Microsoft MO-201 Exam (page: 1)
Microsoft Excel Expert (Excel and Excel 2019)
Updated on: 12-Feb-2026

Viewing Page 1 of 6

SIMULATION
Instructions

Exam Environment

Exam Interface and Controls

The exam panel provides access to the project task(s). Each project has an associated file in which you will perform the project tasks.


1. Project file
2. Split bar
3. Exam panel

You can modify the exam interface to fit your needs in the following ways:
-To increase or decrease the exam panel font size, press Ctrl+Plus or Ctrl+Minus.
-To change the height of the exam panel, drag the split bar between the project file and the exam panel.
-To minimize the exam panel, click the Collapse Panel arrow in the upper-left corner of the exam panel. The minimized exam panel displays the Expand Panel button, the project number and name, the remaining time, and the Restart Project and Submit Project buttons. To move between tasks, you must expand the exam panel.

-To restore the interface to the default appearance, click the Restore button near the upper-right corner of the exam panel.

4. The Information bar at the top of the exam panel displays the current project and total number of projects, the remaining exam time, and the following commands:
-Collapse Panel. Minimizes the exam panel to provide more space for the project file.
-Restart Project. Closes and reopens the current project file without saving your changes. Submit Project. Saves your changes, submits the project file, and moves to the next project.
-Calculator. A calculator is available in some exams. You are not required to use the calculator. Restore. Restores the size and position of the project file and exam panel to the defaults. Help.
-Displays information about the exam interface.

5. The Content area displays the task tabs and the current task description.

6. The Navigation area at the bottom of the exam panel contains the following commands.
-Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.
-Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.
-Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.
-Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

You are analyzing data about the number of visitors to U.S. National Parks. Configure Excel so that you can edit content using Albanian as the editing language.
Do not make Albanian the default editing language. If you are prompted to restart Office, dismiss the prompt but do not restart Excel.

1 (exhibit):
2 (exhibit):
3 (exhibit):
4 (exhibit):
5 (exhibit):
6 (exhibit):
7 (exhibit):
8 (exhibit):
9 (exhibit):

  1. See explanation below.

Answer(s): A

Explanation:

1. In the open document, click on File.
2. Click on Options.
3. Click on Language.
4. Under the Choose Editing Languages section, use the drop-down menu to select a new language for Office to use to check spelling and grammar.
5. Click the Add button.
6. Click the OK button.
7. Click the OK button again.


Reference:

https://www.windowscentral.com/how-change-proofing-language-settings- office



SIMULATION
Instructions

Exam Environment

Exam Interface and Controls

The exam panel provides access to the project task(s). Each project has an associated file in which you will perform the project tasks.


1. Project file
2. Split bar
3. Exam panel

You can modify the exam interface to fit your needs in the following ways:
-To increase or decrease the exam panel font size, press Ctrl+Plus or Ctrl+Minus.
-To change the height of the exam panel, drag the split bar between the project file and the exam panel.
-To minimize the exam panel, click the Collapse Panel arrow in the upper-left corner of the exam panel. The minimized exam panel displays the Expand Panel button, the project number and name, the remaining time, and the Restart Project and Submit Project buttons. To move between tasks, you must expand the exam panel.

-To restore the interface to the default appearance, click the Restore button near the upper-right corner of the exam panel.

4. The Information bar at the top of the exam panel displays the current project and total number of projects, the remaining exam time, and the following commands:
-Collapse Panel. Minimizes the exam panel to provide more space for the project file.
-Restart Project. Closes and reopens the current project file without saving your changes. Submit Project. Saves your changes, submits the project file, and moves to the next project.
-Calculator. A calculator is available in some exams. You are not required to use the calculator. Restore. Restores the size and position of the project file and exam panel to the defaults. Help.
-Displays information about the exam interface.

5. The Content area displays the task tabs and the current task description.

6. The Navigation area at the bottom of the exam panel contains the following commands.
-Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.
-Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.
-Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.
-Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

On the “2019 Visitors” worksheet, modify the conditional formatting rule to format rows for parks that have a “Size” greater than 1,000 square miles.

Exhibit 1 (exhibit):
Exhibit 2 (exhibit):
Exhibit 3 (exhibit):
Exhibit 4 (exhibit):
Exhibit 5 (exhibit):
Exhibit 6 (exhibit):
Exhibit 7 (exhibit):
Exhibit 8 (exhibit):
Exhibit 9 (exhibit):

  1. See explanation below.

Answer(s): A

Explanation:

1. Select the entire dataset.
2. Go to Home –> Conditional Formatting –> Highlighting Cell Rules –> Greater Than.. / Less Than..
3. Select the ‘Greater than’ option. In the dialogue box, enter the number in the field on the left. The intent is to highlight cells that have a number greater than this specified number.
4. Specify the format to be applied to the cells that meet the condition by using the drop-down on the right, or specify your own format using the Custom Format option.
5. Click OK.


Reference:

https://trumpexcel.com/excel-conditional-formatting/



SIMULATION
Instructions

Exam Environment

Exam Interface and Controls

The exam panel provides access to the project task(s). Each project has an associated file in which you will perform the project tasks.


1. Project file
2. Split bar
3. Exam panel

You can modify the exam interface to fit your needs in the following ways:
-To increase or decrease the exam panel font size, press Ctrl+Plus or Ctrl+Minus.
-To change the height of the exam panel, drag the split bar between the project file and the exam panel.
-To minimize the exam panel, click the Collapse Panel arrow in the upper-left corner of the exam panel. The minimized exam panel displays the Expand Panel button, the project number and name, the remaining time, and the Restart Project and Submit Project buttons. To move between tasks, you must expand the exam panel.

-To restore the interface to the default appearance, click the Restore button near the upper-right corner of the exam panel.

4. The Information bar at the top of the exam panel displays the current project and total number of projects, the remaining exam time, and the following commands:
-Collapse Panel. Minimizes the exam panel to provide more space for the project file.
-Restart Project. Closes and reopens the current project file without saving your changes. Submit Project. Saves your changes, submits the project file, and moves to the next project.
-Calculator. A calculator is available in some exams. You are not required to use the calculator. Restore. Restores the size and position of the project file and exam panel to the defaults. Help.
-Displays information about the exam interface.

5. The Content area displays the task tabs and the current task description.

6. The Navigation area at the bottom of the exam panel contains the following commands.
-Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.
-Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.
-Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.
-Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

On the “Summary” worksheet, starting in cell A4, consolidate data from the 2014-2018 “by Region” worksheets. Display the average number of the “Recreation Visits” for each “Region”. Use labels in both the top row and left column. Delete the blank “Park Name” column from the consolidated data.

Exhibit 1 (exhibit):
Exhibit 2 (exhibit):
Exhibit 3 (exhibit):
Exhibit 4 (exhibit):
Exhibit 5 (exhibit):
Exhibit 6 (exhibit):
Exhibit 7 (exhibit):
Exhibit 8 (exhibit):
Exhibit 9 (exhibit):

  1. See explanation below.

Answer(s): A

Explanation:

1. Open the worksheets you want to consolidate.
2. Ensure the data in each spreadsheet is listed in a consistent format. Make sure the labels on each spreadsheet are listed in a consistent format. For example, if you have the date listed in the top row, and the product listed in the leftcolumn, make sure this is the same format for each spreadsheet. Make sure the rows and columns are in the same location for each spreadsheet. Delete any blank rows or columns in the spreadsheets.
3. Open a the “Summary” worksheet.
4. Click the cell that you want the consolidated rows and/or columns to start. Click the row and/or column that is consistent with where the tables are located in the other spreadsheets.
5. Click Data. It's in the menu bar at the top of Excel. This displays the Data panel at the top of the page.
6. Click the Consolidate icon. It's the icon that resembles two sheets with a blue arrow in between them pointing to a blue third sheet. This opens the consolidate menu.
7. Select a function. Use the drop-down menu below "Function" to select the method that the data will be consolidated. For example, if you want to add all the data together, select Sum. You can also select Count, Average, Min, Max andother functions.
8. Select a reference source. This is the first spreadsheet that you want to consolidate. If you want to consolidate sheets within the same file, click the arrow icon to the right of the bar below "References".
9. Highlight the data you want to consolidate. If you are consolidating data from a separate sheet within the same file, click and drag to highlight data and labels you want to consolidate. This will display sheet name followed by anexclamation mark followed by the row and column range in the references column (For example: "Q1SalesSheet!$A$2:$F$5").
10. Click Add. It's to the right of the "All References" list box. This adds the reference and range you select to the list of references. Repeat steps 6 through 10 for all sheets and files you want to consolidate.
11. Select the row or column for the labels. Click one or both checkboxes next to "Top row" and/or "Left column" to select which row or column contains the labels.
12. Click the checkbox next to "Create links to sources" (optional). By checking this option, the consolidated data will be updated automatically if one of the source references is updated
13. Click Ok. This adds the consolidated data to the “Summary” worksheet. You can see the source data from the consolidated data by clicking the plus icons (+) to the left of the cell numbers on the left side.

1. With your spreadsheet open, press F5 on the keyboard. The ‘Go To’ window will open. 2. Click on the ‘Special’ button

3. Click on ‘Blanks’ then click ‘OK’

4. This will select all the empty fields within your table.

5. In the ‘Home’ ribbon, click on the arrow below the ‘Delete’ button then click on ‘Delete Sheet Columns’

6. Your empty columns have now been removed.


Reference:

https://www.wikihow.com/Consolidate-in-Excel#/Image:Consolidate-in-Excel-Step-5-Version-4.jpg
https://www.itsupportguides.com/knowledge-base/office-2016/excel-2016-how-to-delete-all-empty-columns/



Instructions

Exam Environment

Exam Interface and Controls

The exam panel provides access to the project task(s). Each project has an associated file in which you will perform the project tasks.


1. Project file
2. Split bar
3. Exam panel

You can modify the exam interface to fit your needs in the following ways:
-To increase or decrease the exam panel font size, press Ctrl+Plus or Ctrl+Minus.
-To change the height of the exam panel, drag the split bar between the project file and the exam panel.
-To minimize the exam panel, click the Collapse Panel arrow in the upper-left corner of the exam panel. The minimized exam panel displays the Expand Panel button, the project number and name, the remaining time, and the Restart Project and Submit Project buttons. To move between tasks, you must expand the exam panel.

-To restore the interface to the default appearance, click the Restore button near the upper-right corner of the exam panel.

4. The Information bar at the top of the exam panel displays the current project and total number of projects, the remaining exam time, and the following commands:
-Collapse Panel. Minimizes the exam panel to provide more space for the project file.
-Restart Project. Closes and reopens the current project file without saving your changes. Submit Project. Saves your changes, submits the project file, and moves to the next project.
-Calculator. A calculator is available in some exams. You are not required to use the calculator. Restore. Restores the size and position of the project file and exam panel to the defaults. Help.
-Displays information about the exam interface.

5. The Content area displays the task tabs and the current task description.

6. The Navigation area at the bottom of the exam panel contains the following commands.
-Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.
-Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.
-Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.
-Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

On the “Volunteer Analysis” chart sheet, drill down into the data to display the number of volunteer hours for each month.

Exhibit 1 (exhibit):
Exhibit 2 (exhibit):
Exhibit 3 (exhibit):
Exhibit 4 (exhibit):
Exhibit 5 (exhibit):
Exhibit 6 (exhibit):
Exhibit 7 (exhibit):
Exhibit 8 (exhibit):
Exhibit 9 (exhibit):

  1. See explanation below.

Answer(s): A

Explanation:

If a chart has multiple fields in the Axis box, you set it to show levels and you see only one level at a time, starting with the top level.
To enable drill-down, access the Design tab > Show Levels > Enable Drill Down One Level at a Time. if you double-click on one of the bars, you will see the bars for the underlying data.


Reference:

https://support.microsoft.com/en-us/office/add-drill-down-to-a-power-view-chart-or-matrix-d67c5026-62f7-4766-9b22-3a8448c13ecd



SIMULATION
Instructions

Exam Environment

Exam Interface and Controls

The exam panel provides access to the project task(s). Each project has an associated file in which you will perform the project tasks.


1. Project file
2. Split bar
3. Exam panel

You can modify the exam interface to fit your needs in the following ways:
-To increase or decrease the exam panel font size, press Ctrl+Plus or Ctrl+Minus.
-To change the height of the exam panel, drag the split bar between the project file and the exam panel.
-To minimize the exam panel, click the Collapse Panel arrow in the upper-left corner of the exam panel. The minimized exam panel displays the Expand Panel button, the project number and name, the remaining time, and the Restart Project and Submit Project buttons. To move between tasks, you must expand the exam panel.

-To restore the interface to the default appearance, click the Restore button near the upper-right corner of the exam panel.

4. The Information bar at the top of the exam panel displays the current project and total number of projects, the remaining exam time, and the following commands:
-Collapse Panel. Minimizes the exam panel to provide more space for the project file.
-Restart Project. Closes and reopens the current project file without saving your changes. Submit Project. Saves your changes, submits the project file, and moves to the next project.
-Calculator. A calculator is available in some exams. You are not required to use the calculator. Restore. Restores the size and position of the project file and exam panel to the defaults. Help.
-Displays information about the exam interface.

5. The Content area displays the task tabs and the current task description.

6. The Navigation area at the bottom of the exam panel contains the following commands.
-Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.
-Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.
-Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.
-Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

You are creating a workbook for the regional meeting of Southridge Video.

On the “Regional Sales” worksheet, in cells D4:F7, use the Fill Series feature to complete the sales projections using a linear growth rate of 500,000 per year.

Exhibit 1 (exhibit):
Exhibit 2 (exhibit):
Exhibit 3 (exhibit):
Exhibit 4 (exhibit):
Exhibit 5 (exhibit):

  1. See explanation below.

Answer(s): A

Explanation:

1. Select all value cells for First-Year and Second-Year Sales.
2. Drag the fill handle to the Fifth-Year Projections column.


Reference:

https://support.microsoft.com/en-us/office/project-values-in-a-series-5311f5cf-149e-4d06-81dd-5aaad87e5400



Viewing Page 1 of 6



Share your comments for Microsoft MO-201 exam with other users:

Randall 9/28/2023 8:25:00 PM

on question 22, option b-once per session is also valid.
Anonymous


Tshegofatso 8/28/2023 11:51:00 AM

this website is very helpful
SOUTH AFRICA


philly 9/18/2023 2:40:00 PM

its my first time exam
SOUTH AFRICA


Beexam 9/4/2023 9:06:00 PM

correct answers are device configuration-enable the automatic installation of webview2 runtime. & policy management- prevent users from submitting feedback.
NEW ZEALAND


RAWI 7/9/2023 4:54:00 AM

is this dump still valid? today is 9-july-2023
SWEDEN


Annie 6/7/2023 3:46:00 AM

i need this exam.. please upload these are really helpful
PAKISTAN


Shubhra Rathi 8/26/2023 1:08:00 PM

please upload the oracle 1z0-1059-22 dumps
Anonymous


Shiji 10/15/2023 1:34:00 PM

very good questions
INDIA


Rita Rony 11/27/2023 1:36:00 PM

nice, first step to exams
Anonymous


Aloke Paul 9/11/2023 6:53:00 AM

is this valid for chfiv9 as well... as i am reker 3rd time...
CHINA


Calbert Francis 1/15/2024 8:19:00 PM

great exam for people taking 220-1101
UNITED STATES


Ayushi Baria 11/7/2023 7:44:00 AM

this is very helpfull for me
Anonymous


alma 8/25/2023 1:20:00 PM

just started preparing for the exam
UNITED KINGDOM


CW 7/10/2023 6:46:00 PM

these are the type of questions i need.
UNITED STATES


Nobody 8/30/2023 9:54:00 PM

does this actually work? are they the exam questions and answers word for word?
Anonymous


Salah 7/23/2023 9:46:00 AM

thanks for providing these questions
Anonymous


Ritu 9/15/2023 5:55:00 AM

interesting
CANADA


Ron 5/30/2023 8:33:00 AM

these dumps are pretty good.
Anonymous


Sowl 8/10/2023 6:22:00 PM

good questions
UNITED STATES


Blessious Phiri 8/15/2023 2:02:00 PM

dbua is used for upgrading oracle database
Anonymous


Richard 10/24/2023 6:12:00 AM

i am thrilled to say that i passed my amazon web services mls-c01 exam, thanks to study materials. they were comprehensive and well-structured, making my preparation efficient.
Anonymous


Janjua 5/22/2023 3:31:00 PM

please upload latest ibm ace c1000-056 dumps
GERMANY


Matt 12/30/2023 11:18:00 AM

if only explanations were provided...
FRANCE


Rasha 6/29/2023 8:23:00 PM

yes .. i need the dump if you can help me
Anonymous


Anonymous 7/25/2023 8:05:00 AM

good morning, could you please upload this exam again?
SPAIN


AJ 9/24/2023 9:32:00 AM

hi please upload sre foundation and practitioner exam questions
Anonymous


peter parker 8/10/2023 10:59:00 AM

the exam is listed as 80 questions with a pass mark of 70%, how is your 50 questions related?
Anonymous


Berihun 7/13/2023 7:29:00 AM

all questions are so important and covers all ccna modules
Anonymous


nspk 1/19/2024 12:53:00 AM

q 44. ans:- b (goto setup > order settings > select enable optional price books for orders) reference link --> https://resources.docs.salesforce.com/latest/latest/en-us/sfdc/pdf/sfom_impl_b2b_b2b2c.pdf(decide whether you want to enable the optional price books feature. if so, select enable optional price books for orders. you can use orders in salesforce while managing price books in an external platform. if you’re using d2c commerce, you must select enable optional price books for orders.)
Anonymous


Muhammad Rawish Siddiqui 12/2/2023 5:28:00 AM

"cost of replacing data if it were lost" is also correct.
SAUDI ARABIA


Anonymous 7/14/2023 3:17:00 AM

pls upload the questions
UNITED STATES


Mukesh 7/10/2023 4:14:00 PM

good questions
UNITED KINGDOM


Elie Abou Chrouch 12/11/2023 3:38:00 AM

question 182 - correct answer is d. ethernet frame length is 64 - 1518b. length of user data containing is that frame: 46 - 1500b.
Anonymous


Damien 9/23/2023 8:37:00 AM

i need this exam pls
Anonymous