:52:00 AM

helpful material

G
Greg
11/16/2023 6:59:00 AM

hope for the best

H
hi
10/5/2023 4:00:00 AM

will post exam has finished

V
Vmotu
8/24/2023 11:14:00 AM

really correct and good analyze!

H
hicham
5/30/2023 8:57:00 AM

excellent thanks a lot

S
Suman C
7/7/2023 8:13:00 AM

will post once pass the cka exam

R
Ram
11/3/2023 5:10:00 AM

good content

N
Nagendra Pedipina
7/13/2023 2:12:00 AM

q:32 answer has to be option c

T
Tamer Barakat
12/7/2023 5:17:00 PM

nice questions

D
Daryl
8/1/2022 11:33:00 PM

i really like the support team in this website. they are fast in communication and very helpful.

C
Curtis Nakawaki
6/29/2023 9:13:00 PM

a good contemporary exam review

X
x-men
5/23/2023 1:02:00 AM

q23, its an array, isnt it? starts with [ and end with ]. its an array of objects, not object.

A
abuti
7/21/2023 6:24:00 PM

cool very helpfull

K
Krishneel
3/17/2023 10:34:00 AM

i just passed. this exam dumps is the same one from prepaway and examcollection. it has all the real test questions.

R
Regor
12/4/2023 2:01:00 PM

is this a valid prince2 practitioner dumps?

A
asl
9/14/2023 3:59:00 PM

all are relatable questions

S
Siyya
1/19/2024 8:30:00 PM

might help me to prepare for the exam

T
Ted
6/21/2023 11:11:00 PM

just paid and downlaod the 2 exams using the 50% sale discount. so far i was able to download the pdf and the test engine. all looks good.

P
Paul K
11/27/2023 2:28:00 AM

i think it should be a,c. option d goes against the principle of building anything custom unless there are no work arounds available

P
ph
6/16/2023 12:41:00 AM

very legible

S
sephs2001
7/31/2023 10:42:00 PM

is this exam accurate or helpful?

AI Tutor 👋 I’m here to help!