IIA Certified Internal Auditor - Part 3, Business Analysis and Information Technology IIA-CIA-Part3 Dumps in PDF

Free IIA IIA-CIA-Part3 Real Questions (page: 28)

Data regarding four different products manufactured by an organization are presented as follows. Direct material and direct labor are readily available from the respective resource markets.
However, the manufacturer is limited to a maximum of 3,000 machine hours per month.


Units Produced per Machine Hour: A: 3 B: 4 C: 2 D: 3
The product that is the most profitable for the manufacturer in this situation is

  1. Product A
  2. Product B
  3. Product C
  4. Product D

Answer(s): B

Explanation:

Answer B is correct.
When resources are limited, maximum profits are achieved by maximizing the dollar contribution margin per limited or constraining factor. In this situation, machine hours are the constraining factor. Product B has a contribution margin per machine hour of US $28 [A x (US $18 - $11)], which is greater than that of Product A [3 x (US $15 - $7) = US $24], Product C [2 x (US $20 - $10) = US $20], or Product D [3 x (US $25 - $16) = US $27].



Business process reengineering is most likely to:

  1. Implement modern information systems technology to eliminate some controls.
  2. Be applied within individual departments.
  3. Improve existing procedures.
  4. Apply a continuous improvement model.

Answer(s): A

Explanation:

Reengineering and TQM techniques eliminate many traditional controls. They exploit modern technology to improve productivity and decrease the number of clerical workers. Thus, controls should be automated and self-correcting and require minimal human intervention. Moreover, auditors must be prepared to encounter (and use) new technologies. The emphasis therefore shifts to monitoring so management can determine when an operation may be out of control and corrective action is needed.



One drawback of business process reengineenng (BPR), sometimes referred to as business process analysis, is:

  1. Improved efficiency in the business processes analyzed.
  2. Excess of cost over the benefit.
  3. Reduction of operational efficiency.
  4. Employee resistance to change.

Answer(s): D

Explanation:

Business process reengineering (BPR), or business process analysis, involves process innovation and process redesign. Instead of improving existing procedures, it finds new ways of doing things. One major drawback of BPR is that employees may be resistant due to fear of layoffs, being replaced, or insecurity about new required skills or tasks that the employee now has to perform.



A company has several departments that conduct technical studies and prepare reports for clients. Recently, there have been long delays in having these reports copied at the company's centralized copy center because of the dramatic increase in business. Management is considering decentralizing copy services to reduce the turnaround and provide clients with timely reports. An appropriate technique for minimizing turnaround time and the cost of providing copy services is:

  1. Queuing theory.
  2. Linear programming.
  3. Regression analysis.
  4. Game theory.

Answer(s): A

Explanation:

Two basic costs are involved in queuing (waiting-line) models: (1) the cost of providing service (including facility costs and operating costs) and (2) the cost of idle resources waiting in line. The latter may be a direct cost if paid employees are waiting, or an opportunity cost in the case of waiting customers. The objective of queuing theory is to minimize the total cost of the system, including both service and waiting costs, for a given rate of arrivals. This minimization occurs at the point at which cost of waiting is balanced by the cost of providing service. This company wishes to reduce the total of waiting costs (turnaround time) and the cost of copy services.



The problem just described is best approached by use of which quantitative method?

  1. Integrated autoregressive-moving average (ARIMA) modeling.
  2. Exponential smoothing, multiple parameters.
  3. Queuing theory.
  4. Linear programming.

Answer(s): C

Explanation:

Two basic costs are involved in queuing (waiting-line) models: (1) the cost of providing service (including facility costs and operating costs), and (2) the cost of idle resources waiting in line. The latter may be a direct cost if paid employees are waiting, or an opportunity cost in the case of waiting customers. The objective of the queuing theory is to minimize the total cost of the system, including both service and waiting costs, for a given rate of arrivals. This minimization occurs at the point where the cost of waiting is balanced by the cost of providing service.



Share your comments for IIA IIA-CIA-Part3 exam with other users:

L
Lucky
10/31/2023 2:01:00 PM

does anyone who attended exam csa 8.8, can confirm these questions are really coming ? or these are just for practicing?

P
Prateek
9/18/2023 11:13:00 AM

kindly share the dumps

I
Irfan
11/25/2023 1:26:00 AM

very nice content

P
php
6/16/2023 12:49:00 AM

passed today

D
Durga
6/23/2023 1:22:00 AM

hi can you please upload questions

J
JJ
5/28/2023 4:32:00 AM

please upload quetions

N
Norris
1/3/2023 8:06:00 PM

i passed my exam thanks to this braindumps questions. these questions are valid in us and i highly recommend it!

A
abuti
7/21/2023 6:10:00 PM

are they truely latest

C
Curtis Nakawaki
7/5/2023 8:46:00 PM

questions appear contemporary.

V
Vv
12/2/2023 6:31:00 AM

good to prepare in this site

P
praveenkumar
11/20/2023 11:57:00 AM

very helpful to crack first attempt

A
asad Raza
5/15/2023 5:38:00 AM

please upload this exam

R
Reeta
7/17/2023 5:22:00 PM

please upload the c_activate22 dump questions with answer

W
Wong
12/20/2023 11:34:00 AM

q10 - the answer should be a. if its c, the criteria will meet if either the prospect is not part of the suppression lists or if the job title contains vice president

D
david
12/12/2023 12:38:00 PM

this was on the exam as of 1211/2023

T
Tink
7/24/2023 9:23:00 AM

great for prep

J
Jaro
12/18/2023 3:12:00 PM

i think in question 7 the first answer should be power bi portal (not power bi)

9
9eagles
4/7/2023 10:04:00 AM

on question 10 and so far 2 wrong answers as evident in the included reference link.

T
Tai
8/28/2023 5:28:00 AM

wonderful material

V
VoiceofMidnight
12/29/2023 4:48:00 PM

i passed!! ...but barely! got 728, but needed 720 to pass. the exam hit me with labs right out of the gate! then it went to multiple choice. protip: study the labs!

A
A K
8/3/2023 11:56:00 AM

correct answer for question 92 is c -aws shield

N
Nitin Mindhe
11/27/2023 6:12:00 AM

great !! it is really good

B
BailleyOne
11/22/2023 1:45:00 AM

explanations for the answers are to the point.

P
patel
10/25/2023 8:17:00 AM

how can rea next

M
MortonG
10/19/2023 6:32:00 PM

question: 128 d is the wrong answer...should be c

J
Jayant
11/2/2023 3:15:00 AM

thanks for az 700 dumps

B
Bipul Mishra
12/14/2023 7:12:00 AM

thank you for this tableau dumps . it will helpfull for tableau certification

H
hello
10/31/2023 12:07:00 PM

good content

M
Matheus
9/3/2023 2:14:00 PM

just testing if the comments are real

Y
yenvti2@gmail.com
8/12/2023 7:56:00 PM

very helpful for exam preparation

M
Miguel
10/5/2023 12:16:00 PM

question 11: https://help.salesforce.com/s/articleview?id=sf.admin_lead_to_patient_setup_overview.htm&type=5

N
Noushin
11/28/2023 4:52:00 PM

i think the answer to question 42 is b not c

S
susan sandivore
8/28/2023 1:00:00 AM

thanks for the dump

A
Aderonke
10/31/2023 12:51:00 AM

fantastic assessments

AI Tutor 👋 I’m here to help!