Upon which of the five Scrum Values does Professional Scrum with Kanban build?

(choose the best three answers)

  1. Courage.
  2. Transparency.
  3. Focus.
  4. Openness.
  5. Professionalism.

Answer(s): A,C,D

Explanation:

Professional Scrum with Kanban builds upon the core Scrum values to enhance flow and effectiveness within the team. The relevant values are:

· Courage: Encourages team members to address issues, experiment with changes in the workflow, and make adjustments transparently, even when facing uncertainty.

· Focus: Enhances the team's ability to concentrate on achieving the Sprint Goal and flow of work items by using Work in Progress (WIP) limits and other Kanban practices.

· Openness: Promotes an open environment where the team transparently shares information on work progress, obstacles, and opportunities for improvement, which is key for continuous inspection and adaptation in Kanban.

These values directly support the empirical process control and continuous improvement principles of Kanban



True or False: The primary effect of limiting Work in Progress (WIP) is that it creates a pull system.

  1. True
  2. False

Answer(s): A

Explanation:

The primary effect of limiting Work in Progress (WIP) is to create a pull system. A pull system ensures that new work is only started when there is capacity, meaning that work is "pulled" into the system when the team has the availability to do so. This approach prevents overloading the team and helps maintain a steady and predictable flow of work, aligning with the Kanban practices within the Scrum framework



Who must change the Work in Progress (WIP) Limits in the Definition of Workflow when urgent work emerges from the Sprint?

(choose the best answer)

  1. The Developers.
  2. The Product Owner.
  3. The Scrum Master.
  4. No one. Urgent work is not a reason to change WIP Limits.
  5. No one. WIP Limits cannot be modified during a Sprint.

Answer(s): D

Explanation:

In Professional Scrum with Kanban, the Work in Progress (WIP) limits are set as a policy to maintain a sustainable flow of work. Urgent work emerging does not automatically warrant changing these WIP limits; instead, the team should first discuss how to accommodate the urgent work within the existing constraints. Modifying WIP limits for urgent work could undermine the benefits of a controlled flow, which is why urgent work should not be a reason to change WIP limits during a

Sprint



True or False: If you reduce your batch size, your overall efficiency will always increase.

  1. True
  2. False

Answer(s): B

Explanation:

Reducing batch size does not always guarantee an increase in overall efficiency.
While smaller batch sizes can lead to faster feedback, more frequent deliveries, and reduced risk, there can be situations where reducing the batch size too much results in inefficiencies, such as increased overhead costs or excessive context switching. Thus, the relationship between batch size and efficiency depends on the context, system constraints, and the nature of the work



When can a Work in Progress (WIP) Limit change?

(choose the best answer)

  1. At any time.
  2. When the Product Owner decides to change it.
  3. It never changes.
  4. Only during the Sprint Retrospective.
  5. Only during Sprint Planning.
  6. Only during the Daily Scrum.

Answer(s): D

Explanation:

According to the Kanban Guide for Scrum Teams, Work in Progress (WIP) limits are set to control the amount of work in progress in a system, enhancing flow, reducing bottlenecks, and ensuring smoother delivery. WIP limits can be changed as a result of an inspection and adaptation cycle, which primarily occurs during the Sprint Retrospective.

During the Sprint Retrospective, the Scrum Team reflects on its process, practices, and interactions. This is the time when the team inspects its flow, evaluates the effectiveness of the current WIP limits, and can make decisions to adjust them based on observed issues or potential improvements. The goal is to optimize the team's ability to deliver value, and adjusting WIP limits during the Retrospective allows for thoughtful consideration based on the team's experience and data from the completed Sprint.

Changing WIP limits at other times could disrupt the flow and reduce the predictability and stability that the limits are intended to create. Therefore, the best practice is to evaluate and change them during the Sprint Retrospective, where the team can inspect the results of their workflow and make informed decisions for the upcoming Sprints



Share your comments for Scrum PSK I exam with other users:

U
Umashankar Sharma
10/22/2023 9:39:00 AM

planning to take psm test

E
ED SHAW
7/31/2023 10:34:00 AM

please allow to download

A
AD
7/22/2023 11:29:00 AM

please provide dumps

A
Ayyjayy
11/6/2023 7:29:00 AM

is the answer to question 15 correct ? i feel like the answer should be b

B
Blessious Phiri
8/12/2023 11:56:00 AM

its getting more technical

J
Jeanine J
7/11/2023 3:04:00 PM

i think these questions are what i need.

A
Aderonke
10/23/2023 2:13:00 PM

helpful assessment

T
Tom
1/5/2024 2:32:00 AM

i am confused about the answers to the questions. do you know if the answers are correct?

V
Vinit N.
8/28/2023 2:33:00 AM

hi, please make the dumps available for my upcoming examination.

S
Sanyog Deshpande
9/14/2023 7:05:00 AM

good practice

T
Tyron
9/8/2023 12:12:00 AM

so far it is really informative

B
beast
7/30/2023 2:22:00 PM

hi i want it please please upload it

M
Mirex
5/26/2023 3:45:00 AM

am preparing for exam ,just nice questions

E
exampei
8/7/2023 8:05:00 AM

please upload c_tadm_23 exam

A
Anonymous
9/12/2023 12:50:00 PM

can we get tdvan4 vantage data engineering pdf?

A
Aish
10/11/2023 5:51:00 AM

want to clear the exam.

S
Smaranika
6/22/2023 8:42:00 AM

could you please upload the dumps of sap c_sac_2302

B
Blessious Phiri
8/15/2023 1:56:00 PM

asm management configuration is about storage

L
Lewis
7/6/2023 8:49:00 PM

kool thumb up

M
Moreece
5/15/2023 8:44:00 AM

just passed the az-500 exam this last friday. most of the questions in this exam dumps are in the exam. i bought the full version and noticed some of the questions which were answered wrong in the free version are all corrected in the full version. this site is good but i wish the had it in an interactive version like a test engine simulator.

T
Terry
5/24/2023 4:41:00 PM

i can practice for exam

E
Emerys
7/29/2023 6:55:00 AM

please i need this exam.

G
Goni Mala
9/2/2023 12:27:00 PM

i need the dump

L
Lenny
9/29/2023 11:30:00 AM

i want it bad, even if cs6 maybe retired, i want to learn cs6

M
MilfSlayer
12/28/2023 8:32:00 PM

i hate comptia with all my heart with their "choose the best" answer format as an argument could be made on every question. they say "the "comptia way", lmao no this right here boys is the comptia way 100%. take it from someone whos failed this exam twice but can configure an entire complex network that these are the questions that are on the test 100% no questions asked. the pbqs are dead on! nice work

S
Swati Raj
11/14/2023 6:28:00 AM

very good materials

K
Ko Htet
10/17/2023 1:28:00 AM

thanks for your support.

P
Philippe
1/22/2023 10:24:00 AM

iam impressed with the quality of these dumps. they questions and answers were easy to understand and the xengine app was very helpful to use.

S
Sam
8/31/2023 10:32:00 AM

not bad but you question database from isaca

B
Brijesh kr
6/29/2023 4:07:00 AM

awesome contents

J
JM
12/19/2023 1:22:00 PM

answer to 134 is casb. while data loss prevention is the goal, in order to implement dlp in cloud applications you need to deploy a casb.

N
Neo
7/26/2023 9:36:00 AM

are these brain dumps sufficient enough to go write exam after practicing them? or does one need more material this wont be enough?

B
Bilal
8/22/2023 6:33:00 AM

i did attend the required cources and i need to be sure that i am ready to take the exam, i would ask you please to share the questions, to be sure that i am fit to proceed with taking the exam.

J
John
11/12/2023 8:48:00 PM

why only give explanations on some, and not all questions and their respective answers?

AI Tutor 👋 I’m here to help!