What unit is green power purchased in?

  1. Kilowatt-hour (kWh)
  2. British thermal units (BTUs]
  3. Dollar amount of the purchase price
  4. Megawatt-hour per square foot (MWh/sf)

Answer(s): A



Which of the following strategies meets energy demand with renewable energy?

  1. Installing a solar hot water heater
  2. Incinerating waste to heat a home
  3. Implementing a composting program in an office break room
  4. Purchasing Renewable Energy Certificates (RECs)from a clean coal plant

Answer(s): A



The project team is conducting a feasibility study of a building project. The developer has pre- qualified four potential sites that are all financially viable. Within the context of LEED, which site is the most applicable?

  1. A brownfield site with no access to metro
  2. A brownfield site in a national park with car access only
  3. A greenfield site with access to public transport and proximity to grocery stores
  4. A brownfield site with access to five lines of public transportation and basic services

Answer(s): D



Which of the following strategies prioritizes cost-effectiveness when designing a LEED project?

  1. Onsite renewable systems
  2. Enhanced Commissioning (Cx)
  3. Measuring and verifying systems performance for one year
  4. Applying an integrative design process

Answer(s): B



Which of the following is a minimum program requirement for the LEED for New Construction and Major Renovations Rating System?

  1. Comply with minimum project size
  2. Include temporary structures in floor area calculations
  3. Define a site boundary for the sole purpose of complying with credits
  4. Comply with the best practices of the International Organization for Standardization (ISO)

Answer(s): A



Share your comments for USGBC LEED Green Associate exam with other users:

L
labuschanka
11/16/2023 6:06:00 PM

i gave the microsoft azure az-500 tests and prepared from this site as it has latest mock tests available which helped me evaluate my performance and score 919/1000

M
Marianne
10/22/2023 11:57:00 PM

i cannot see the button to go to the questions

S
sushant
6/28/2023 4:52:00 AM

good questions

A
A\MAM
6/27/2023 5:17:00 PM

q-6 ans-b correct. https://docs.paloaltonetworks.com/pan-os/9-1/pan-os-cli-quick-start/use-the-cli/commit-configuration-changes

U
unanimous
12/15/2023 6:38:00 AM

very nice very nice

A
akminocha
9/28/2023 10:36:00 AM

please help us with 1z0-1107-2 dumps

J
Jefi
9/4/2023 8:15:00 AM

please upload the practice questions

T
Thembelani
5/30/2023 2:45:00 AM

need this dumps

A
Abduraimov
4/19/2023 12:43:00 AM

preparing for this exam is overwhelming. you cannot pass without the help of these exam dumps.

P
Puneeth
10/5/2023 2:06:00 AM

new to this site but i feel it is good

A
Ashok Kumar
1/2/2024 6:53:00 AM

the correct answer to q8 is b. explanation since the mule app has a dependency, it is necessary to include project modules and dependencies to make sure the app will run successfully on the runtime on any other machine. source code of the component that the mule app is dependent of does not need to be included in the exported jar file, because the source code is not being used while executing an app. compiled code is being used instead.

M
Merry
7/30/2023 6:57:00 AM

good questions

V
VoiceofMidnight
12/17/2023 4:07:00 PM

Delayed the exam until December 29th.

U
Umar Ali
8/29/2023 2:59:00 PM

A and D are True

V
vel
8/28/2023 9:17:09 AM

good one with explanation

G
Gurdeep
1/18/2024 4:00:15 PM

This is one of the most useful study guides I have ever used.

AI Tutor 👋 I’m here to help!