ISTQB Advanced Level Test manager Exam ISTQB-ADVANCED-LEV1 Dumps in PDF

Free ISTQB ISTQB-ADVANCED-LEV1 Real Questions (page: 1)

According to ISTQB syllabus, systems of systems;

I). Contain interconnected hardware, software applications and communications.
II). Include big bang merging of independent collaborating systems to avoid creating the entire system from scratch.
III). Can be less reliable than individual systems
IV). Characteristics include; long duration of projects, version management and regression tests at systems of systems level.

  1. I, II and IV are true.
  2. I, II are true and III is false.
  3. I, III, and IV are true, II is false.
  4. II,III and IV are true, I is false.

Answer(s): C



Select the correct statement;

  1. Testing processes are interconnected and related to activities like requirements engineering, software development, etc.
  2. Testing tasks cannot be concurrent.
  3. Requirements engineering and software testing are two isolated activities.
  4. Testing activities / processes do not have to be aligned to the chosen software development lifecycle model.

Answer(s): A



Which of the following statements are false?

I). Test execution starts when the system entry criteria are met (or waived) and test execution ends when exit criteria are met.
II). System test environment creation might start during system design in V-model
III). Long term prospects needs to be considered when selecting test process or tools.
IV). Daily/weekly scrum meetings are part of agile testing method.

  1. I and II and false.
  2. II, III and IV are false
  3. I, II, III are false
  4. None of them are false

Answer(s): D



System test closure activities occur;

I). After system exit criteria are met.
II). After acceptance testing is over.
III). After all project activities are finished.
IV). After the execution of all test cases.

  1. I,II and IV are true
  2. II and IV are true
  3. I,II, III are true
  4. All of them are true

Answer(s): C



Which of the following statements are true?

I). Early test planning and later test execution is an activity of sequential software development model
II). Change and configuration management are not needed for software testing activities.
III). Based on the project context, additional levels of testing like hardware-software integration testing, feature interaction testing can be done.
IV). System test planning and project planning could occur concurrently in V-model.

  1. I, II and III are true.
  2. II, III and IV are true.
  3. I, III and IV are true.
  4. I and III are true.

Answer(s): C



According to ISTQB syllabus, characteristics of systems of systems are;

I). Long duration of projects
II). Multiple levels of integration
III). Need for Maintenance Testing
IV). No formal development lifecycle or milestones.

  1. I, II true, III and IV false.
  2. I, II, III true, IV false.
  3. II, III IV true, I false.
  4. All of the above are true.

Answer(s): B



Which of the following is true about safety critical systems?

  1. System failures could be life threatening.
  2. The supplier of the safety critical system is not liable for any damage caused by the system.
  3. Testing proves that there are no failures or defects in the system.
  4. Traceability to regulatory requirements and compliance is not necessary.

Answer(s): A



Select the correct statements about safety critical systems;

I). Risk management reduces the likelihood and / or impact of a risk.
II). Failure Mode and Effect Analysis (FMEA) technique is used mainly for safety critical systems.
III). All safety critical systems are subject to sector specific regulations only.
IV). Full traceability from requirements to evidence is required in some safety critical systems.

  1. I, II, IV true, III false
  2. II,III, IV true, I false
  3. I, IV true, II, III false
  4. All of the above true

Answer(s): A



Share your comments for ISTQB ISTQB-ADVANCED-LEV1 exam with other users:

D
DiligentSam
9/30/2023 10:26:00 AM

need it thx

V
Vani
8/10/2023 8:11:00 PM

good questions

F
Fares
9/11/2023 5:00:00 AM

good one nice revision

L
Lingaraj
10/26/2023 1:27:00 AM

i love this thank you i need

M
Muhammad Rawish Siddiqui
12/5/2023 12:38:00 PM

question # 142: data governance is not one of the deliverables in the document and content management context diagram.

A
al
6/7/2023 10:25:00 AM

most answers not correct here

B
Bano
1/19/2024 2:29:00 AM

what % of questions do we get in the real exam?

O
Oliviajames
10/25/2023 5:31:00 AM

i just want to tell you. i took my microsoft az-104 exam and passed it. your program was awesome. i especially liked your detailed questions and answers and practice tests that made me well-prepared for the exam. thanks to this website!!!

D
Divya
8/27/2023 12:31:00 PM

all the best

K
KY
1/1/2024 11:01:00 PM

very usefull document

A
Arun
9/20/2023 4:52:00 PM

nice and helpful questions

J
Joseph J
7/11/2023 2:53:00 PM

i found the questions helpful

M
Meg
10/12/2023 8:02:00 AM

q 105 . ans is d

N
Navaneeth S
7/14/2023 7:57:00 AM

i have interest to get a sybase iq dba certification

A
Aish
10/11/2023 5:27:00 AM

want to pass exm.

A
Anonymous
6/12/2023 7:23:00 AM

are the answers correct?

K
Kris
7/7/2023 9:43:00 AM

good morning, could you please upload this exam again, i need it to test my knowledge in sd-wan with version 7.0.

M
Meghraj mali
10/7/2023 1:47:00 PM

very nice question

N
Noel
11/1/2022 9:14:00 PM

i have learning disability and this exam dumps allowed me to focus on the actual questions and not worry about notes and the those other study materials.

J
Jas
10/25/2023 6:01:00 PM

165 should be apt

N
Neetu
6/22/2023 8:41:00 AM

please upload the dumps, real need of them

M
Mark
10/24/2023 1:34:00 AM

any recent feeedback?

G
Gopinadh
8/9/2023 4:05:00 AM

question number 2 is indicating you are giving proper questions. observe and change properly.

S
Santhi
1/1/2024 8:23:00 AM

passed today.40% questions were new.litwere case study,lots of new questions on afd,ratelimit,tm,lb,app gatway.got 2 set series of questions which are not present here.questions on azure cyclecloud, no.of vnet/vms required for implimentation,blueprints assignment/management group etc

R
Raviraj Magadum
1/12/2024 11:39:00 AM

practice test

S
sivaramakrishnan
7/27/2023 8:12:00 AM

want the dumps for emc content management server programming(cmsp)

A
Aderonke
10/23/2023 1:52:00 PM

brilliant and helpful

A
Az
9/16/2023 2:43:00 PM

q75. azure files is pass

K
ketty
11/9/2023 8:10:00 AM

very helpful

S
Sonail
5/2/2022 1:36:00 PM

thank you for these questions. it helped a lot.

S
Shariq
7/28/2023 8:00:00 AM

how do i get the h12-724 dumps

A
adi
10/30/2023 11:51:00 PM

nice data dumps

E
EDITH NCUBE
7/25/2023 7:28:00 AM

answers are correct

R
Raja
6/20/2023 4:38:00 AM

good explanation

AI Tutor 👋 I’m here to help!