When connecting a condenser microphone, what MUST be included in die system design for it to operate?

  1. mixer
  2. stand
  3. transmitter
  4. power source

Answer(s): D



[Developing AV Solutions]
When creating an estimate for a request for proposal (RFP), what is the FIRST tiling that should be done?

  1. obtain the costs
  2. create the submittal
  3. schedule a site visit
  4. read the project description

Answer(s): D



[Developing AV Solutions]
Network Quality of Service (QoS) is defined as

  1. the ability to prioritize the traffic in the network system.
  2. the ability to set the quantity of stations connected via the network.
  3. the ability to remotely manage network switches, routers and hubs via the network connection.
  4. a feature allowing the network administrator to monitor who is connected to the network at any given time.

Answer(s): A



[Developing AV Solutions]
A saeen is 144 in (3658 mm) wide and the throw ratio is 2.3:1. How far from the screen should the projector be placed?

  1. 288 In (7303 mm)
  2. 302 in (7681 mm)
  3. 331 in (8413 mm)
  4. 446 in (11339 mm)

Answer(s): C



[Developing AV Solutions]

Which method of control is supported by HDBaseT?

  1. PCIE
  2. DAU
  3. RS-232
  4. DMX512

Answer(s): C



[Developing AV Solutions]
During project delivery and after completion, it is important to ensure correct management of control system code so that

  1. programming costs will be within project budget.
  2. other contractors are unable to reuse or edit code.
  3. the most up-to-date version of code is available for upload when required.
  4. sub-contract programmers submit uncompiled code as per their contract of employment.

Answer(s): C



[Developing AV Solutions]
Assuming a 10' (3 m) ceiling, what is the approximate volume of this room?

  1. 300 cubic ft (8.5 m3)
  2. 600 cubic ft (17 m3)
  3. 1500 cubic ft (42.5 m3) o
  4. 6000 cubic ft (162 m3)

Answer(s): D



[Developing AV Solutions]
The BEST way to ensure that a project is on budget is to

  1. calculate the number of calendars days remaining to completion.
  2. visit the job site and determine the percentage of work completed.
  3. ask the installation team to estimate remaining work to completion.
  4. review accrued labor and material costs against remaining work.

Answer(s): D



Viewing Page 2 of 33



Share your comments for Avixa CTS exam with other users:

mohamed 9/12/2023 5:26:00 AM

good one thanks
EGYPT


Mfc 10/23/2023 3:35:00 PM

only got thru 5 questions, need more to evaluate
Anonymous


Whizzle 7/24/2023 6:19:00 AM

q26 should be b
Anonymous


sarra 1/17/2024 3:44:00 AM

the aaa triad in information security is authentication, accounting and authorisation so the answer should be d 1, 3 and 5.
UNITED KINGDOM


DBS 5/14/2023 12:56:00 PM

need to attend this
UNITED STATES


Da_costa 8/1/2023 5:28:00 PM

these are free brain dumps i understand, how can one get free pdf
Anonymous


vikas 10/28/2023 6:57:00 AM

provide access
EUROPEAN UNION


Abdullah 9/29/2023 2:06:00 AM

good morning
Anonymous


Raj 6/26/2023 3:12:00 PM

please upload the ncp-mci 6.5 dumps, really need to practice this one. thanks guys
Anonymous


Miguel 10/5/2023 12:21:00 PM

question 16: https://help.salesforce.com/s/articleview?id=sf.care_console_overview.htm&type=5
SPAIN


Hiren Ladva 7/8/2023 10:34:00 PM

yes i m prepared exam
Anonymous


oliverjames 10/24/2023 5:37:00 AM

my experience was great with this site as i studied for the ms-900 from here and got 900/1000 on the test. my main focus was on the tutorials which were provided and practice questions. thanks!
GERMANY


Bhuddhiman 7/20/2023 11:52:00 AM

great course
UNITED STATES


Anuj 1/14/2024 4:07:00 PM

very good question
Anonymous


Saravana Kumar TS 12/8/2023 9:49:00 AM

question: 93 which statement is true regarding the result? sales contain 6 columns and values contain 7 columns so c is not right answer.
INDIA


Lue 3/30/2023 11:43:00 PM

highly recommend just passed my exam.
CANADA


DC 1/7/2024 10:17:00 AM

great practice! thanks
UNITED STATES


Anonymus 11/9/2023 5:41:00 AM

anyone who wrote this exam recently?
SOUTH AFRICA


Khalid Javid 11/17/2023 3:46:00 PM

kindly share the dump
Anonymous


Na 8/9/2023 8:39:00 AM

could you please upload cfe fraud prevention and deterrence questions? it will be very much helpful.
Anonymous


shime 10/23/2023 10:03:00 AM

this is really very very helpful for mcd level 1
ETHIOPIA


Vnu 6/3/2023 2:39:00 AM

very helpful!
Anonymous


Steve 8/17/2023 2:19:00 PM

question #18s answer should be a, not d. this should be corrected. it should be minvalidityperiod
CANADA


RITEISH 12/24/2023 4:33:00 AM

thanks for the exact solution
Anonymous


SB 10/15/2023 7:58:00 AM

need to refer the questions and have to give the exam
INDIA


Mike Derfalem 7/16/2023 7:59:00 PM

i need it right now if it was possible please
Anonymous


Isak 7/6/2023 3:21:00 AM

i need it very much please share it in the fastest time.
Anonymous


Maria 6/23/2023 11:40:00 AM

correct answer is d for student.java program
IRELAND


Nagendra Pedipina 7/12/2023 9:10:00 AM

q:37 c is correct
INDIA


John 9/16/2023 9:37:00 PM

q6 exam topic: terramearth, c: correct answer: copy 1petabyte to encrypted usb device ???
GERMANY


SAM 12/4/2023 12:56:00 AM

explained answers
INDIA


Andy 12/26/2023 9:35:00 PM

plan to take theaws certified developer - associate dva-c02 in the next few weeks
SINGAPORE


siva 5/17/2023 12:32:00 AM

very helpfull
Anonymous


mouna 9/27/2023 8:53:00 AM

good questions
Anonymous