VMware Cloud Foundation 5.2 Architect 2V0-13.24 Dumps in PDF

Free VMware 2V0-13.24 Real Questions (page: 7)

As part of a new VMware Cloud Foundation (VCF) deployment, a customer is planning to implement vSphere IaaS control plane.
What component could be installed and enabled to implement the solution?

  1. Aria Automation
  2. NSX Edge networking
  3. Storage DRS
  4. Aria Operations

Answer(s): A

Explanation:

The vSphere IaaS (Infrastructure-as-a-Service) control plane in VCF 5.2 enables self-service provisioning and automation of virtualized resources, integrating with vSphere's Supervisor Cluster for cloud-like functionality. Option A, "Aria Automation" (formerly vRealize Automation), is the correct component, providing orchestration, cloud templates, and self-service portals to manage IaaS workloads in VCF. It integrates with vSphere and NSX to deliver this capability. Option B, "NSX Edge networking," focuses on networking, not IaaS control. Option C, "Storage DRS," optimizes storage but isn't a control plane. Option D, "Aria Operations," is for monitoring, not provisioning. VMware's documentation confirms Aria Automation's role in VCF IaaS.


Reference:

VMware Cloud Foundation 5.2 Architekt Study Guide, Chapter 6: Automation and

Orchestration; VMware Aria Automation 8.10 Product Documentation, vSphere IaaS Integration.



An architect is preparing a VI Workload Domain design with a dedicated NSX instance. The workload domain is planned to grow up to 300 ESXi hosts within the next six months.
Which is the minimum NSX Manager form factor that should be recommended by the architect for this VI Workload Domain to support the forecasted growth?

  1. Large
  2. Medium
  3. Extra Small
  4. Small

Answer(s): A

Explanation:

NSX Manager in VCF 5.2 comes in form factors (Small, Medium, Large) with capacity limits based on managed objects (hosts, VMs, etc.). A VI Workload Domain with a dedicated NSX instance growing to 300 ESXi hosts requires a form factor supporting this scale. Per NSX-T 3.2 sizing guidelines (used in VCF 5.2), the Large form factor supports up to 1,024 hosts, 12,000 VMs, and extensive networking objects, making it suitable for 300 hosts and future growth. Medium supports up to 256 hosts, which is close but risks being exceeded with additional VMs or objects. Small (64 hosts) and Extra Small (lab use) are insufficient. The architect must recommend "Large" (A) to ensure scalability and performance for this VI domain.


Reference:

NSX-T 3.2 Reference Design Guide (VCF 5.2 compatible), Section on NSX Manager Sizing; VMware Cloud Foundation 5.2 Deployment Guide, Workload Domain Sizing.



A customer is deploying VCF at a new datacenter location. They will migrate their workloads from the existing datacenter to the new VCF platform over six months. Both datacenters will run simultaneously for six months during the migration.
Which of the following should be a documented risk?

  1. Six months may not be enough time to complete the migration.
  2. There will be connectivity between the two locations.
  3. Bandwidth between the two locations is sufficient to accommodate the workload migration.
  4. Workloads will be powered off during migration.

Answer(s): A

Explanation:

In VCF design, risks are potential issues that could jeopardize project success, documented to prompt mitigation planning. Option A, "Six months may not be enough time to complete the migration," is a valid risk because workload migration complexity (e.g., application dependencies, data volume, testing) could exceed the timeline, a common challenge in VCF deployments. Option B (connectivity) is a fact, not a risk, unless qualified as unreliable. Option C (sufficient bandwidth) is an assumption or requirement, not a risk unless proven inadequate. Option D (powering off workloads) is a design choice, not an inherent risk without evidence. VCF migration planning emphasizes timeline risks, making A the best choice.


Reference:

VMware Cloud Foundation 5.2 Planning and Preparation Guide, Chapter 5: Risk Assessment; VMware Migration Best Practices for VCF.



An architect had gathered the following requirements and constraints for a VMware Cloud Foundation (VCF) deployment.

Requirements:

* User interface (UI) SSL certificates must have a maximum validity of 6 months.

* Have the least possible administrative time to install and renew certificates.

* Each certificate must be created on a per VCF component basis.

Constraints:

* Limited administrative skillsets on SSL certificate administration

* Limited operational expenditure budget for SSL certificates

Which design decision should be made to satisfy the stated requirement(s) and constraint(s)?

  1. Use wildcard certificates
  2. Use and configure integration with a certificate vendor such as DigiCert
  3. Disable the use of SSL certificates for user interfaces
  4. Use and configure integration with Microsoft Certificate Authority (CA)

Answer(s): D

Explanation:

The requirements demand per-component certificates with 6-month validity and minimal admin effort, while constraints limit skills and budget. Option D, "Use and configure integration with Microsoft Certificate Authority (CA)," meets all criteria: Microsoft CA (integrated via SDDC Manager in VCF 5.2) supports individual certificates per component (e.g., vCenter, NSX), allows short validity periods, automates renewal (reducing effort), and leverages existing infrastructure (low cost, skill- friendly). Option A (wildcard certificates) violates per-component needs. Option B (DigiCert) incurs higher costs and requires more skill. Option C (disabling SSL) compromises security, failing compliance. Microsoft CA aligns with VCF's certificate management capabilities.


Reference:

VMware Cloud Foundation 5.2 Administration Guide, Section on Certificate Management with Microsoft CA; VMware Validated Design 6.2, Certificate Authority Integration.



A design requirement has been specified for a new VMware Cloud Foundation (VCF) instance. All managed workload resources must be lifecycle managed with the following criteria:

* Development resources must be automatically reclaimed after two weeks

* Production resources will be reviewed yearly for reclamation

* Resources identified for reclamation must allow time for review and possible extension

What capability will satisfy the requirements?

  1. Aria Suite Lifecycle Content Management
  2. Aria Operations Rightsizing Recommendations
  3. Aria Automation Lease Policy
  4. Aria Automation Project Membership

Answer(s): C

Explanation:

Lifecycle management of resources in VCF 5.2 involves automation tools like Aria Automation. Option C, "Aria Automation Lease Policy," allows setting expiration dates for resources (e.g., 2 weeks for dev, 1 year for prod), automatically reclaiming them unless extended during a review period, directly meeting all criteria. Option A (Aria Suite Lifecycle) manages software deployment, not resource lifecycles. Option B (Aria Operations Rightsizing) provides sizing insights, not reclamation automation. Option D (Project Membership) controls access, not lifecycles. Aria Automation's lease policies are designed for this exact purpose in VCF, integrating with cloud zones and projects.


Reference:

VMware Aria Automation 8.10 Administration Guide, Section on Lease Policies; VMware Cloud Foundation 5.2 Architect Study Guide, Automation Features.



Share your comments for VMware 2V0-13.24 exam with other users:

A
anonymous
1/12/2024 3:34:00 PM

question 16 should be b (changing the connector settings on the monitor) pc and monitor were powered on. the lights on the pc are on indicating power. the monitor is showing an error text indicating that it is receiving power too. this is a clear sign of having the wrong input selected on the monitor. thus, the "connector setting" needs to be switched from hdmi to display port on the monitor so it receives the signal from the pc, or the other way around (display port to hdmi).

N
NSPK
1/18/2024 10:26:00 AM

q 10. ans is d (in the target org: open deployment settings, click edit next to the source org. select allow inbound changes and save

M
mohamed abdo
9/1/2023 4:59:00 AM

very useful

T
Tom
3/18/2022 8:00:00 PM

i purchased this exam dumps from another website with way more questions but they were all invalid and outdate. this exam dumps was right to the point and all from recent exam. it was a hard pass.

E
Edrick GOP
10/24/2023 6:00:00 AM

it was a good experience and i got 90% in the 200-901 exam.

A
anonymous
8/10/2023 2:28:00 AM

hi please upload this

B
Bakir
7/6/2023 7:24:00 AM

please upload it

A
Aman
6/18/2023 1:27:00 PM

really need this dump. can you please help.

N
Neela Para
1/8/2024 6:39:00 PM

really good and covers many areas explaining the answer.

K
Karan Patel
8/15/2023 12:51:00 AM

yes, can you please upload the exam?

N
NISHAD
11/7/2023 11:28:00 AM

how many questions are there in these dumps?

P
Pankaj
7/3/2023 3:57:00 AM

hi team, please upload this , i need it.

D
DN
9/4/2023 11:19:00 PM

question 14 - run terraform import: this is the recommended best practice for bringing manually created or destroyed resources under terraform management. you use terraform import to associate an existing resource with a terraform resource configuration. this ensures that terraform is aware of the resource, and you can subsequently manage it with terraform.

Z
Zhiguang
8/19/2023 11:37:00 PM

please upload dump. thanks in advance.

D
deedee
12/23/2023 5:51:00 PM

great great

A
Asad Khan
11/1/2023 3:10:00 AM

answer 16 should be b your organizational policies require you to use virtual machines directly

S
Sale Danasabe
10/24/2023 5:21:00 PM

the question are kind of tricky of you didnt get the hnag on it.

L
Luis
11/16/2023 1:39:00 PM

can anyone tell me if this is for rhel8 or rhel9?

H
hik
1/19/2024 1:47:00 PM

good content

B
Blessious Phiri
8/15/2023 2:18:00 PM

pdb and cdb are critical to the database

Z
Zuned
10/22/2023 4:39:00 AM

till 104 questions are free, lets see how it helps me in my exam today.

M
Muhammad Rawish Siddiqui
12/3/2023 12:11:00 PM

question # 56, answer is true not false.

A
Amaresh Vashishtha
8/27/2023 1:33:00 AM

i would be requiring dumps to prepare for certification exam

A
Asad
9/8/2023 1:01:00 AM

very helpful

B
Blessious Phiri
8/13/2023 3:10:00 PM

control file is the heart of rman backup

S
Senthil
9/19/2023 5:47:00 AM

hi could you please upload the ibm c2090-543 dumps

H
Harry
6/27/2023 7:20:00 AM

appriciate if you could upload this again

A
Anonymous
7/10/2023 4:10:00 AM

please upload the dump

R
Raja
6/20/2023 5:30:00 AM

i found some questions answers mismatch with explanation answers. please properly update

D
Doora
11/30/2023 4:20:00 AM

nothing to mention

D
deally
1/19/2024 3:41:00 PM

knowable questions

S
Sonia
7/23/2023 4:03:00 PM

very helpfull

B
binEY
10/6/2023 5:15:00 AM

good questions

N
Neha
9/28/2023 1:58:00 PM

its helpful

AI Tutor 👋 I’m here to help!