Avixa CTS Exam (page: 3)
Avixa Certified Technology Specialist
Updated on: 24-Mar-2026

Viewing Page 3 of 33

[Operating AV Systems]
Maintaining AV operations includes which of the following?

  1. conforming to DISCAS
  2. measuring system SPL
  3. updating control system firmware
  4. comparing NAG and PAG calculations

Answer(s): C



[Developing AV Solutions]
How frequently should a personal fall arrest harness be inspected?

  1. weekly
  2. before each use
  3. at the beginning of each project
  4. at the beginning of each work day

Answer(s): B



[Developing AV Solutions]
When discussing a proposed audiovisual project with a new customer, it is important for the salesperson to FIRST

  1. conduct a survey of end users to determine the project goals.
  2. prepare a detailed layout of the equipment and cabling requirements.
  3. identify the key decision makers and stakeholders in the client's organization.
  4. consult with the project manager to determine the availability of staff to complete the installation.

Answer(s): C



[Developing AV Solutions]
Project documentation states the system must logically Isolate control and media networks.
What piece of network equipment should be used?

  1. router
  2. access point
  3. managed switch
  4. unmanaged switch

Answer(s): C



[Conducting AV Management Activities]
To help end users remember key points of the training, the training documentation should include

  1. equipment datasheets.
  2. a customized quick start guide.
  3. user manuals for each piece of equipment.
  4. instructions for maintaining system input devices.

Answer(s): B



[Developing AV Solutions]
When an audio device can no longer accurately reproduce the audio signal, It is called

  1. feedback.
  2. dithering.
  3. distortion.
  4. saturation.

Answer(s): C



[Developing AV Solutions]
Which kind of drawing should a technician refer to in order to determine how to hang a loudspeaker line array?

  1. detail
  2. section
  3. elevation
  4. reflected ceiling plan

Answer(s): B



[Conducting a Needs Assessment]
During the site survey, the client indicates that the space that will become a rear projection room is currently an off-white color.
What should be recommended to the client?

  1. paint the room gray
  2. paint the room black
  3. leave the room as it is
  4. use carpeting on the walls

Answer(s): B



Viewing Page 3 of 33



Share your comments for Avixa CTS exam with other users:

pepe el toro 9/12/2023 7:55:00 PM

this is so interesting
Anonymous


Antony 11/28/2023 12:13:00 AM

great material thanks
AUSTRALIA


Thembelani 5/30/2023 2:22:00 AM

anyone who wrote this exam recently
Anonymous


P 9/16/2023 1:27:00 AM

ok they re good
Anonymous


Jorn 7/13/2023 5:05:00 AM

relevant questions
UNITED KINGDOM


AM 6/20/2023 7:54:00 PM

please post
UNITED STATES


Nagendra Pedipina 7/13/2023 2:22:00 AM

q:42 there has to be a image in the question to choose what does it mean from the options
INDIA


BrainDumpee 11/18/2023 1:36:00 PM

looking for cphq dumps, where can i find these for free? please and thank you.
UNITED STATES


sheik 10/14/2023 11:37:00 AM

@aarun , thanks for the information. it would be great help if you share your email
Anonymous


Random user 12/11/2023 1:34:00 AM

1z0-1078-23 need this dumps
Anonymous


labuschanka 11/16/2023 6:06:00 PM

i gave the microsoft azure az-500 tests and prepared from this site as it has latest mock tests available which helped me evaluate my performance and score 919/1000
Anonymous


Marianne 10/22/2023 11:57:00 PM

i cannot see the button to go to the questions
Anonymous


sushant 6/28/2023 4:52:00 AM

good questions
EUROPEAN UNION


A\MAM 6/27/2023 5:17:00 PM

q-6 ans-b correct. https://docs.paloaltonetworks.com/pan-os/9-1/pan-os-cli-quick-start/use-the-cli/commit-configuration-changes
UNITED STATES


unanimous 12/15/2023 6:38:00 AM

very nice very nice
Anonymous


akminocha 9/28/2023 10:36:00 AM

please help us with 1z0-1107-2 dumps
INDIA


Jefi 9/4/2023 8:15:00 AM

please upload the practice questions
Anonymous


Thembelani 5/30/2023 2:45:00 AM

need this dumps
Anonymous


Abduraimov 4/19/2023 12:43:00 AM

preparing for this exam is overwhelming. you cannot pass without the help of these exam dumps.
UNITED KINGDOM


Puneeth 10/5/2023 2:06:00 AM

new to this site but i feel it is good
EUROPEAN UNION


Ashok Kumar 1/2/2024 6:53:00 AM

the correct answer to q8 is b. explanation since the mule app has a dependency, it is necessary to include project modules and dependencies to make sure the app will run successfully on the runtime on any other machine. source code of the component that the mule app is dependent of does not need to be included in the exported jar file, because the source code is not being used while executing an app. compiled code is being used instead.
Anonymous


Merry 7/30/2023 6:57:00 AM

good questions
Anonymous


VoiceofMidnight 12/17/2023 4:07:00 PM

Delayed the exam until December 29th.
UNITED STATES


Umar Ali 8/29/2023 2:59:00 PM

A and D are True
Anonymous


vel 8/28/2023 9:17:09 AM

good one with explanation
Anonymous


Gurdeep 1/18/2024 4:00:15 PM

This is one of the most useful study guides I have ever used.
CANADA