Which two Framework elements would a Scrum Master have the strongest connection and most frequent interaction? (Choose two.)

  1. Business Owners
  2. Release Train Engineer
  3. Systems Team
  4. Product Owner
  5. Epic Owner

Answer(s): B,D

Explanation:

Release Train Engineer (RTE):
Role: The RTE is a servant leader and coach for the Agile Release Train (ART). They facilitate ART events and processes, assist teams in delivering value, and help manage risks and dependencies.
Interaction with Scrum Master:
Scrum Masters frequently collaborate with the RTE to coordinate cross-team activities and dependencies.
They work together during events like PI Planning, Scrum of Scrums, and Inspect & Adapt (I&A) workshops to ensure alignment and continuous improvement. The RTE provides support and guidance to Scrum Masters, helping them resolve impediments that affect the ART.
Product Owner (PO):
Role: The Product Owner is responsible for defining and prioritizing the team backlog, ensuring that the team is working on the most valuable tasks.
Interaction with Scrum Master:
Scrum Masters work closely with Product Owners to facilitate effective backlog refinement sessions, ensuring that the backlog items are well-understood and ready for iteration planning. They support the Product Owner in maintaining a clear and prioritized backlog, helping to communicate the vision and goals to the team.
During iteration planning and reviews, Scrum Masters assist Product Owners in engaging with the team and stakeholders, ensuring that feedback is collected and incorporated.
SAFe Scrum Master


Reference:

Release Train Engineer:
SAFe materials outline the critical role of the RTE in coordinating the ART and supporting Scrum Masters in their efforts to remove impediments and ensure smooth execution of plans. Scrum Open: Discusses the collaborative relationship between Scrum Masters and RTEs in facilitating ART events and managing dependencies.
Product Owner:
The SAFe framework emphasizes the importance of the Scrum Master-Product Owner partnership in driving the delivery of value and maintaining a healthy backlog. Product Owner Open: Provides insights into how Scrum Masters and Product Owners work together to align on priorities and ensure the team is focused on the right tasks.



What is the primary goal of decentralized decision-making?

  1. To resolve dependencies
  2. To minimize VVIP www
  3. To empower knowledge workers
  4. To reduce delay

Answer(s): D

Explanation:

Decentralized decision-making is a principle in SAFe aimed at distributing decision authority to the people closest to the information and most affected by the decisions. The primary goal of decentralized decision-making is to reduce delay in the decision-making process, which can often occur when decisions need to pass through multiple layers of hierarchy. By empowering individuals and teams to make decisions quickly, organizations can respond faster to changes, improve agility, and maintain a steady flow of work.



What goes into the Portfolio Backlog?

  1. Strategic Themes
  2. Projects
  3. Capabilities
  4. Epics

Answer(s): D

Explanation:

The Portfolio Backlog in SAFe contains the larger initiatives, known as Epics. Epics are substantial pieces of work that require analysis, investment, and development effort over multiple Program Increments (PIs). They represent significant business or technical needs that drive the long-term strategy of the organization. These Epics are prioritized and managed in the Portfolio Backlog, where they can be decomposed into smaller, actionable items as they progress through the development process.



Why is the program predictability measure the primary Metric used during the quantitative measurement part of the Inspect and Adapt event?

  1. To measure the predictability of business value delivered in the PI timebox
  2. To predict the scope of the remaining requirements in the Program Backlog
  3. To forecast when remaining features could be delivered to customers
  4. To match customer demand to the Agile Release Train's velocity

Answer(s): A

Explanation:

The program predictability measure is the primary metric used during the quantitative measurement part of the Inspect and Adapt (I&A) event in SAFe. This measure assesses how reliably the Agile Release Train (ART) can deliver business value within the Program Increment (PI) timebox. It helps to:
Evaluate the team's ability to meet their commitments.
Identify areas where predictability can be improved.

Ensure that the business value planned for the PI is actually delivered. By focusing on the predictability of business value, organizations can better align their planning and execution efforts, ultimately enhancing customer satisfaction and achieving strategic goals more effectively.
SAFe Scrum Master Reference
SAFe Inspect and Adapt events
SAFe 5.0 framework: using program predictability as a key metric to assess and improve ART performance.



If the distance between the arrival and departure curves on a team's cumulative flow diagram is growing apart, what is likely happening?

  1. Lead time is increasing
  2. Unplanned work is pushed into the backlog
  3. WIP is decreasing
  4. The backlog is being reprioritized

Answer(s): A

Explanation:

Cumulative Flow Diagram (CFD): A CFD is a visual tool used in Kanban and Scrum to show the progress of work items through different stages of the workflow over time. Arrival and Departure Curves: These curves represent the work items entering (arrival) and leaving (departure) the system.
Growing Distance: If the distance between the arrival and departure curves on the CFD is growing apart, it indicates that work items are taking longer to move through the system. Lead Time: This term refers to the total time from when a work item is created until it is completed. An increasing distance between the curves means that work items are spending more time in the system, thus increasing the lead time.
SAFe Scrum Master


Reference:

SAFe materials on flow metrics and Kanban principles highlight the importance of monitoring lead time and using CFDs to identify bottlenecks and inefficiencies in the workflow.



Share your comments for Scaled Agile SAFe-SASM exam with other users:

N
NanoTek3
6/13/2022 10:44:00 PM

by far this is the most accurate exam dumps i have ever purchased. all questions are in the exam. i saw almost 90% of the questions word by word.

E
eriy
11/9/2023 5:12:00 AM

i cleared the az-104 exam by scoring 930/1000 on the exam. it was all possible due to this platform as it provides premium quality service. thank you!

M
Muhammad Rawish Siddiqui
12/8/2023 8:12:00 PM

question # 232: accessibility, privacy, and innovation are not data quality dimensions.

V
Venkat
12/27/2023 9:04:00 AM

looks wrong answer for 443 question, please check and update

V
Varun
10/29/2023 9:11:00 PM

great question

D
Doc
10/29/2023 9:36:00 PM

question: a user wants to start a recruiting posting job posting. what must occur before the posting process can begin? 3 ans: comment- option e is incorrect reason: as part of enablement steps, sap recommends that to be able to post jobs to a job board, a user need to have the correct permission and secondly, be associated with one posting profile at minimum

I
It‘s not A
9/17/2023 5:31:00 PM

answer to question 72 is d [sys_user_role]

I
indira m
8/14/2023 12:15:00 PM

please provide the pdf

R
ribrahim
8/1/2023 6:05:00 AM

hey guys, just to let you all know that i cleared my 312-38 today within 1 hr with 100 questions and passed. thank you so much brain-dumps.net all the questions that ive studied in this dump came out exactly the same word for word "verbatim". you rock brain-dumps.net!!! section name total score gained score network perimeter protection 16 11 incident response 10 8 enterprise virtual, cloud, and wireless network protection 12 8 application and data protection 13 10 network défense management 10 9 endpoint protection 15 12 incident d

A
Andrew
8/23/2023 6:02:00 PM

very helpful

L
latha
9/7/2023 8:14:00 AM

useful questions

I
ibrahim
11/9/2023 7:57:00 AM

page :20 https://exam-dumps.com/snowflake/free-cof-c02-braindumps.html?p=20#collapse_453 q 74: true or false: pipes can be suspended and resumed. true. desc.: pausing or resuming pipes in addition to the pipe owner, a role that has the following minimum permissions can pause or resume the pipe https://docs.snowflake.com/en/user-guide/data-load-snowpipe-intro

F
Franklin Allagoa
7/5/2023 5:16:00 AM

i want hcia exam dumps

S
SSA
12/24/2023 1:18:00 PM

good training

B
BK
8/11/2023 12:23:00 PM

very useful

D
Deepika Narayanan
7/13/2023 11:05:00 PM

yes need this exam dumps

B
Blessious Phiri
8/15/2023 3:31:00 PM

these questions are a great eye opener

J
Jagdesh
9/8/2023 8:17:00 AM

thank you for providing these questions and answers. they helped me pass my exam. you guys are great.

T
TS
7/18/2023 3:32:00 PM

good knowledge

A
Asad Khan
11/1/2023 2:44:00 AM

answer 10 should be a because only a new project will be created & the organization is the same.

R
Raj
9/12/2023 3:49:00 PM

can you please upload the dump again

C
Christian Klein
6/23/2023 1:32:00 PM

is it legit questions from sap certifications ?

A
anonymous
1/12/2024 3:34:00 PM

question 16 should be b (changing the connector settings on the monitor) pc and monitor were powered on. the lights on the pc are on indicating power. the monitor is showing an error text indicating that it is receiving power too. this is a clear sign of having the wrong input selected on the monitor. thus, the "connector setting" needs to be switched from hdmi to display port on the monitor so it receives the signal from the pc, or the other way around (display port to hdmi).

N
NSPK
1/18/2024 10:26:00 AM

q 10. ans is d (in the target org: open deployment settings, click edit next to the source org. select allow inbound changes and save

M
mohamed abdo
9/1/2023 4:59:00 AM

very useful

T
Tom
3/18/2022 8:00:00 PM

i purchased this exam dumps from another website with way more questions but they were all invalid and outdate. this exam dumps was right to the point and all from recent exam. it was a hard pass.

E
Edrick GOP
10/24/2023 6:00:00 AM

it was a good experience and i got 90% in the 200-901 exam.

A
anonymous
8/10/2023 2:28:00 AM

hi please upload this

B
Bakir
7/6/2023 7:24:00 AM

please upload it

A
Aman
6/18/2023 1:27:00 PM

really need this dump. can you please help.

N
Neela Para
1/8/2024 6:39:00 PM

really good and covers many areas explaining the answer.

K
Karan Patel
8/15/2023 12:51:00 AM

yes, can you please upload the exam?

N
NISHAD
11/7/2023 11:28:00 AM

how many questions are there in these dumps?

P
Pankaj
7/3/2023 3:57:00 AM

hi team, please upload this , i need it.

AI Tutor 👋 I’m here to help!