Which of the following is/are true ?
Answer(s): A
Type I error is the event in which we reject the null when it is true. This is the same as accepting the alternative when it is false. Type II error is the event in which we fail to reject the null when it is false. This is the same as rejecting the alternative when it is true.
If you owe a debt of $1,000 today and also owe $2,000 in 24 months, what single payment could you make 15 months from today that would pay off both of these debts, if interest is assessed at 8% per year, compounded monthly?
To solve this question, set the problem up as the sum of two compound interest calculations. Move the $1,000 from today over to month 15 and add it to the $2,000 brought back from month 24 to month 15. On the BAII Plus, press 15 N, 8 divide 12 = I/Y, 1000 PV, 0 PMT, CPT FV which yields $1,104.80. Then press STO 1. Then press 9 N, 2000 FV, CPT PV, which yields $1,883.91. Finally press + RCL 1 = to see the answer. On the HP12C, press 15 n, 8 ENTER 12 divide i, 1000 PV, 0 PMT, FV. Then press STO 1. Then press 9 n, 2000 FV, PV. Finally press RCL 1 + to see the answer. Make sure the BAII Plus has the value of P/Y set to 1.
You recently purchased a twin-engine plane after landing an ultra-lucrative job on Wall Street. The annual payments on the plane are $8,000 per year and the installment plan extends over 5 years. The payments start today. If your discount rate is 8.5% per year, how much would it have cost you to purchase the plane on an all- cash basis?
The present value of the installment payments equals 8,000 + (8,000/0.085)*(1-1/(1.085^4)) = $34,205
A normal distribution has a mean of 39 and a variance of 625. The area under the distribution between 50 and 75 equals ________.
Answer(s): D
First note that the area between two numbers under a probability distribution is the same as the probability of getting a number between those two numbers. The standard deviation of the distribution equals sqrt(625) = 25.The z-value of 50 equals (50-39)/25 = 0.44. The z-value of 75 equals (75-39)/25 = 1.44. Using the Normal probability tables, we get P(z < 0.44) = 0.67 and P(z < 1.44) = 0.9251. The area between 50 and 75 is then given by P(0.44 < z < 1.44) = P(z < 1.44) - P(z < 0.44) = 0.9251 - 0.67 = 0.255.
How much would an original deposit of $900 grow to be after 10 and a half years, if the deposit earns interest at 6.5% per year, compounded quarterly?
On the BAII Plus, press 42 N, 6.5 divide 4 = I/Y, 900 PV, 0 PMT, then press CPT FV. On the HP12C, press 42 n, 6.5 ENTER 4 divide i, 900 PV, 0 PMT, then press FV. Note that N = 42 quarters (10.5 x 4 =) and the answer is displayed as a negative number. Make sure that the BAII Plus has the P/Y value set to 1.
Share your comments for Test Prep CFA® LEVEL 1 exam with other users:
1z0-1078-23 need this dumps
i gave the microsoft azure az-500 tests and prepared from this site as it has latest mock tests available which helped me evaluate my performance and score 919/1000
i cannot see the button to go to the questions
good questions
q-6 ans-b correct. https://docs.paloaltonetworks.com/pan-os/9-1/pan-os-cli-quick-start/use-the-cli/commit-configuration-changes
very nice very nice
please help us with 1z0-1107-2 dumps
please upload the practice questions
need this dumps
preparing for this exam is overwhelming. you cannot pass without the help of these exam dumps.
new to this site but i feel it is good
the correct answer to q8 is b. explanation since the mule app has a dependency, it is necessary to include project modules and dependencies to make sure the app will run successfully on the runtime on any other machine. source code of the component that the mule app is dependent of does not need to be included in the exported jar file, because the source code is not being used while executing an app. compiled code is being used instead.
Delayed the exam until December 29th.
A and D are True
good one with explanation
This is one of the most useful study guides I have ever used.