F5 101 Exam (page: 16)
F5 Application Delivery Fundamentals Exam
Updated on: 15-Feb-2026

Viewing Page 16 of 93

Administrators can configure which three of the following load balancing options in GTM? (Choose three.)

  1. Alternate
  2. Fallback
  3. Required
  4. Preferred
  5. Backup
  6. Optional

Answer(s): A,B,D



Over the years, F5 has led the industry in which of the four following areas? (Choose three.)

  1. Security
  2. Acceleration
  3. Application availability
  4. Application scalability
  5. Application design
  6. Remote access

Answer(s): A,B,D



Which of the following is NOT a method that TMOS uses to improve the performance of applications?

  1. Caching HTTP data
  2. Optimizing the TCP connection between the client and the BIG-IP device
  3. Offloading SSL decryption from downstream servers
  4. Discarding unnecessary data from server responses before sending to the client
  5. Compressing HTTP data

Answer(s): D



The drawback to having BIG-IP act as a full application proxy is the decrease in application performance.

  1. True
  2. False

Answer(s): B



CSRF is difficult to detect because:

  1. The attacks are requests a user should be allowed to make
  2. The attacks always utilize obfuscation
  3. The attacks are always encrypted
  4. All of the above

Answer(s): A



Viewing Page 16 of 93



Share your comments for F5 101 exam with other users:

nITA KALE 8/22/2023 1:57:00 AM

i need dumps
Anonymous


Karan 5/17/2023 4:26:00 AM

need this dump
Anonymous