A request to protect some new domain controllers has been submitted in the ticketing system The engineer creates a backup job with the following steps:
1. Right-clicks on the Jobs navigation item on the left.
2. Selects VMware vSphere from the menu.
3. Enters a name for the job.
4. Selects workloads to protect.
5. Defines a job schedule.
6. Clicks the Finish button.
When testing restores, the engineer finds that the backups are crash-consistent.
Which set of steps should the engineer use to avoid crash-consistent backups for the domain controllers?
- Launch the New Backup Job Wizard. Enter a name for the job. Select workloads to protect. Choose a destination. Enable the Application-Aware checkbox and configure settings. Define a job schedule. Click the Finish button.
- Launch the New Backup Job Wizard. Enter a name and a description. Select a resource pool to protect. Specify a backup repository with copy-mode enabled. Define a job schedule. Click the Finish button.
- Launch the New Backup Job Wizard. Enter a name for the job. Specify a backup repository. Specify Guest Processing settings. Define a job schedule Click the Finish button.
- Launch the New Backup Job Wizard. Enter a name or description for the job. Select the vSphere environment to protect. Choose the Default Backup. Repository Check the box labelled “Run the job when I click Finish". Specify Guest Processing settings. Define a job schedule.
Reveal Solution
Next Question