Huawei H35-560 Exam (page: 1)
Huawei HCIA-LTE-RNP&RNO V1.0
Updated on: 12-Feb-2026

Viewing Page 1 of 18

The drive test scenario judges the success of the handover, usually based on the signaling. On the terminal side, which of the following signaling starts the handover process?

  1. Measurement Control
  2. Measurement Report
  3. Handover Request
  4. Handover Command

Answer(s): B



In the process of LTE network optimization, which of the following data sources are used for problem location analysis? (multiple choice)

  1. Project Files
  2. Traffic statistics and alarm data
  3. useUser complaint record
  4. Signaling data
  5. netNetwork test data

Answer(s): B,C,D,E



Before coverage analysis, it is necessary to obtain basic data such as the planning plan, site distribution, base station configuration, antenna feeder configuration, RS power and service load characteristics of the optimized target are

  1. Then obtain the information of the existing network data, conduct a comparative analysis, and find out the areas where the coverage problem may exist.
  2. True
  3. False

Answer(s): A



Regarding TA planning, which of the following statements is incorrect?

  1. LTE of TAPlanning should be consistent with 2G/3G of LAPlan to be consistent
  2. Currently LTE of TALCan contain at most 16PieceTA
  3. LTE of TANumber of cells in Should be better than the corresponding2G/3G LASmall number of medium cells
  4. Each A single-operator cell can belong to multipleTA

Answer(s): D



Which of the following carrier bandwidths does LTE support? (multiple choice)

  1. 40M
  2. 5M
  3. 15M
  4. 20M

Answer(s): B,C,D



Viewing Page 1 of 18



Share your comments for Huawei H35-560 exam with other users:

Abduraimov 4/19/2023 12:43:00 AM

preparing for this exam is overwhelming. you cannot pass without the help of these exam dumps.
UNITED KINGDOM


Puneeth 10/5/2023 2:06:00 AM

new to this site but i feel it is good
EUROPEAN UNION


Ashok Kumar 1/2/2024 6:53:00 AM

the correct answer to q8 is b. explanation since the mule app has a dependency, it is necessary to include project modules and dependencies to make sure the app will run successfully on the runtime on any other machine. source code of the component that the mule app is dependent of does not need to be included in the exported jar file, because the source code is not being used while executing an app. compiled code is being used instead.
Anonymous


Merry 7/30/2023 6:57:00 AM

good questions
Anonymous


VoiceofMidnight 12/17/2023 4:07:00 PM

Delayed the exam until December 29th.
UNITED STATES


Umar Ali 8/29/2023 2:59:00 PM

A and D are True
Anonymous


vel 8/28/2023 9:17:09 AM

good one with explanation
Anonymous


Gurdeep 1/18/2024 4:00:15 PM

This is one of the most useful study guides I have ever used.
CANADA