HP HPE7-A03 Exam (page: 1)
HP Aruba Certified Campus Access Architect
Updated on: 26-Oct-2025

Viewing Page 1 of 15

DRAG DROP (Drag and Drop is not supported)
What should be Included in an Executive Summary? (Place the correct Items into the let at the right Order is no: Important Not all cottons win be used)

  1. See Explanation section for answer.

Answer(s): A

Explanation:

For an Executive Summary, typically the following items should be included:
Brief Summary
Contact Information
High-Level Design
Purpose of the Document
Recommendations
Scope
Target Audience



A customer wants to have the ability to show network usage.
Which product would allow them to have this visibility?

  1. Central
  2. ClearPass
  3. UXI
  4. Aruba OS 8.X

Answer(s): A

Explanation:

Aruba Central provides a cloud-based management platform for managing and monitoring Aruba Instant APs, switches, and branch gateways. It offers a comprehensive dashboard that gives insights into network usage, health, and performance metrics. Central allows network administrators to have visibility over their entire network infrastructure from a single pane of glass, including detailed usage statistics, which can be broken down by device, application, and time. This visibility into network usage is crucial for optimizing network performance, planning capacity, and understanding user behavior. Aruba Central's analytics and reporting capabilities enable customers to track and analyze network usage, making it the appropriate product choice for customers wanting to monitor their network usage closely.



The clients existing network is experiencing trouble with voice occasionally dropping out on phone calls between office locations, it Is determined that no packet loss is occurring and QOS is likely the cause. With what phenomenon Is the client currently experiencing issues?







Answer(s): B

Explanation:

The client is experiencing issues with Jitter, as depicted in Option B. Jitter refers to the variation in time between packets arriving, caused by network congestion, timing drift, or route changes. In voice communications, jitter can manifest as the occasional dropping out of voice on phone calls because the variable delay can affect the steady stream of voice packets needed for a clear conversation. Even when there is no packet loss, high levels of jitter can significantly impact the quality of Voice over IP (VoIP) calls. Quality of Service (QoS) settings are essential in managing jitter, as they can prioritize voice traffic over other types of data, ensuring that voice packets are delivered consistently and in the correct order to minimize delays and prevent call quality degradation. Aruba Campus Access solutions would typically include QoS features to manage and mitigate jitter on the network.



You ate presenting your network design solution to your customer.
What Is important to include in your presentation?

  1. protocols that will be used to make your solution work
  2. your rollback plan
  3. your experience with this kind of project
  4. tangible and intangible returns for the customer

Answer(s): D

Explanation:

When presenting a network design solution to a customer, it is crucial to focus on the benefits that the solution will bring to their business. This includes both tangible returns, such as cost savings, increased efficiency, and improved performance, and intangible returns, such as enhanced security, scalability, and user satisfaction. Highlighting how the solution addresses the customer's specific needs and challenges, and how it aligns with their business objectives, helps in demonstrating the value of the solution and facilitates decision-making. Including tangible and intangible returns in the presentation makes it more compelling and relevant to the customer's business goals, thereby increasing the likelihood of the proposal's acceptance.



The customer recently found out that Aruba OS-CX switches are capable of Application Recognition.
What requirements should be fulfilled in order to do this? (Select two.)

  1. 6400 with Aruba CX Advanced License
  2. 6300F/M with Aruba CX Advanced License
  3. 8360 with Aruba CX Advanced License
  4. 6200F/M with Aruba CX Advanced License

Answer(s): A

Explanation:

Aruba OS-CX switches, specifically the Aruba 6400 and 6300F/M models, are designed to support advanced networking features, including Application Recognition, with the Aruba CX Advanced License. The Advanced License enables enhanced capabilities such as deeper visibility into application flows, advanced routing features, and improved network analytics. Application Recognition allows these switches to identify and classify applications running on the network, enabling more intelligent and dynamic network policies and improving overall network performance and security. The requirement for an Aruba CX Advanced License on these specific models ensures that the necessary software features and support are available to leverage Application Recognition capabilities effectively.



Viewing Page 1 of 15



Share your comments for HP HPE7-A03 exam with other users:

Gerald 9/11/2023 12:22:00 PM

just took the comptia cybersecurity analyst (cysa+) - wished id seeing this before my exam
UNITED STATES


ryo 9/10/2023 2:27:00 PM

very helpful
MEXICO


Jamshed 6/20/2023 4:32:00 AM

i need this exam
PAKISTAN


Roberto Capra 6/14/2023 12:04:00 PM

nice questions... are these questions the same of the exam?
Anonymous


Synt 5/23/2023 9:33:00 PM

need to view
UNITED STATES


Vey 5/27/2023 12:06:00 AM

highly appreciate for your sharing.
CAMBODIA


Tshepang 8/18/2023 4:41:00 AM

kindly share this dump. thank you
Anonymous


Jay 9/26/2023 8:00:00 AM

link plz for download
UNITED STATES


Leo 10/30/2023 1:11:00 PM

data quality oecd
Anonymous


Blessious Phiri 8/13/2023 9:35:00 AM

rman is one good recovery technology
Anonymous


DiligentSam 9/30/2023 10:26:00 AM

need it thx
Anonymous


Vani 8/10/2023 8:11:00 PM

good questions
NEW ZEALAND


Fares 9/11/2023 5:00:00 AM

good one nice revision
Anonymous


Lingaraj 10/26/2023 1:27:00 AM

i love this thank you i need
Anonymous


Muhammad Rawish Siddiqui 12/5/2023 12:38:00 PM

question # 142: data governance is not one of the deliverables in the document and content management context diagram.
SAUDI ARABIA


al 6/7/2023 10:25:00 AM

most answers not correct here
Anonymous


Bano 1/19/2024 2:29:00 AM

what % of questions do we get in the real exam?
UNITED STATES


Oliviajames 10/25/2023 5:31:00 AM

i just want to tell you. i took my microsoft az-104 exam and passed it. your program was awesome. i especially liked your detailed questions and answers and practice tests that made me well-prepared for the exam. thanks to this website!!!
UNITED STATES


Divya 8/27/2023 12:31:00 PM

all the best
UNITED STATES


KY 1/1/2024 11:01:00 PM

very usefull document
Anonymous


Arun 9/20/2023 4:52:00 PM

nice and helpful questions
INDIA


Joseph J 7/11/2023 2:53:00 PM

i found the questions helpful
UNITED STATES


Meg 10/12/2023 8:02:00 AM

q 105 . ans is d
INDIA


Navaneeth S 7/14/2023 7:57:00 AM

i have interest to get a sybase iq dba certification
UNITED STATES


Aish 10/11/2023 5:27:00 AM

want to pass exm.
INDIA


Anonymous 6/12/2023 7:23:00 AM

are the answers correct?
INDIA


Kris 7/7/2023 9:43:00 AM

good morning, could you please upload this exam again, i need it to test my knowledge in sd-wan with version 7.0.
Anonymous


Meghraj mali 10/7/2023 1:47:00 PM

very nice question
CANADA


Noel 11/1/2022 9:14:00 PM

i have learning disability and this exam dumps allowed me to focus on the actual questions and not worry about notes and the those other study materials.
SOUTH AFRICA


Jas 10/25/2023 6:01:00 PM

165 should be apt
UNITED STATES


Neetu 6/22/2023 8:41:00 AM

please upload the dumps, real need of them
Anonymous


Mark 10/24/2023 1:34:00 AM

any recent feeedback?
UNITED STATES


Gopinadh 8/9/2023 4:05:00 AM

question number 2 is indicating you are giving proper questions. observe and change properly.
Anonymous


Santhi 1/1/2024 8:23:00 AM

passed today.40% questions were new.litwere case study,lots of new questions on afd,ratelimit,tm,lb,app gatway.got 2 set series of questions which are not present here.questions on azure cyclecloud, no.of vnet/vms required for implimentation,blueprints assignment/management group etc
INDIA