The project team is attempting to achieve Option 1. Lighting Controls in Indoor Environmental Quality Credit, Interior Lighting.
Which of the following is required documentation?

  1. Table of lighting controls installed
  2. Manufacturers' data for occupancy sensors
  3. The total area of the building square footage
  4. A photometric chart of the multi-occupant space

Answer(s): A

Explanation:

The correct answer is A because a table of lighting controls installed is the required documentation for Option 1. Lighting Controls in Indoor Environmental Quality Credit, Interior Lighting, as stated in the LEED v4.1 O+M Reference Guide1. The table must include the type and location of each lighting control device, the controlled lighting power, and the percentage of lighting power controlled by each device1. The other options are incorrect because they are either not required or relevant for this option.


Reference:

LEED v4.1 O+M Reference Guide, page 251
Guide to the LEED AP Operations and Maintenance (O+M) Exam, page 115 LEED v4 AP O+M Mock Exam, page 84



A project is ineligible for an ENERGY STAR® Rating and will document Energy and Atmosphere Prerequisite,
Minimum Energy Performance by benchmarking against historical dat

  1. If the performance period calendar year is
    2022, which of the following is an acceptable historical baseline?
  2. Average of calendar years 2020 and 2021
  3. Average of calendar years 2015, 2016 and 2017
  4. Average of calendar years 2017, 2019 and 2021
  5. Average of calendar years 2017, 2018 and 2019

Answer(s): D

Explanation:

The correct answer is D because the historical baseline must be the average of the most recent three consecutive years of energy data available prior to the performance period1. Since the performance period calendar year is 2022, the most recent three consecutive years of energy data available are 2017, 2018 and 2019. The other options are incorrect because they either include years that are not consecutive or not prior to the performance period.


Reference:

LEED v4.1 O+M Reference Guide, page 139
Guide to the LEED AP Operations and Maintenance (O+M) Exam, page 89 LEED v4 AP O+M Mock Exam, page 85
When a project is ineligible for an ENERGY STAR® Rating and opts to document Energy and Atmosphere Prerequisite, Minimum Energy Performance by benchmarking against historical data, the selected baseline must be representative of the building's typical performance. The average of calendar years 2017, 2018, and 2019 serves as a relevant baseline because it provides recent, consecutive annual data that reflects the building's energy performance before any significant changes or improvements made for LEED certification. This approach ensures that the performance period (in this case, the calendar year 2022) is compared against a stable and accurate representation of the building's typical energy use, allowing for a meaningful assessment of energy performance improvements.


LEED v4 for Building Operations and Maintenance Guide, U.S. Green Building Council.



In following the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) Indoor Air Quality (IAQ) Guidelines for Occupied Buildings under Construction, what is the Minimum Efficiency Reporting Value (MERV)
as determined by ASHRAE 52.2-2007 required for renovation activities?

  1. 7
  2. 8
  3. 12
  4. 13

Answer(s): D

Explanation:

According to the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) Indoor Air Quality (IAQ) Guidelines for Occupied Buildings under Construction, the Minimum Efficiency Reporting Value (MERV) as determined by ASHRAE 52.2-2007 required for renovation activities is MERV 13. This requirement is in place to ensure that the air filtration systems used during renovation activities are capable of capturing fine particles, thus reducing the risk of indoor air quality issues. MERV 13 filters are efficient at capturing particles that are 0.3 to 1.0 micrometers in size, including dust, pollen, mold spores, bacteria, and any other airborne contaminants that might be present during construction activities.


Reference:

SMACNA IAQ Guidelines for Occupied Buildings Under Construction, 2nd Edition 2007; ASHRAE Standard 52.2-2007, "Method of Testing General Ventilation Air-Cleaning Devices for Removal Efficiency by Particle Size."



The project team of an existing urban site has 4% total vegetated area and desires to increase the percentage to equal or be greater than 5%.
Which strategy can the team implement to achieve this goal?

  1. Install a vegetated roof system
  2. Convert lawn areas to native plants
  3. Mitigate the vegetated area off-site through a land trust
  4. Convert the paved areas of the site to pervious pavement

Answer(s): A

Explanation:

To increase the vegetated area of an existing urban site from 4% to equal or be greater than 5%, one effective strategy is to install a vegetated roof system. This approach not only increases the site's vegetated footprint but also provides additional benefits such as improved stormwater management, increased insulation, and reduction of the urban heat island effect. A vegetated roof system can be implemented on flat or slightly sloped roofs, making it a versatile option for urban environments where ground space may be limited. By converting unused roof space into green space, the project team can meet the goal of increasing the total vegetated area of the site.


Reference:

LEED Reference Guide for Green Building Design and Construction, U.S. Green Building Council.



Which of the following topics is unnecessary in order to comply with the Sustainable Sites Credit, Site Improvement
Plan?

  1. Soils
  2. Hydrology
  3. Vegetation
  4. Maintenance equipment

Answer(s): D

Explanation:

The correct answer is D because maintenance equipment is not a topic that is required to be addressed in the Site Improvement Plan for the Sustainable Sites Credit, as stated in the LEED v4.1 O+M Reference Guide1. The Site Improvement Plan must include topics such as soils, hydrology, vegetation, and site management, and describe the existing conditions, goals, strategies, and performance metrics for each topic1. The other options are incorrect because they are topics that are required to be addressed in the Site Improvement Plan.


Reference:

LEED v4.1 O+M Reference Guide, page 115
Guide to the LEED AP Operations and Maintenance (O+M) Exam, page 80 LEED v4 AP O+M Mock Exam, page 86

In order to comply with the Sustainable Sites Credit, Site Improvement Plan, addressing the topics of soils, hydrology, and vegetation is essential. These elements are crucial for ensuring sustainable site management, enhancing site ecology, managing stormwater, and promoting biodiversity. However,

the topic of maintenance equipment, while important for operational considerations, is not directly necessary for compliance with this specific credit. The focus of the Site Improvement Plan is on the physical and ecological aspects of the site rather than the equipment used for site maintenance.

LEED v4 for Building Design and Construction Guide, U.S. Green Building Council.



Viewing Page 5 of 35



Share your comments for US Green Building Council LEED-AP-O-M exam with other users:

Paul 6/23/2023 7:12:00 AM

please can you share 1z0-1055-22 dump pls
UNITED STATES


exampei 10/7/2023 8:14:00 AM

i will wait impatiently. thank youu
Anonymous


Prince 10/31/2023 9:09:00 PM

is it possible to clear the exam if we focus on only these 156 questions instead of 623 questions? kindly help!
Anonymous


Ali Azam 12/7/2023 1:51:00 AM

really helped with preparation of my scrum exam
Anonymous


Jerman 9/29/2023 8:46:00 AM

very informative and through explanations
Anonymous


Jimmy 11/4/2023 12:11:00 PM

prep for exam
INDONESIA


Abhi 9/19/2023 1:22:00 PM

thanks for helping us
Anonymous


mrtom33 11/20/2023 4:51:00 AM

i prepared for the eccouncil 350-401 exam. i scored 92% on the test.
Anonymous


JUAN 6/28/2023 2:12:00 AM

aba questions to practice
UNITED STATES


LK 1/2/2024 11:56:00 AM

great content
Anonymous


Srijeeta 10/8/2023 6:24:00 AM

how do i get the remaining questions?
INDIA


Jovanne 7/26/2022 11:42:00 PM

well formatted pdf and the test engine software is free. well worth the money i sept.
ITALY


CHINIMILLI SATISH 8/29/2023 6:22:00 AM

looking for 1z0-116
Anonymous


Pedro Afonso 1/15/2024 8:01:00 AM

in question 22, shouldnt be in the data (option a) layer?
Anonymous


Pushkar 11/7/2022 12:12:00 AM

the questions are incredibly close to real exam. you people are amazing.
INDIA


Ankit S 11/13/2023 3:58:00 AM

q15. answer is b. simple
UNITED STATES


S. R 12/8/2023 9:41:00 AM

great practice
FRANCE


Mungara 3/14/2023 12:10:00 AM

thanks to this exam dumps, i felt confident and passed my exam with ease.
UNITED STATES


Anonymous 7/25/2023 2:55:00 AM

need 1z0-1105-22 exam
Anonymous


Nigora 5/31/2022 10:05:00 PM

this is a beautiful tool. passed after a week of studying.
UNITED STATES


Av dey 8/16/2023 2:35:00 PM

can you please upload the dumps for 1z0-1096-23 for oracle
INDIA


Mayur Shermale 11/23/2023 12:22:00 AM

its intresting, i would like to learn more abouth this
JAPAN


JM 12/19/2023 2:23:00 PM

q252: dns poisoning is the correct answer, not locator redirection. beaconing is detected from a host. this indicates that the system has been infected with malware, which could be the source of local dns poisoning. location redirection works by either embedding the redirection in the original websites code or having a user click on a url that has an embedded redirect. since users at a different office are not getting redirected, it isnt an embedded redirection on the original website and since the user is manually typing in the url and not clicking a link, it isnt a modified link.
UNITED STATES


Freddie 12/12/2023 12:37:00 PM

helpful dump questions
SOUTH AFRICA


Da Costa 8/25/2023 7:30:00 AM

question 423 eigrp uses metric
Anonymous


Bsmaind 8/20/2023 9:22:00 AM

hello nice dumps
Anonymous


beau 1/12/2024 4:53:00 PM

good resource for learning
UNITED STATES


Sandeep 12/29/2023 4:07:00 AM

very useful
Anonymous


kevin 9/29/2023 8:04:00 AM

physical tempering techniques
Anonymous


Blessious Phiri 8/15/2023 4:08:00 PM

its giving best technical knowledge
Anonymous


Testbear 6/13/2023 11:15:00 AM

please upload
ITALY


shime 10/24/2023 4:23:00 AM

great question with explanation thanks!!
ETHIOPIA


Thembelani 5/30/2023 2:40:00 AM

does this exam have lab sections?
Anonymous


Shin 9/8/2023 5:31:00 AM

please upload
PHILIPPINES