Select the correct statement regarding test planning and control

  1. Test controlling is a one-time activity that will occur at the beginning of the test effort.
  2. Test planning includes identifying test activities and resources required for the test effort.
  3. Complex relationships (many to many, one to many) cannot exist among test conditions, test cases and test procedures.
  4. Risk and Test coverage is not a metric for test planning and control.

Answer(s): B



Select the correct statement;

I). Comparing actual progress against the plan is part of Test Controlling activity.
II). Updating the test plan if needed is part of test controlling activity.
Ill. Prioritization criteria identified during risk analysis should be applied only during test execution.
IV). Test conditions are identified by analyzing the test basis and test objectives.

  1. I and IV true. II and II false.
  2. I, II and IV true. III false.
  3. I, II and III true. IV false.
  4. II, III and IV true. I false.

Answer(s): B



The main Objective of Test Analysis and Design phase is to;

  1. Create test strategy and test plan
  2. Design and create the test environment
  3. Identify test conditions and create test cases
  4. Archive test results, logs and reports in the configuration management system

Answer(s): C



Which of the statements are true about test cases?

I). All test cases should be automated
II). Test cases should be repeatable
III). Test cases should be traceable back to requirements
IV). Test cases should have expected results

  1. I,II and III are true, IV is false
  2. II,III and IV are true, I is false
  3. III and IV are true , I and II false
  4. All of them are true

Answer(s): B



According to the ISTQB syllabus, Test Analysis and Design phase metrics include,

  1. Percentage of requirements covered by test conditions, percentage of test conditions covered by test cases and number of defects found during test analysis and design.
  2. Percentage of requirements covered by test conditions, percentage of test conditions covered by test cases and percentage of test cases automated.
  3. Percentage of requirements covered by test conditions, percentage of test cases automated and percentage of test environment configured.
  4. Percentage of test cases automated, percentage of test cases executed and percentage of test environment configured.

Answer(s): A



Objectives of test implementation phase are;

I). Create test procedures.
II). Finalize and create test data and set up environment
III). Create a test execution schedule / order
IV). Check test level entry criteria

  1. I and II true. III and IV false
  2. II, III and IV true. I false
  3. I, II, III and IV true.
  4. III and IV true, I and II false

Answer(s): C



Select the correct answer;

  1. If the expected and actual results do not match, it is always because of a defect in the software under test.
  2. Customers should not be involved in any level of test execution.
  3. Collecting test evidence / test logging is always up to the tester to decide.
  4. Actual and expected results comparison is part of test execution phase.

Answer(s): D



Select the correct answer;

I). IEEE 829 contains a standard for test summary report.
II). Test reporting can occur at the end of the testing effort.
III). Percentage of test time lost due to blocking events is not a valid metric to monitor.
IV). Test summary report may contain summary of testing activities, versions of the software tested and management approvals.

  1. I, II and III are true, IV false
  2. I and II true, III and IV are false
  3. I, II and IV are true, III false
  4. I and IV are true, II and III are false

Answer(s): C



Share your comments for ISTQB ISTQB-ADVANCED-LEV1 exam with other users:

T
Thembelani
5/30/2023 2:45:00 AM

need this dumps

A
Abduraimov
4/19/2023 12:43:00 AM

preparing for this exam is overwhelming. you cannot pass without the help of these exam dumps.

P
Puneeth
10/5/2023 2:06:00 AM

new to this site but i feel it is good

A
Ashok Kumar
1/2/2024 6:53:00 AM

the correct answer to q8 is b. explanation since the mule app has a dependency, it is necessary to include project modules and dependencies to make sure the app will run successfully on the runtime on any other machine. source code of the component that the mule app is dependent of does not need to be included in the exported jar file, because the source code is not being used while executing an app. compiled code is being used instead.

M
Merry
7/30/2023 6:57:00 AM

good questions

V
VoiceofMidnight
12/17/2023 4:07:00 PM

Delayed the exam until December 29th.

U
Umar Ali
8/29/2023 2:59:00 PM

A and D are True

V
vel
8/28/2023 9:17:09 AM

good one with explanation

G
Gurdeep
1/18/2024 4:00:15 PM

This is one of the most useful study guides I have ever used.