As part of a new VMware Cloud Foundation (VCF) deployment, a customer is planning to implement vSphere IaaS control plane. What component could be installed and enabled to implement the solution?
Answer(s): A
The vSphere IaaS (Infrastructure-as-a-Service) control plane in VCF 5.2 enables self-service provisioning and automation of virtualized resources, integrating with vSphere's Supervisor Cluster for cloud-like functionality. Option A, "Aria Automation" (formerly vRealize Automation), is the correct component, providing orchestration, cloud templates, and self-service portals to manage IaaS workloads in VCF. It integrates with vSphere and NSX to deliver this capability. Option B, "NSX Edge networking," focuses on networking, not IaaS control. Option C, "Storage DRS," optimizes storage but isn't a control plane. Option D, "Aria Operations," is for monitoring, not provisioning. VMware's documentation confirms Aria Automation's role in VCF IaaS.
VMware Cloud Foundation 5.2 Architekt Study Guide, Chapter 6: Automation andOrchestration; VMware Aria Automation 8.10 Product Documentation, vSphere IaaS Integration.
An architect is preparing a VI Workload Domain design with a dedicated NSX instance. The workload domain is planned to grow up to 300 ESXi hosts within the next six months. Which is the minimum NSX Manager form factor that should be recommended by the architect for this VI Workload Domain to support the forecasted growth?
NSX Manager in VCF 5.2 comes in form factors (Small, Medium, Large) with capacity limits based on managed objects (hosts, VMs, etc.). A VI Workload Domain with a dedicated NSX instance growing to 300 ESXi hosts requires a form factor supporting this scale. Per NSX-T 3.2 sizing guidelines (used in VCF 5.2), the Large form factor supports up to 1,024 hosts, 12,000 VMs, and extensive networking objects, making it suitable for 300 hosts and future growth. Medium supports up to 256 hosts, which is close but risks being exceeded with additional VMs or objects. Small (64 hosts) and Extra Small (lab use) are insufficient. The architect must recommend "Large" (A) to ensure scalability and performance for this VI domain.
NSX-T 3.2 Reference Design Guide (VCF 5.2 compatible), Section on NSX Manager Sizing; VMware Cloud Foundation 5.2 Deployment Guide, Workload Domain Sizing.
A customer is deploying VCF at a new datacenter location. They will migrate their workloads from the existing datacenter to the new VCF platform over six months. Both datacenters will run simultaneously for six months during the migration. Which of the following should be a documented risk?
In VCF design, risks are potential issues that could jeopardize project success, documented to prompt mitigation planning. Option A, "Six months may not be enough time to complete the migration," is a valid risk because workload migration complexity (e.g., application dependencies, data volume, testing) could exceed the timeline, a common challenge in VCF deployments. Option B (connectivity) is a fact, not a risk, unless qualified as unreliable. Option C (sufficient bandwidth) is an assumption or requirement, not a risk unless proven inadequate. Option D (powering off workloads) is a design choice, not an inherent risk without evidence. VCF migration planning emphasizes timeline risks, making A the best choice.
VMware Cloud Foundation 5.2 Planning and Preparation Guide, Chapter 5: Risk Assessment; VMware Migration Best Practices for VCF.
An architect had gathered the following requirements and constraints for a VMware Cloud Foundation (VCF) deployment.Requirements:* User interface (UI) SSL certificates must have a maximum validity of 6 months.* Have the least possible administrative time to install and renew certificates.* Each certificate must be created on a per VCF component basis.Constraints:* Limited administrative skillsets on SSL certificate administration* Limited operational expenditure budget for SSL certificatesWhich design decision should be made to satisfy the stated requirement(s) and constraint(s)?
Answer(s): D
The requirements demand per-component certificates with 6-month validity and minimal admin effort, while constraints limit skills and budget. Option D, "Use and configure integration with Microsoft Certificate Authority (CA)," meets all criteria: Microsoft CA (integrated via SDDC Manager in VCF 5.2) supports individual certificates per component (e.g., vCenter, NSX), allows short validity periods, automates renewal (reducing effort), and leverages existing infrastructure (low cost, skill- friendly). Option A (wildcard certificates) violates per-component needs. Option B (DigiCert) incurs higher costs and requires more skill. Option C (disabling SSL) compromises security, failing compliance. Microsoft CA aligns with VCF's certificate management capabilities.
VMware Cloud Foundation 5.2 Administration Guide, Section on Certificate Management with Microsoft CA; VMware Validated Design 6.2, Certificate Authority Integration.
A design requirement has been specified for a new VMware Cloud Foundation (VCF) instance. All managed workload resources must be lifecycle managed with the following criteria:* Development resources must be automatically reclaimed after two weeks* Production resources will be reviewed yearly for reclamation* Resources identified for reclamation must allow time for review and possible extensionWhat capability will satisfy the requirements?
Answer(s): C
Lifecycle management of resources in VCF 5.2 involves automation tools like Aria Automation. Option C, "Aria Automation Lease Policy," allows setting expiration dates for resources (e.g., 2 weeks for dev, 1 year for prod), automatically reclaiming them unless extended during a review period, directly meeting all criteria. Option A (Aria Suite Lifecycle) manages software deployment, not resource lifecycles. Option B (Aria Operations Rightsizing) provides sizing insights, not reclamation automation. Option D (Project Membership) controls access, not lifecycles. Aria Automation's lease policies are designed for this exact purpose in VCF, integrating with cloud zones and projects.
VMware Aria Automation 8.10 Administration Guide, Section on Lease Policies; VMware Cloud Foundation 5.2 Architect Study Guide, Automation Features.
Share your comments for VMware 2V0-13.24 exam with other users:
question 16 should be b (changing the connector settings on the monitor) pc and monitor were powered on. the lights on the pc are on indicating power. the monitor is showing an error text indicating that it is receiving power too. this is a clear sign of having the wrong input selected on the monitor. thus, the "connector setting" needs to be switched from hdmi to display port on the monitor so it receives the signal from the pc, or the other way around (display port to hdmi).
q 10. ans is d (in the target org: open deployment settings, click edit next to the source org. select allow inbound changes and save
very useful
i purchased this exam dumps from another website with way more questions but they were all invalid and outdate. this exam dumps was right to the point and all from recent exam. it was a hard pass.
it was a good experience and i got 90% in the 200-901 exam.
hi please upload this
please upload it
really need this dump. can you please help.
really good and covers many areas explaining the answer.
yes, can you please upload the exam?
how many questions are there in these dumps?
hi team, please upload this , i need it.
question 14 - run terraform import: this is the recommended best practice for bringing manually created or destroyed resources under terraform management. you use terraform import to associate an existing resource with a terraform resource configuration. this ensures that terraform is aware of the resource, and you can subsequently manage it with terraform.
please upload dump. thanks in advance.
great great
answer 16 should be b your organizational policies require you to use virtual machines directly
the question are kind of tricky of you didnt get the hnag on it.
can anyone tell me if this is for rhel8 or rhel9?
good content
pdb and cdb are critical to the database
till 104 questions are free, lets see how it helps me in my exam today.
question # 56, answer is true not false.
i would be requiring dumps to prepare for certification exam
very helpful
control file is the heart of rman backup
hi could you please upload the ibm c2090-543 dumps
appriciate if you could upload this again
please upload the dump
i found some questions answers mismatch with explanation answers. please properly update
nothing to mention
knowable questions
very helpfull
good questions
its helpful
Keeping this site free takes real effort. We constantly battle automated scraping and unauthorized content copying. A quick account helps us protect the community and keep the site free.
To continue studying for your 2V0-13.24, please sign in or create a free account.