One drawback of business process reengineering BPR), sometimes referred to as business process analysis, is:

  1. Improved efficiency in the business processes analyzed.
  2. Excess of cast over the benefit.
  3. Reduction of operational efficiency.
  4. Employee resistance to change.

Answer(s): D

Explanation:

Business process reengineering BPR), or business process analysis, involves process innovation and process redesign. Instead of improving existing procedures, it finds new ways of doing things. One major drawback of BPR is that employees may be resistant due to fear of layoffs, being replaced, or insecurity about new required skills or tasks that the employee now has to perform.



Heniser Pet Foods manufactures two products, X. and Y. The unit contribution margins for
Products X. and Y are US $30 and US $50, respectively. Each product uses Materials A and

  1. Product uses 6 pounds of Material A and 12 pounds of Material B. Product Y uses 12 pounds of Material A and 8 pounds of Material B. The company can purchase only 1,200 pounds of Material A and 1,760 pounds of Material B. The optimal mix of products to manufacture is:
  2. 146 units of and 0 units of Y.
  3. 0 units of X and 100 units of Y.
  4. 120 units of and 40 units of Y.
  5. 40 units of X. and 120 units of Y.

Answer(s): C

Explanation:

Linear programming is a technique used to maximize a contribution margin function or to minimize a cost function, subject to constraints such as scarce resources or minimum/maximum levels of production. Thus, linear programming is often used for planning resource allocations. In this problem, the equation to be maximized, called the objective function, is: U3 $30)K+ $50Y. This equation is to be maximized subject to the constraints on materials. The two constraint functions are:
Material A: 6X + 12Y < 1,200
Material B: I 2X + 8Y < 1,760
One way to solve this problem is to graph the constraint lines and determine the feasible area. The optimal production level is at an extreme point within the feasible area. The graph shows that a production level of 120 units of and 40 units of Y is a feasible production level that maximizes the contribution margin.



Dale has 20 days to complete production of an order for an important customer. The customer wants 96 units of product that may be painted either red or white. The red units can be produced at a rate of 4 per day. The white units, because of a different quality of paint, can be produced at a rate of 7 per day. The materials for the red units cost US $80 each, while the white units cost US $120 each. Dale wants to keep costs at a minimum.
What is the constraint that expresses the number of units to be produced?

  1. 4R + 7W = 20
  2. R 4) + W = 7) <20
  3. R + W = 20
  4. 4R + 7W = 96

Answer(s): B

Explanation:

The constraint function that expresses the number of units to be produced is R + W = --I 96, but that is not one of the answer choices. Another constraint is that the total quantities of red R) and white W) units must be produced in 20 or fewer days at a rate of 4 red units per day and 7 white units per day. Thus, the time constraint is R - 4) + W - 7) 20.



The data below were gathered on two different machine centers and two products.

Which item below would be part of a linear programming formulation of this problem?

  1. Maximize: Contribution > 4A + 5B.
  2. Subject to: A < O.
  3. Subject to: 2.5A + 4B < 60.
  4. Subject to: 4A + 5B < 130.

Answer(s): C

Explanation:

The linear programming solution is subject to constraints on the availability of machine hours in both centers. For example, products A and B require 2.5 and 4 hours per unit, respectively, in Machine Center 1, but only 60 hours are available. Hence, the optimal production of A and B to the following constraint:
2.5 A + 4B < 60



A firm must decide the mix of production of Product X and Product Y. There are only two resources used in the two products, resources A and B. Data related to the two products is given in the following table:


What is the appropriate objective function to maximize profit?

  1. 3X + 7Y
  2. 2X+Y
  3. 8X + 6Y
  4. 5X + 8Y

Answer(s): C

Explanation:

The objective function is the function to be optimized. This firm wishes to maximize profits on the sales of two products X and Y). Based on profits per unit US $8 and US $6, respectively), the objective function is 8X + 6Y.



Share your comments for Financial CIA-III exam with other users:

R
RITEISH
12/24/2023 4:33:00 AM

thanks for the exact solution

S
SB
10/15/2023 7:58:00 AM

need to refer the questions and have to give the exam

M
Mike Derfalem
7/16/2023 7:59:00 PM

i need it right now if it was possible please

I
Isak
7/6/2023 3:21:00 AM

i need it very much please share it in the fastest time.

M
Maria
6/23/2023 11:40:00 AM

correct answer is d for student.java program

N
Nagendra Pedipina
7/12/2023 9:10:00 AM

q:37 c is correct

J
John
9/16/2023 9:37:00 PM

q6 exam topic: terramearth, c: correct answer: copy 1petabyte to encrypted usb device ???

S
SAM
12/4/2023 12:56:00 AM

explained answers

A
Andy
12/26/2023 9:35:00 PM

plan to take theaws certified developer - associate dva-c02 in the next few weeks

S
siva
5/17/2023 12:32:00 AM

very helpfull

M
mouna
9/27/2023 8:53:00 AM

good questions

B
Bhavya
9/12/2023 7:18:00 AM

help to practice csa exam

M
Malik
9/28/2023 1:09:00 PM

nice tip and well documented

R
rodrigo
6/22/2023 7:55:00 AM

i need the exam

D
Dan
6/29/2023 1:53:00 PM

please upload

A
Ale M
11/22/2023 6:38:00 PM

prepping for fsc exam

A
ahmad hassan
9/6/2023 3:26:00 AM

pd1 with great experience

Ž
Žarko
9/5/2023 3:35:00 AM

@t it seems like azure service bus message quesues could be the best solution

S
Shiji
10/15/2023 1:08:00 PM

helpful to check your understanding.

D
Da Costa
8/27/2023 11:43:00 AM

question 128 the answer should be static not auto

B
bot
7/26/2023 6:45:00 PM

more comments here

K
Kaleemullah
12/31/2023 1:35:00 AM

great support to appear for exams

B
Bsmaind
8/20/2023 9:26:00 AM

useful dumps

B
Blessious Phiri
8/13/2023 8:37:00 AM

making progress

N
Nabla
9/17/2023 10:20:00 AM

q31 answer should be d i think

V
vladputin
7/20/2023 5:00:00 AM

is this real?

N
Nick W
9/29/2023 7:32:00 AM

q10: c and f are also true. q11: this is outdated. you no longer need ownership on a pipe to operate it

N
Naveed
8/28/2023 2:48:00 AM

good questions with simple explanation

C
cert
9/24/2023 4:53:00 PM

admin guide (windows) respond to malicious causality chains. when the cortex xdr agent identifies a remote network connection that attempts to perform malicious activity—such as encrypting endpoint files—the agent can automatically block the ip address to close all existing communication and block new connections from this ip address to the endpoint. when cortex xdrblocks an ip address per endpoint, that address remains blocked throughout all agent profiles and policies, including any host-firewall policy rules. you can view the list of all blocked ip addresses per endpoint from the action center, as well as unblock them to re-enable communication as appropriate. this module is supported with cortex xdr agent 7.3.0 and later. select the action mode to take when the cortex xdr agent detects remote malicious causality chains: enabled (default)—terminate connection and block ip address of the remote connection. disabled—do not block remote ip addresses. to allow specific and known s

Y
Yves
8/29/2023 8:46:00 PM

very inciting

M
Miguel
10/16/2023 11:18:00 AM

question 5, it seems a instead of d, because: - care plan = case - patient = person account - product = product2;

B
Byset
9/25/2023 12:49:00 AM

it look like real one

D
Debabrata Das
8/28/2023 8:42:00 AM

i am taking oracle fcc certification test next two days, pls share question dumps

N
nITA KALE
8/22/2023 1:57:00 AM

i need dumps

AI Tutor 👋 I’m here to help!