What is the intent of Indoor Environmental Quality Credit, Daylight and Quality Views?

  1. To achieve a daylight factor in all spaces
  2. To provide lighting controls for regularly occupied spaces
  3. To achieve direct line of site to vision glazing for all building occupants
  4. To provide a connection between building occupants and the outdoor environment

Answer(s): D

Explanation:

The intent of Indoor Environmental Quality Credit, Daylight and Quality Views is D: to provide a connection between building occupants and the outdoor environment1. This credit aims to enhance the well-being, productivity, and satisfaction of building occupants by introducing natural light and views into the regularly occupied spaces2. The other options are incorrect because they either describe different aspects of the credit requirements or are not part of the credit intent.
1: Daylight and Views - Daylight - Chaney Enterprises 2: LEED v4.1 O+M Reference Guide, page 249

The intent of the Indoor Environmental Quality Credit, Daylight and Quality Views, is to provide a connection between building occupants and the outdoor environment. This credit emphasizes the importance of natural light and outside views in creating healthy and productive indoor spaces. By ensuring that interior spaces have access to daylight and views of the outdoors, buildings can enhance occupant well-being, reduce the need for artificial lighting, and promote a connection to the natural world. This credit encourages the design and orientation of buildings and interior spaces in a way that maximizes the penetration of natural light and provides clear lines of sight to outdoor environments.



Which of the following strategies is allowed under Energy and Atmosphere Credit, Renewable Energy and Carbon
Offsets, and will help a project achieve Energy and Atmosphere Credit, Optimize Energy Performance?

  1. Install an on-site photovoltaic array
  2. Purchase Green-e certified carbon offsets
  3. Purchase Green-e certified Renewable Energy Certificates (RECs)
  4. Install an on-site geothermal energy with a ground-source heat pump

Answer(s): A

Explanation:

The correct answer is A because installing an on-site photovoltaic array is a strategy that is allowed under Energy and Atmosphere Credit, Renewable Energy and Carbon Offsets, and will help a project achieve Energy and Atmosphere Credit, Optimize Energy Performance, as stated in the LEED v4.1 O+M Reference Guide1. An on-site photovoltaic array can generate renewable energy for the project and reduce its greenhouse gas emissions and energy costs1. The other options are incorrect because they either do not help the project achieve Energy and Atmosphere Credit, Optimize Energy Performance, or are not allowed by the credit requirements.


Reference:

LEED v4.1 O+M Reference Guide, page 145
Guide to the LEED AP Operations and Maintenance (O+M) Exam, page 90 LEED v4 AP O+M Mock Exam, page 87



What requirement must be met when creating a demand response program that satisfies Energy and Atmosphere Credit, Demand Response?

  1. Demonstrate a load shift reduction of 5% in the building
  2. Permanently reduce the energy consumption in the building by 5%
  3. Have the building management sign a two-year demand response enrollment
  4. Create a comprehensive plan for meeting the contractual commitment during a demand response event

Answer(s): D

Explanation:

The correct answer is D because creating a comprehensive plan for meeting the contractual commitment during a demand response event is a requirement for Energy and Atmosphere Credit, Demand Response, as stated in the LEED v4.1 O+M Reference Guide1. The plan must include the roles and responsibilities of the building staff, the communication protocols, the load reduction strategies, and the measurement and verification methods1. The other options are incorrect because they are either not required or relevant for this credit.


Reference:

LEED v4.1 O+M Reference Guide, page 151
Guide to the LEED AP Operations and Maintenance (O+M) Exam, page 91 LEED v4 AP O+M Mock Exam, page 88



When developing a transportation survey, a LEED AP must make certain that the survey instrument collects information

  1. in a consistent manner from all respondents
  2. from the morning and evening commute only
  3. from non-consecutive days over a calendar month
  4. on every mode of transportation in a multi-mode daily commute

Answer(s): A

Explanation:

When developing a transportation survey, it is crucial that the survey instrument collects information in a consistent manner from all respondents. This ensures that the data collected is reliable and can be accurately analyzed to inform decisions about transportation strategies. Collecting data consistently allows for a fair comparison of responses and helps to identify trends or patterns in the data.


Reference:

LEED v4: Building Operations + Maintenance Guide1, LEED v4.1 OPERATIONS AND MAINTENANCE - WAP Sustainability Consulting



When sampling a population in a multi-tenant building, how can the transportation surveys be distributed to meet Location and Transportation Credit, Alternative Transportation, Option 1.
Transportation Survey?

  1. Distribute the total number of surveys across all tenants evenly
  2. Distribute the total number of surveys across all tenants proportionately, according to their populations
  3. Distribute the total number of surveys across all tenants proportionately, according to their gross floor area
  4. Distribute the total number of surveys across all tenants proportionately, according to their regularly occupied Area

Answer(s): B

Explanation:

The correct answer is B because the transportation surveys must be distributed across all tenants proportionately, according to their populations, as stated in the LEED v4.1 O+M Reference Guide1. This ensures that the survey results are representative of the actual transportation patterns of the building occupants and avoids sampling bias. The other options are incorrect because they either do not account for the population size of each tenant or are not relevant for the survey distribution.


Reference:

LEED v4.1 O+M Reference Guide, page 123
Guide to the LEED AP Operations and Maintenance (O+M) Exam, page 83 LEED v4 AP O+M Mock Exam, page 89



Viewing Page 6 of 35



Share your comments for US Green Building Council LEED-AP-O-M exam with other users:

Doc 10/29/2023 9:36:00 PM

question: a user wants to start a recruiting posting job posting. what must occur before the posting process can begin? 3 ans: comment- option e is incorrect reason: as part of enablement steps, sap recommends that to be able to post jobs to a job board, a user need to have the correct permission and secondly, be associated with one posting profile at minimum
UNITED KINGDOM


It‘s not A 9/17/2023 5:31:00 PM

answer to question 72 is d [sys_user_role]
Anonymous


indira m 8/14/2023 12:15:00 PM

please provide the pdf
UNITED STATES


ribrahim 8/1/2023 6:05:00 AM

hey guys, just to let you all know that i cleared my 312-38 today within 1 hr with 100 questions and passed. thank you so much brain-dumps.net all the questions that ive studied in this dump came out exactly the same word for word "verbatim". you rock brain-dumps.net!!! section name total score gained score network perimeter protection 16 11 incident response 10 8 enterprise virtual, cloud, and wireless network protection 12 8 application and data protection 13 10 network défense management 10 9 endpoint protection 15 12 incident d
SINGAPORE


Andrew 8/23/2023 6:02:00 PM

very helpful
Anonymous


latha 9/7/2023 8:14:00 AM

useful questions
GERMANY


ibrahim 11/9/2023 7:57:00 AM

page :20 https://exam-dumps.com/snowflake/free-cof-c02-braindumps.html?p=20#collapse_453 q 74: true or false: pipes can be suspended and resumed. true. desc.: pausing or resuming pipes in addition to the pipe owner, a role that has the following minimum permissions can pause or resume the pipe https://docs.snowflake.com/en/user-guide/data-load-snowpipe-intro
FINLAND


Franklin Allagoa 7/5/2023 5:16:00 AM

i want hcia exam dumps
Anonymous


SSA 12/24/2023 1:18:00 PM

good training
Anonymous


BK 8/11/2023 12:23:00 PM

very useful
INDIA


Deepika Narayanan 7/13/2023 11:05:00 PM

yes need this exam dumps
Anonymous


Blessious Phiri 8/15/2023 3:31:00 PM

these questions are a great eye opener
Anonymous


Jagdesh 9/8/2023 8:17:00 AM

thank you for providing these questions and answers. they helped me pass my exam. you guys are great.
CANADA


TS 7/18/2023 3:32:00 PM

good knowledge
Anonymous


Asad Khan 11/1/2023 2:44:00 AM

answer 10 should be a because only a new project will be created & the organization is the same.
Anonymous


Raj 9/12/2023 3:49:00 PM

can you please upload the dump again
UNITED STATES


Christian Klein 6/23/2023 1:32:00 PM

is it legit questions from sap certifications ?
UNITED STATES


anonymous 1/12/2024 3:34:00 PM

question 16 should be b (changing the connector settings on the monitor) pc and monitor were powered on. the lights on the pc are on indicating power. the monitor is showing an error text indicating that it is receiving power too. this is a clear sign of having the wrong input selected on the monitor. thus, the "connector setting" needs to be switched from hdmi to display port on the monitor so it receives the signal from the pc, or the other way around (display port to hdmi).
UNITED STATES


NSPK 1/18/2024 10:26:00 AM

q 10. ans is d (in the target org: open deployment settings, click edit next to the source org. select allow inbound changes and save
Anonymous


mohamed abdo 9/1/2023 4:59:00 AM

very useful
Anonymous


Tom 3/18/2022 8:00:00 PM

i purchased this exam dumps from another website with way more questions but they were all invalid and outdate. this exam dumps was right to the point and all from recent exam. it was a hard pass.
UNITED KINGDOM


Edrick GOP 10/24/2023 6:00:00 AM

it was a good experience and i got 90% in the 200-901 exam.
Anonymous


anonymous 8/10/2023 2:28:00 AM

hi please upload this
Anonymous


Bakir 7/6/2023 7:24:00 AM

please upload it
UNITED KINGDOM


Aman 6/18/2023 1:27:00 PM

really need this dump. can you please help.
UNITED KINGDOM


Neela Para 1/8/2024 6:39:00 PM

really good and covers many areas explaining the answer.
NEW ZEALAND


Karan Patel 8/15/2023 12:51:00 AM

yes, can you please upload the exam?
UNITED STATES


NISHAD 11/7/2023 11:28:00 AM

how many questions are there in these dumps?
UNITED STATES


Pankaj 7/3/2023 3:57:00 AM

hi team, please upload this , i need it.
UNITED STATES


DN 9/4/2023 11:19:00 PM

question 14 - run terraform import: this is the recommended best practice for bringing manually created or destroyed resources under terraform management. you use terraform import to associate an existing resource with a terraform resource configuration. this ensures that terraform is aware of the resource, and you can subsequently manage it with terraform.
Anonymous


Zhiguang 8/19/2023 11:37:00 PM

please upload dump. thanks in advance.
Anonymous


deedee 12/23/2023 5:51:00 PM

great great
UNITED STATES


Asad Khan 11/1/2023 3:10:00 AM

answer 16 should be b your organizational policies require you to use virtual machines directly
Anonymous


Sale Danasabe 10/24/2023 5:21:00 PM

the question are kind of tricky of you didnt get the hnag on it.
Anonymous