According to ISTQB syllabus, systems of systems;I). Contain interconnected hardware, software applications and communications.II). Include big bang merging of independent collaborating systems to avoid creating the entire system from scratch.III). Can be less reliable than individual systems IV). Characteristics include; long duration of projects, version management and regression tests at systems of systems level.
Answer(s): C
Select the correct statement;
Answer(s): A
Which of the following statements are false?I). Test execution starts when the system entry criteria are met (or waived) and test execution ends when exit criteria are met.II). System test environment creation might start during system design in V-model III). Long term prospects needs to be considered when selecting test process or tools. IV). Daily/weekly scrum meetings are part of agile testing method.
Answer(s): D
System test closure activities occur;I). After system exit criteria are met.II). After acceptance testing is over.III). After all project activities are finished.IV). After the execution of all test cases.
Which of the following statements are true?I). Early test planning and later test execution is an activity of sequential software development modelII). Change and configuration management are not needed for software testing activities.III). Based on the project context, additional levels of testing like hardware-software integration testing, feature interaction testing can be done.IV). System test planning and project planning could occur concurrently in V-model.
According to ISTQB syllabus, characteristics of systems of systems are;I). Long duration of projectsII). Multiple levels of integrationIII). Need for Maintenance TestingIV). No formal development lifecycle or milestones.
Answer(s): B
Which of the following is true about safety critical systems?
Select the correct statements about safety critical systems;I). Risk management reduces the likelihood and / or impact of a risk.II). Failure Mode and Effect Analysis (FMEA) technique is used mainly for safety critical systems.III). All safety critical systems are subject to sector specific regulations only.IV). Full traceability from requirements to evidence is required in some safety critical systems.
Share your comments for ISTQB ISTQB-ADVANCED-LEV1 exam with other users:
thanks for the dump
fantastic assessments
i find the xengine test engine simulator to be more fun than reading from pdf.
nice document
thank you for making the questions and answers intractive and selectable.
answers are correct?
can i belive this dump
great site to practice for sitecore exam
good for students
nice practice dumps
nokia 4a0-114 dumps
great content and wonderful to have the answers with explanation
for question #118, the answer is option c. the screen shot is showing the drop down, but the answer is marked incorrectly please update . thanks for sharing such nice questions.
the correct answer for the question 29 is d.
question no 22: correct answers: bc, 1 per session 1 per page 1 per component always
these are pretty useful
awesome
yes please upload
great job whoever put this together, for the greater good! thanks!
just started to view all questions for the exam
helpful material
hope for the best
will post exam has finished
really correct and good analyze!
excellent thanks a lot
will post once pass the cka exam
good content
q:32 answer has to be option c
nice questions
i really like the support team in this website. they are fast in communication and very helpful.
a good contemporary exam review
q23, its an array, isnt it? starts with [ and end with ]. its an array of objects, not object.
cool very helpfull
i just passed. this exam dumps is the same one from prepaway and examcollection. it has all the real test questions.