Assume that additional workers are hired for the bottleneck operation to expedite setups and materials handling. The cost of the additional workers is US $50,000 per year. As a result, the annual output of the bottleneck operation will increase by 500 units. The change in operating income attributable to the increase in workers is:

  1. US $50,000
  2. US $36,000
  3. US $ 14,000)
  4. US $ 20,000)

Answer(s): C

Explanation:

Operation 2 is the bottleneck because it is functioning at its capacity. The incremental annual throughput contribution revenues -- direct materials costs) from adding workers to Operation 2 is US $36,000 [500 units x $120 unit price -- $48 DPI per unit)]. Because the cost of the additional workers is US $50,000, the change in operating income is US $ 14,000). This information is relevant to a theory of constraints TOG) analysis. A manufacturer that can sell all of its output produces its sole product using three operations. Each unit sells for US $120, and direct materials costing US $48 per unit are added at the start of the first operation. Other variable costs are immaterial. The fallowing annual cost and capacity information is available concerning those operations:



Assume that C Company offers to perform the operation 2 function on 1,000 units at a unit price of US $40, excluding direct materials cast. Also assume that Y Company offers to perform the Operation 1 function an 1,000 units at a unit price of US $7, excluding direct materials cost.
Which of these mutually exclusive offers is acceptable?

  1. C but not Y.
  2. Y but not C.
  3. X or Y.
  4. Neither offer should be accepted.

Answer(s): A

Explanation:

KG's offer should be accepted because its cast is US $40,000 1,000 units x $40), but the increase in throughput contribution is US $72,000 [1,000 units $120 unit price -- $48 E' 1 per unit)]. Hence, the relevant cost of QC's offer is less than the incremental throughput contribution. ms's offer effectively increases the capacity of the bottleneck operation. Y's offer should be rejected because, even though its US $7 unit price is less than the US $8 unit operating cost excluding direct materials) for Operation 1. it will result in the incurrence of additional casts with no increase in throughput contribution, given that Operation 2 is already producing at its 150,000-unit capacity.



Company J produces two components: A-1 and A-2. The unit throughput contribution margins for A-1 and A-2 are US $150 and US $300, respectively. Each component must proceed through two processes: Operation 1 and Operation 2. The capacity of Operation 1 is 180 machine hours, with A-1 and A-2 requiring 1 hour and 3 hours, respectively.
Furthermore, Company J can sell only 45 units of A-1 and 100 units of A-2. However,
Company J is considering expanding Operation 1's capacity by 90 machine hours at a cost of US $80 per hour. Assuming that Operation 2 has sufficient capacity to handle any additional output from Operation 1, how much should Company J produce?

  1. Option A
  2. Option C
  3. Option C
  4. Option D

Answer(s): C

Explanation:

A-1's throughput contribution margin per unit of the scarce resource the internal binding constraint) is US $150 $150 UCM - 1 machining hour). A-2's throughput contribution margin per unit of the scarce resource is U $100 $300 UCM - 3 machine hours).
Consequently, Company J should produce as much A-1 as it can sell 45 units). If Company adds 90 machine hours to increase the capacity of Operation -I to 270 hours 180 + 90), it cannot produce additional units of A-1 because the external binding constraint has not been relaxed. However, it can produce additional units of A-2. Given that the UCM per machine hour of A-2 is U $100 and that the cost is US $80 per hour, adding capacity to Operation 1 is profitable. Thus, Company J should use 45 machine hours to produce 45 units of A-1. The remaining 225 machine hours 270 - 45) should be used to produce 75 units 225 - 3 hours) of A-2. The latter amount is within the external binding constraint. A company produces two products, and Y, which use material and labor as inputs. Fixed amounts of labor and material are available for production each month In addition. the demand for product Y each month is limited: product has no constraint an the number of units that can be sold. A graphical depiction of these production and demand constraints is presented in the opposite column.



The feasible solution region is bounded by the lines connecting points:

  1. 3, 4, 6, and 7.
  2. I, 5, 6, and 8.
  3. 2, 4, , , and 8.
  4. 3, E. 6, and 7.

Answer(s): A

Explanation:

A model consisting of a system of functions may be used to optimize an objective function. If the functions in the model are all linear, the model is a linear programming model. Linear programming is a technique to determine optimal resource allocation. Several solution methods are available to solve linear programming problems. The graphical method, the easiest technique, is limited to simple problems. Here, the graph consists of three lines, each representing a production constraint. The lines connecting points , 4, 6, and 7 bound the feasible solution region. Product mikes of and Y that lie outside this boundary cannot be produced and/or sold because the demand constraint line ,4), the labor constraint line 4,6), and the material constraint line 6,7) are binding. A company produces two products, and Y, which use material and labor as inputs. Fixed amounts of labor and material are available for production each month In addition. the demand for product Y each month is limited: product has no constraint an the number of units that can be sold. A graphical depiction of these production and demand constraints is presented in the opposite column.



If a series of profit lines for and Y are drawn on the graph, the mix of G and Y that will result in the maximum profit can be determined from:

  1. The last point in the feasible solution region touched by a profit line.
  2. Any point on the boundary of the feasible solution region touched by a profit line.
  3. The first paint an the feasible solution region boundary that intersects a profit line.
  4. Any point on the demand constraint that intersects a profit line.

Answer(s): A

Explanation:

A profit line has negative slope because the profit from sales of one product increases as the profit from sales of the other product declines. Moving the profit line rightward while maintaining its slope) to the last paint in the feasible region determines the solution.



Share your comments for Financial CIA-III-2012 exam with other users:

E
Eman Sawalha
6/10/2023 6:09:00 AM

it is an exam that measures your understanding of cloud computing resources provided by aws. these resources are aligned under 6 categories: storage, compute, database, infrastructure, pricing and network. with all of the services and typees of services under each category

M
Mars
11/16/2023 1:53:00 AM

good and very useful

R
ronaldo7
10/24/2023 5:34:00 AM

i cleared the az-104 exam by scoring 930/1000 on the exam. it was all possible due to this platform as it provides premium quality service. thank you!

P
Palash Ghosh
9/11/2023 8:30:00 AM

easy questions

N
Noor
10/2/2023 7:48:00 AM

could you please upload ad0-127 dumps

K
Kotesh
7/27/2023 2:30:00 AM

good content

B
Biswa
11/20/2023 9:07:00 AM

understanding about joins

J
Jimmy Lopez
8/25/2023 10:19:00 AM

please upload oracle cloud infrastructure 2023 foundations associate exam braindumps. thank you.

L
Lily
4/24/2023 10:50:00 PM

questions made studying easy and enjoyable, passed on the first try!

J
John
8/7/2023 12:12:00 AM

has anyone recently attended safe 6.0 exam? did you see any questions from here?

B
Big Dog
6/24/2023 4:47:00 PM

question 13 should be dhcp option 43, right?

B
B.Khan
4/19/2022 9:43:00 PM

the buy 1 get 1 is a great deal. so far i have only gone over exam. it looks promissing. i report back once i write my exam.

G
Ganesh
12/24/2023 11:56:00 PM

is this dump good

A
Albin
10/13/2023 12:37:00 AM

good ................

P
Passed
1/16/2022 9:40:00 AM

passed

H
Harsh
6/12/2023 1:43:00 PM

yes going good

S
Salesforce consultant
1/2/2024 1:32:00 PM

good questions for practice

R
Ridima
9/12/2023 4:18:00 AM

need dump and sap notes for c_s4cpr_2308 - sap certified application associate - sap s/4hana cloud, public edition - sourcing and procurement

T
Tanvi Rajput
10/6/2023 6:50:00 AM

question 11: d i personally feel some answers are wrong.

A
Anil
7/18/2023 9:38:00 AM

nice questions

C
Chris
8/26/2023 1:10:00 AM

looking for c1000-158: ibm cloud technical advocate v4 questions

S
sachin
6/27/2023 1:22:00 PM

can you share the pdf

B
Blessious Phiri
8/13/2023 10:26:00 AM

admin ii is real technical stuff

L
Luis Manuel
7/13/2023 9:30:00 PM

could you post the link

V
vijendra
8/18/2023 7:54:00 AM

hello send me dumps

S
Simeneh
7/9/2023 8:46:00 AM

it is very nice

J
john
11/16/2023 5:13:00 PM

i gave the amazon dva-c02 tests today and passed. very helpful.

T
Tao
11/20/2023 8:53:00 AM

there is an incorrect word in the problem statement. for example, in question 1, there is the word "speci c". this is "specific. in the other question, there is the word "noti cation". this is "notification. these mistakes make this site difficult for me to use.

P
patricks
10/24/2023 6:02:00 AM

passed my az-120 certification exam today with 90% marks. studied using the dumps highly recommended to all.

A
Ananya
9/14/2023 5:17:00 AM

i need it, plz make it available

J
JM
12/19/2023 2:41:00 PM

q47: intrusion prevention system is the correct answer, not patch management. by definition, there are no patches available for a zero-day vulnerability. the way to prevent an attacker from exploiting a zero-day vulnerability is to use an ips.

R
Ronke
8/18/2023 10:39:00 AM

this is simple but tiugh as well

C
CesarPA
7/12/2023 10:36:00 PM

questão 4, segundo meu compilador local e o site https://www.jdoodle.com/online-java-compiler/, a resposta correta é "c" !

J
Jeya
9/13/2023 7:50:00 AM

its very useful

AI Tutor 👋 I’m here to help!