According to ISTQB syllabus, systems of systems;

I). Contain interconnected hardware, software applications and communications.
II). Include big bang merging of independent collaborating systems to avoid creating the entire system from scratch.
III). Can be less reliable than individual systems
IV). Characteristics include; long duration of projects, version management and regression tests at systems of systems level.

  1. I, II and IV are true.
  2. I, II are true and III is false.
  3. I, III, and IV are true, II is false.
  4. II,III and IV are true, I is false.

Answer(s): C



Select the correct statement;

  1. Testing processes are interconnected and related to activities like requirements engineering, software development, etc.
  2. Testing tasks cannot be concurrent.
  3. Requirements engineering and software testing are two isolated activities.
  4. Testing activities / processes do not have to be aligned to the chosen software development lifecycle model.

Answer(s): A



Which of the following statements are false?

I). Test execution starts when the system entry criteria are met (or waived) and test execution ends when exit criteria are met.
II). System test environment creation might start during system design in V-model
III). Long term prospects needs to be considered when selecting test process or tools.
IV). Daily/weekly scrum meetings are part of agile testing method.

  1. I and II and false.
  2. II, III and IV are false
  3. I, II, III are false
  4. None of them are false

Answer(s): D



System test closure activities occur;

I). After system exit criteria are met.
II). After acceptance testing is over.
III). After all project activities are finished.
IV). After the execution of all test cases.

  1. I,II and IV are true
  2. II and IV are true
  3. I,II, III are true
  4. All of them are true

Answer(s): C



Which of the following statements are true?

I). Early test planning and later test execution is an activity of sequential software development model
II). Change and configuration management are not needed for software testing activities.
III). Based on the project context, additional levels of testing like hardware-software integration testing, feature interaction testing can be done.
IV). System test planning and project planning could occur concurrently in V-model.

  1. I, II and III are true.
  2. II, III and IV are true.
  3. I, III and IV are true.
  4. I and III are true.

Answer(s): C



According to ISTQB syllabus, characteristics of systems of systems are;

I). Long duration of projects
II). Multiple levels of integration
III). Need for Maintenance Testing
IV). No formal development lifecycle or milestones.

  1. I, II true, III and IV false.
  2. I, II, III true, IV false.
  3. II, III IV true, I false.
  4. All of the above are true.

Answer(s): B



Which of the following is true about safety critical systems?

  1. System failures could be life threatening.
  2. The supplier of the safety critical system is not liable for any damage caused by the system.
  3. Testing proves that there are no failures or defects in the system.
  4. Traceability to regulatory requirements and compliance is not necessary.

Answer(s): A



Select the correct statements about safety critical systems;

I). Risk management reduces the likelihood and / or impact of a risk.
II). Failure Mode and Effect Analysis (FMEA) technique is used mainly for safety critical systems.
III). All safety critical systems are subject to sector specific regulations only.
IV). Full traceability from requirements to evidence is required in some safety critical systems.

  1. I, II, IV true, III false
  2. II,III, IV true, I false
  3. I, IV true, II, III false
  4. All of the above true

Answer(s): A



Viewing Page 1 of 11



Share your comments for ISTQB® ISTQB-ADVANCED-LEV1 exam with other users:

User-sfdc 12/29/2023 7:21:00 AM

sample questions seems good
Anonymous


Tamer dam 8/4/2023 10:21:00 AM

huawei is ok
UNITED STATES


YK 12/11/2023 1:10:00 AM

good one nice
JAPAN


de 8/28/2023 2:38:00 AM

please continue
GERMANY


DMZ 6/25/2023 11:56:00 PM

this exam dumps just did the job. i donot want to ruffle your feathers but your exam dumps and mock test engine is amazing.
UNITED KINGDOM


Jose 8/30/2023 6:14:00 AM

nice questions
PORTUGAL


Tar01 7/24/2023 7:07:00 PM

the explanation are really helpful
Anonymous


DaveG 12/15/2023 4:50:00 PM

just passed my exam yesterday on my first attempt. these dumps were extremely helpful in passing first time. the questions were very, very similar to these questions!
Anonymous


A.K. 6/30/2023 6:34:00 AM

cosmos db is paas not saas
Anonymous


S Roychowdhury 6/26/2023 5:27:00 PM

what is the percentage of common questions in gcp exam compared to 197 dump questions? are they 100% matching with real gcp exam?
Anonymous


Bella 7/22/2023 2:05:00 AM

not able to see questions
Anonymous


Scott 9/8/2023 7:19:00 AM

by far one of the best sites for free questions. i have pass 2 exams with the help of this website.
CANADA


donald 8/19/2023 11:05:00 AM

excellent question bank.
Anonymous


Ashwini 8/22/2023 5:13:00 AM

it really helped
Anonymous


sk 5/13/2023 2:07:00 AM

excelent material
INDIA


Christopher 9/5/2022 10:54:00 PM

the new versoin of this exam which i downloaded has all the latest questions from the exam. i only saw 3 new questions in the exam which was not in this dump.
CANADA


Sam 9/7/2023 6:51:00 AM

question 8 - can cloudtrail be used for storing jobs? based on aws - aws cloudtrail is used for governance, compliance and investigating api usage across all of our aws accounts. every action that is taken by a user or script is an api call so this is logged to [aws] cloudtrail. something seems incorrect here.
UNITED STATES


Tanvi Rajput 8/14/2023 10:55:00 AM

question 13 tda - c01 answer : quick table calculation -> percentage of total , compute using table down
UNITED KINGDOM


PMSAGAR 9/19/2023 2:48:00 AM

pls share teh dump
UNITED STATES


zazza 6/16/2023 10:47:00 AM

question 44 answer is user risk
ITALY


Prasana 6/23/2023 1:59:00 AM

please post the questions for preparation
Anonymous


test user 9/24/2023 3:15:00 AM

thanks for the questions
AUSTRALIA


Draco 7/19/2023 5:34:00 AM

please reopen it now ..its really urgent
UNITED STATES


Megan 4/14/2023 5:08:00 PM

these practice exam questions were exactly what i needed. the variety of questions and the realistic exam-like environment they created helped me assess my strengths and weaknesses. i felt more confident and well-prepared on exam day, and i owe it to this exam dumps!
UNITED KINGDOM


abdo casa 8/9/2023 6:10:00 PM

thank u it very instructuf
Anonymous


Danny 1/15/2024 9:10:00 AM

its helpful?
INDIA


hanaa 10/3/2023 6:57:00 PM

is this dump still valid???
Anonymous


Georgio 1/19/2024 8:15:00 AM

question 205 answer is b
Anonymous


Matthew Dievendorf 5/30/2023 9:37:00 PM

question 39, should be answer b, directions stated is being sudneted from /21 to a /23. a /23 has 512 ips so 510 hosts. and can make 4 subnets out of the /21
Anonymous


Adhithya 8/11/2022 12:27:00 AM

beautiful test engine software and very helpful. questions are same as in the real exam. i passed my paper.
UNITED ARAB EMIRATES


SuckerPumch88 4/25/2022 10:24:00 AM

the questions are exactly the same in real exam. just make sure not to answer all them correct or else they suspect you are cheating.
UNITED STATES


soheib 7/24/2023 7:05:00 PM

question: 78 the right answer i think is d not a
Anonymous


srija 8/14/2023 8:53:00 AM

very helpful
EUROPEAN UNION


Thembelani 5/30/2023 2:17:00 AM

i am writing this exam tomorrow and have dumps
Anonymous