Scaled Agile SAFe Advanced Scrum Master SAFe-SASM Dumps in PDF

Free Scaled Agile SAFe-SASM Real Questions (page: 7)

Which two Framework elements would a Scrum Master have the strongest connection and most frequent interaction? (Choose two.)

  1. Business Owners
  2. Release Train Engineer
  3. Systems Team
  4. Product Owner
  5. Epic Owner

Answer(s): B,D

Explanation:

Release Train Engineer (RTE):
Role: The RTE is a servant leader and coach for the Agile Release Train (ART). They facilitate ART events and processes, assist teams in delivering value, and help manage risks and dependencies.
Interaction with Scrum Master:
Scrum Masters frequently collaborate with the RTE to coordinate cross-team activities and dependencies.
They work together during events like PI Planning, Scrum of Scrums, and Inspect & Adapt (I&A) workshops to ensure alignment and continuous improvement. The RTE provides support and guidance to Scrum Masters, helping them resolve impediments that affect the ART.
Product Owner (PO):
Role: The Product Owner is responsible for defining and prioritizing the team backlog, ensuring that the team is working on the most valuable tasks.
Interaction with Scrum Master:
Scrum Masters work closely with Product Owners to facilitate effective backlog refinement sessions, ensuring that the backlog items are well-understood and ready for iteration planning. They support the Product Owner in maintaining a clear and prioritized backlog, helping to communicate the vision and goals to the team.
During iteration planning and reviews, Scrum Masters assist Product Owners in engaging with the team and stakeholders, ensuring that feedback is collected and incorporated.
SAFe Scrum Master


Reference:

Release Train Engineer:
SAFe materials outline the critical role of the RTE in coordinating the ART and supporting Scrum Masters in their efforts to remove impediments and ensure smooth execution of plans. Scrum Open: Discusses the collaborative relationship between Scrum Masters and RTEs in facilitating ART events and managing dependencies.
Product Owner:
The SAFe framework emphasizes the importance of the Scrum Master-Product Owner partnership in driving the delivery of value and maintaining a healthy backlog. Product Owner Open: Provides insights into how Scrum Masters and Product Owners work together to align on priorities and ensure the team is focused on the right tasks.



What is the primary goal of decentralized decision-making?

  1. To resolve dependencies
  2. To minimize VVIP www
  3. To empower knowledge workers
  4. To reduce delay

Answer(s): D

Explanation:

Decentralized decision-making is a principle in SAFe aimed at distributing decision authority to the people closest to the information and most affected by the decisions. The primary goal of decentralized decision-making is to reduce delay in the decision-making process, which can often occur when decisions need to pass through multiple layers of hierarchy. By empowering individuals and teams to make decisions quickly, organizations can respond faster to changes, improve agility, and maintain a steady flow of work.



What goes into the Portfolio Backlog?

  1. Strategic Themes
  2. Projects
  3. Capabilities
  4. Epics

Answer(s): D

Explanation:

The Portfolio Backlog in SAFe contains the larger initiatives, known as Epics. Epics are substantial pieces of work that require analysis, investment, and development effort over multiple Program Increments (PIs). They represent significant business or technical needs that drive the long-term strategy of the organization. These Epics are prioritized and managed in the Portfolio Backlog, where they can be decomposed into smaller, actionable items as they progress through the development process.



Why is the program predictability measure the primary Metric used during the quantitative measurement part of the Inspect and Adapt event?

  1. To measure the predictability of business value delivered in the PI timebox
  2. To predict the scope of the remaining requirements in the Program Backlog
  3. To forecast when remaining features could be delivered to customers
  4. To match customer demand to the Agile Release Train's velocity

Answer(s): A

Explanation:

The program predictability measure is the primary metric used during the quantitative measurement part of the Inspect and Adapt (I&A) event in SAFe. This measure assesses how reliably the Agile Release Train (ART) can deliver business value within the Program Increment (PI) timebox. It helps to:
Evaluate the team's ability to meet their commitments.
Identify areas where predictability can be improved.

Ensure that the business value planned for the PI is actually delivered. By focusing on the predictability of business value, organizations can better align their planning and execution efforts, ultimately enhancing customer satisfaction and achieving strategic goals more effectively.
SAFe Scrum Master Reference
SAFe Inspect and Adapt events
SAFe 5.0 framework: using program predictability as a key metric to assess and improve ART performance.



If the distance between the arrival and departure curves on a team's cumulative flow diagram is growing apart, what is likely happening?

  1. Lead time is increasing
  2. Unplanned work is pushed into the backlog
  3. WIP is decreasing
  4. The backlog is being reprioritized

Answer(s): A

Explanation:

Cumulative Flow Diagram (CFD): A CFD is a visual tool used in Kanban and Scrum to show the progress of work items through different stages of the workflow over time. Arrival and Departure Curves: These curves represent the work items entering (arrival) and leaving (departure) the system.
Growing Distance: If the distance between the arrival and departure curves on the CFD is growing apart, it indicates that work items are taking longer to move through the system. Lead Time: This term refers to the total time from when a work item is created until it is completed. An increasing distance between the curves means that work items are spending more time in the system, thus increasing the lead time.
SAFe Scrum Master


Reference:

SAFe materials on flow metrics and Kanban principles highlight the importance of monitoring lead time and using CFDs to identify bottlenecks and inefficiencies in the workflow.



Share your comments for Scaled Agile SAFe-SASM exam with other users:

A
Anjum
9/23/2023 6:22:00 PM

well explained

T
Thakor
6/7/2023 11:52:00 PM

i got the full version and it helped me pass the exam. pdf version is very good.

S
sartaj
7/18/2023 11:36:00 AM

provide the download link, please

L
loso
7/25/2023 5:18:00 AM

please upload thank.

P
Paul
6/23/2023 7:12:00 AM

please can you share 1z0-1055-22 dump pls

E
exampei
10/7/2023 8:14:00 AM

i will wait impatiently. thank youu

P
Prince
10/31/2023 9:09:00 PM

is it possible to clear the exam if we focus on only these 156 questions instead of 623 questions? kindly help!

A
Ali Azam
12/7/2023 1:51:00 AM

really helped with preparation of my scrum exam

J
Jerman
9/29/2023 8:46:00 AM

very informative and through explanations

J
Jimmy
11/4/2023 12:11:00 PM

prep for exam

A
Abhi
9/19/2023 1:22:00 PM

thanks for helping us

M
mrtom33
11/20/2023 4:51:00 AM

i prepared for the eccouncil 350-401 exam. i scored 92% on the test.

J
JUAN
6/28/2023 2:12:00 AM

aba questions to practice

L
LK
1/2/2024 11:56:00 AM

great content

S
Srijeeta
10/8/2023 6:24:00 AM

how do i get the remaining questions?

J
Jovanne
7/26/2022 11:42:00 PM

well formatted pdf and the test engine software is free. well worth the money i sept.

C
CHINIMILLI SATISH
8/29/2023 6:22:00 AM

looking for 1z0-116

P
Pedro Afonso
1/15/2024 8:01:00 AM

in question 22, shouldnt be in the data (option a) layer?

P
Pushkar
11/7/2022 12:12:00 AM

the questions are incredibly close to real exam. you people are amazing.

A
Ankit S
11/13/2023 3:58:00 AM

q15. answer is b. simple

S
S. R
12/8/2023 9:41:00 AM

great practice

M
Mungara
3/14/2023 12:10:00 AM

thanks to this exam dumps, i felt confident and passed my exam with ease.

A
Anonymous
7/25/2023 2:55:00 AM

need 1z0-1105-22 exam

N
Nigora
5/31/2022 10:05:00 PM

this is a beautiful tool. passed after a week of studying.

A
Av dey
8/16/2023 2:35:00 PM

can you please upload the dumps for 1z0-1096-23 for oracle

M
Mayur Shermale
11/23/2023 12:22:00 AM

its intresting, i would like to learn more abouth this

J
JM
12/19/2023 2:23:00 PM

q252: dns poisoning is the correct answer, not locator redirection. beaconing is detected from a host. this indicates that the system has been infected with malware, which could be the source of local dns poisoning. location redirection works by either embedding the redirection in the original websites code or having a user click on a url that has an embedded redirect. since users at a different office are not getting redirected, it isnt an embedded redirection on the original website and since the user is manually typing in the url and not clicking a link, it isnt a modified link.

F
Freddie
12/12/2023 12:37:00 PM

helpful dump questions

D
Da Costa
8/25/2023 7:30:00 AM

question 423 eigrp uses metric

B
Bsmaind
8/20/2023 9:22:00 AM

hello nice dumps

B
beau
1/12/2024 4:53:00 PM

good resource for learning

S
Sandeep
12/29/2023 4:07:00 AM

very useful

K
kevin
9/29/2023 8:04:00 AM

physical tempering techniques

B
Blessious Phiri
8/15/2023 4:08:00 PM

its giving best technical knowledge

AI Tutor 👋 I’m here to help!