Six Sigma SSGB Exam (page: 3)
Six Sigma Green Belt
Updated on: 25-Dec-2025

Viewing Page 3 of 41

A periodic time frame can be used to arrange for Control Limit and Center Line calculations with good SPC implementation in a process.

  1. True
  2. False

Answer(s): A



The data on SPC charts are typically constructed such that they have the most recent data point on the right hand side.

  1. True
  2. False

Answer(s): A



Which statement(s) describe an undesirable situation when implementing SPC?

  1. The lower Control Limit for the R chart is equal to zero
  2. Attempt to use SPC for tracking transaction times at a warehouse
  3. A process is in Statistical Control before implementation of SPC
  4. The Control Limits are wider than the customer specification limits

Answer(s): D



If a process has Outliers which pair of charts is most preferable if subgroups will exist for the Continuous Data?

  1. Individual--Moving Range
  2. Xbar-R Charts
  3. Xbar-S Charts
  4. nP and P Charts

Answer(s): B



After a Belt has put data through the smoothing process which chart would be used to look for trends in the data?

  1. Moving Average Chart
  2. Multi-Vari Chart
  3. X bar Chart
  4. Pareto Chart

Answer(s): A



Viewing Page 3 of 41



Share your comments for Six Sigma SSGB exam with other users:

Chengchaone 9/11/2023 10:22:00 AM

can you please upload please?
Anonymous