VMware 2V0-13.24 Exam (page: 3)
VMware Cloud Foundation 5.2 Architect
Updated on: 12-Feb-2026

Viewing Page 3 of 19

As part of a new VMware Cloud Foundation (VCF) deployment, a customer is planning to implement vSphere IaaS control plane.
What component could be installed and enabled to implement the solution?

  1. Aria Automation
  2. NSX Edge networking
  3. Storage DRS
  4. Aria Operations

Answer(s): A

Explanation:

The vSphere IaaS (Infrastructure-as-a-Service) control plane in VCF 5.2 enables self-service provisioning and automation of virtualized resources, integrating with vSphere's Supervisor Cluster for cloud-like functionality. Option A, "Aria Automation" (formerly vRealize Automation), is the correct component, providing orchestration, cloud templates, and self-service portals to manage IaaS workloads in VCF. It integrates with vSphere and NSX to deliver this capability. Option B, "NSX Edge networking," focuses on networking, not IaaS control. Option C, "Storage DRS," optimizes storage but isn't a control plane. Option D, "Aria Operations," is for monitoring, not provisioning. VMware's documentation confirms Aria Automation's role in VCF IaaS.


Reference:

VMware Cloud Foundation 5.2 Architekt Study Guide, Chapter 6: Automation and

Orchestration; VMware Aria Automation 8.10 Product Documentation, vSphere IaaS Integration.



An architect is preparing a VI Workload Domain design with a dedicated NSX instance. The workload domain is planned to grow up to 300 ESXi hosts within the next six months.
Which is the minimum NSX Manager form factor that should be recommended by the architect for this VI Workload Domain to support the forecasted growth?

  1. Large
  2. Medium
  3. Extra Small
  4. Small

Answer(s): A

Explanation:

NSX Manager in VCF 5.2 comes in form factors (Small, Medium, Large) with capacity limits based on managed objects (hosts, VMs, etc.). A VI Workload Domain with a dedicated NSX instance growing to 300 ESXi hosts requires a form factor supporting this scale. Per NSX-T 3.2 sizing guidelines (used in VCF 5.2), the Large form factor supports up to 1,024 hosts, 12,000 VMs, and extensive networking objects, making it suitable for 300 hosts and future growth. Medium supports up to 256 hosts, which is close but risks being exceeded with additional VMs or objects. Small (64 hosts) and Extra Small (lab use) are insufficient. The architect must recommend "Large" (A) to ensure scalability and performance for this VI domain.


Reference:

NSX-T 3.2 Reference Design Guide (VCF 5.2 compatible), Section on NSX Manager Sizing; VMware Cloud Foundation 5.2 Deployment Guide, Workload Domain Sizing.



A customer is deploying VCF at a new datacenter location. They will migrate their workloads from the existing datacenter to the new VCF platform over six months. Both datacenters will run simultaneously for six months during the migration.
Which of the following should be a documented risk?

  1. Six months may not be enough time to complete the migration.
  2. There will be connectivity between the two locations.
  3. Bandwidth between the two locations is sufficient to accommodate the workload migration.
  4. Workloads will be powered off during migration.

Answer(s): A

Explanation:

In VCF design, risks are potential issues that could jeopardize project success, documented to prompt mitigation planning. Option A, "Six months may not be enough time to complete the migration," is a valid risk because workload migration complexity (e.g., application dependencies, data volume, testing) could exceed the timeline, a common challenge in VCF deployments. Option B (connectivity) is a fact, not a risk, unless qualified as unreliable. Option C (sufficient bandwidth) is an assumption or requirement, not a risk unless proven inadequate. Option D (powering off workloads) is a design choice, not an inherent risk without evidence. VCF migration planning emphasizes timeline risks, making A the best choice.


Reference:

VMware Cloud Foundation 5.2 Planning and Preparation Guide, Chapter 5: Risk Assessment; VMware Migration Best Practices for VCF.



An architect had gathered the following requirements and constraints for a VMware Cloud Foundation (VCF) deployment.

Requirements:

* User interface (UI) SSL certificates must have a maximum validity of 6 months.

* Have the least possible administrative time to install and renew certificates.

* Each certificate must be created on a per VCF component basis.

Constraints:

* Limited administrative skillsets on SSL certificate administration

* Limited operational expenditure budget for SSL certificates

Which design decision should be made to satisfy the stated requirement(s) and constraint(s)?

  1. Use wildcard certificates
  2. Use and configure integration with a certificate vendor such as DigiCert
  3. Disable the use of SSL certificates for user interfaces
  4. Use and configure integration with Microsoft Certificate Authority (CA)

Answer(s): D

Explanation:

The requirements demand per-component certificates with 6-month validity and minimal admin effort, while constraints limit skills and budget. Option D, "Use and configure integration with Microsoft Certificate Authority (CA)," meets all criteria: Microsoft CA (integrated via SDDC Manager in VCF 5.2) supports individual certificates per component (e.g., vCenter, NSX), allows short validity periods, automates renewal (reducing effort), and leverages existing infrastructure (low cost, skill- friendly). Option A (wildcard certificates) violates per-component needs. Option B (DigiCert) incurs higher costs and requires more skill. Option C (disabling SSL) compromises security, failing compliance. Microsoft CA aligns with VCF's certificate management capabilities.


Reference:

VMware Cloud Foundation 5.2 Administration Guide, Section on Certificate Management with Microsoft CA; VMware Validated Design 6.2, Certificate Authority Integration.



A design requirement has been specified for a new VMware Cloud Foundation (VCF) instance. All managed workload resources must be lifecycle managed with the following criteria:

* Development resources must be automatically reclaimed after two weeks

* Production resources will be reviewed yearly for reclamation

* Resources identified for reclamation must allow time for review and possible extension

What capability will satisfy the requirements?

  1. Aria Suite Lifecycle Content Management
  2. Aria Operations Rightsizing Recommendations
  3. Aria Automation Lease Policy
  4. Aria Automation Project Membership

Answer(s): C

Explanation:

Lifecycle management of resources in VCF 5.2 involves automation tools like Aria Automation. Option C, "Aria Automation Lease Policy," allows setting expiration dates for resources (e.g., 2 weeks for dev, 1 year for prod), automatically reclaiming them unless extended during a review period, directly meeting all criteria. Option A (Aria Suite Lifecycle) manages software deployment, not resource lifecycles. Option B (Aria Operations Rightsizing) provides sizing insights, not reclamation automation. Option D (Project Membership) controls access, not lifecycles. Aria Automation's lease policies are designed for this exact purpose in VCF, integrating with cloud zones and projects.


Reference:

VMware Aria Automation 8.10 Administration Guide, Section on Lease Policies; VMware Cloud Foundation 5.2 Architect Study Guide, Automation Features.



Viewing Page 3 of 19



Share your comments for VMware 2V0-13.24 exam with other users:

Praveen P 11/8/2023 5:18:00 AM

good content
UNITED STATES


Anastasiia 12/28/2023 9:06:00 AM

totally not correct answers. 21. you have one gcp account running in your default region and zone and another account running in a non-default region and zone. you want to start a new compute engine instance in these two google cloud platform accounts using the command line interface. what should you do? correct: create two configurations using gcloud config configurations create [name]. run gcloud config configurations activate [name] to switch between accounts when running the commands to start the compute engine instances.
Anonymous


Priyanka 7/24/2023 2:26:00 AM

kindly upload the dumps
Anonymous


Nabeel 7/25/2023 4:11:00 PM

still learning
Anonymous


gure 7/26/2023 5:10:00 PM

excellent way to learn
UNITED STATES


ciken 8/24/2023 2:55:00 PM

help so much
Anonymous


Biswa 11/20/2023 9:28:00 AM

understand sql col.
Anonymous


Saint Pierre 10/24/2023 6:21:00 AM

i would give 5 stars to this website as i studied for az-800 exam from here. it has all the relevant material available for preparation. i got 890/1000 on the test.
Anonymous


Rose 7/24/2023 2:16:00 PM

this is nice.
Anonymous


anon 10/15/2023 12:21:00 PM

q55- the ridac workflow can be modified using flow designer, correct answer is d not a
UNITED STATES


NanoTek3 6/13/2022 10:44:00 PM

by far this is the most accurate exam dumps i have ever purchased. all questions are in the exam. i saw almost 90% of the questions word by word.
UNITED STATES


eriy 11/9/2023 5:12:00 AM

i cleared the az-104 exam by scoring 930/1000 on the exam. it was all possible due to this platform as it provides premium quality service. thank you!
UNITED STATES


Muhammad Rawish Siddiqui 12/8/2023 8:12:00 PM

question # 232: accessibility, privacy, and innovation are not data quality dimensions.
SAUDI ARABIA


Venkat 12/27/2023 9:04:00 AM

looks wrong answer for 443 question, please check and update
Anonymous


Varun 10/29/2023 9:11:00 PM

great question
Anonymous


Doc 10/29/2023 9:36:00 PM

question: a user wants to start a recruiting posting job posting. what must occur before the posting process can begin? 3 ans: comment- option e is incorrect reason: as part of enablement steps, sap recommends that to be able to post jobs to a job board, a user need to have the correct permission and secondly, be associated with one posting profile at minimum
UNITED KINGDOM


It‘s not A 9/17/2023 5:31:00 PM

answer to question 72 is d [sys_user_role]
Anonymous


indira m 8/14/2023 12:15:00 PM

please provide the pdf
UNITED STATES


ribrahim 8/1/2023 6:05:00 AM

hey guys, just to let you all know that i cleared my 312-38 today within 1 hr with 100 questions and passed. thank you so much brain-dumps.net all the questions that ive studied in this dump came out exactly the same word for word "verbatim". you rock brain-dumps.net!!! section name total score gained score network perimeter protection 16 11 incident response 10 8 enterprise virtual, cloud, and wireless network protection 12 8 application and data protection 13 10 network défense management 10 9 endpoint protection 15 12 incident d
SINGAPORE


Andrew 8/23/2023 6:02:00 PM

very helpful
Anonymous


latha 9/7/2023 8:14:00 AM

useful questions
GERMANY


ibrahim 11/9/2023 7:57:00 AM

page :20 https://exam-dumps.com/snowflake/free-cof-c02-braindumps.html?p=20#collapse_453 q 74: true or false: pipes can be suspended and resumed. true. desc.: pausing or resuming pipes in addition to the pipe owner, a role that has the following minimum permissions can pause or resume the pipe https://docs.snowflake.com/en/user-guide/data-load-snowpipe-intro
FINLAND


Franklin Allagoa 7/5/2023 5:16:00 AM

i want hcia exam dumps
Anonymous


SSA 12/24/2023 1:18:00 PM

good training
Anonymous


BK 8/11/2023 12:23:00 PM

very useful
INDIA


Deepika Narayanan 7/13/2023 11:05:00 PM

yes need this exam dumps
Anonymous


Blessious Phiri 8/15/2023 3:31:00 PM

these questions are a great eye opener
Anonymous


Jagdesh 9/8/2023 8:17:00 AM

thank you for providing these questions and answers. they helped me pass my exam. you guys are great.
CANADA


TS 7/18/2023 3:32:00 PM

good knowledge
Anonymous


Asad Khan 11/1/2023 2:44:00 AM

answer 10 should be a because only a new project will be created & the organization is the same.
Anonymous


Raj 9/12/2023 3:49:00 PM

can you please upload the dump again
UNITED STATES


Christian Klein 6/23/2023 1:32:00 PM

is it legit questions from sap certifications ?
UNITED STATES


anonymous 1/12/2024 3:34:00 PM

question 16 should be b (changing the connector settings on the monitor) pc and monitor were powered on. the lights on the pc are on indicating power. the monitor is showing an error text indicating that it is receiving power too. this is a clear sign of having the wrong input selected on the monitor. thus, the "connector setting" needs to be switched from hdmi to display port on the monitor so it receives the signal from the pc, or the other way around (display port to hdmi).
UNITED STATES


NSPK 1/18/2024 10:26:00 AM

q 10. ans is d (in the target org: open deployment settings, click edit next to the source org. select allow inbound changes and save
Anonymous