Huawei HCIA-LTE-RNP&RNO V1.0 H35-560 Dumps in PDF

Free Huawei H35-560 Real Questions (page: 12)

Which of the following functions is used for inter-cell interference coordination?

  1. ANR
  2. ICIC
  3. BF
  4. AMR

Answer(s): B



In single-site verification, within the visible target coverage area of the base station, which of the following principles should be met for the RSRP compliance rate of the test road?

  1. The probability that F band meets RSRP> -HOdBm and RS-SINR> -3dB is greater than 98%; D band is greater than 90%
  2. The probability that F band meets RSRP> -105dBm and RS-SINR> -3dB is greater than 98%; D band is greater than 90%
  3. The probability that F band meets RSRP> -lOOdBm and RS-SINR> -3dB is greater than 98%; D band is greater than 90%
    3dB is greater than 98%; D band
  4. The probability that F band meets RSRP> -95dBm and RS-SINR > is greater than 90%

Answer(s): A



The single-site verification test only needs to verify whether the cell status is normal in the idle mode.

  1. True
  2. False

Answer(s): B



Which of the following is not a weak coverage solution?

  1. adjusteNodeBTransmit power
  2. Adjust the antenna azimuth and downtilt angle, increase the antenna height, and replace the high- altitude wire, etc.
  3. Adjust neighbor relations
  4. Check whether the room sub-system or repeater is working normally, and check whether there is other radio interference

Answer(s): C



What are the principles that need to be followed when planning LTE neighboring cells? (Multiple choice)

  1. Neighborhoods that are directly adjacent to the geographic location are generally regarded as neighboring cells
  2. For dense urban areas and ordinary urban areas, due to the relatively close distance between stations (0.3-1.0 km), neighbouring areas should do more
  3. Because there are no sequential I and possible questions in LTE neighboring cells, and the detection period is very short, it is only necessary to consider not missing neighboring cells, and it is not necessary to sort neighboring cells strictly according to signal strength.
  4. Turn on ANR to completely replace the neighborhood planning of the initial network

Answer(s): A,B,C



Share your comments for Huawei H35-560 exam with other users:

J
Jefi
9/4/2023 8:15:00 AM

please upload the practice questions

T
Thembelani
5/30/2023 2:45:00 AM

need this dumps

A
Abduraimov
4/19/2023 12:43:00 AM

preparing for this exam is overwhelming. you cannot pass without the help of these exam dumps.

P
Puneeth
10/5/2023 2:06:00 AM

new to this site but i feel it is good

A
Ashok Kumar
1/2/2024 6:53:00 AM

the correct answer to q8 is b. explanation since the mule app has a dependency, it is necessary to include project modules and dependencies to make sure the app will run successfully on the runtime on any other machine. source code of the component that the mule app is dependent of does not need to be included in the exported jar file, because the source code is not being used while executing an app. compiled code is being used instead.

M
Merry
7/30/2023 6:57:00 AM

good questions

V
VoiceofMidnight
12/17/2023 4:07:00 PM

Delayed the exam until December 29th.

U
Umar Ali
8/29/2023 2:59:00 PM

A and D are True

V
vel
8/28/2023 9:17:09 AM

good one with explanation

G
Gurdeep
1/18/2024 4:00:15 PM

This is one of the most useful study guides I have ever used.

AI Tutor 👋 I’m here to help!