You select the master data for production orders via production versions.
Which information is contained in a production version?

  1. The explosion dates for the routing and BOM
  2. The routing and BOM alternatives to be used
  3. The default order type to be used
  4. The control parameters for selecting routings and BOM

Answer(s): B



What do you have to consider, when you use the ATP (Available To Promise) checks for material? (Choose two)

  1. ATP checks can be carried out automatically when releasing a production order.
  2. ATP checks are automatically performed during Material Requirements Planning (MRP) runs.
  3. ATP checks are used to evaluate the free capacity on a certain work center.
  4. ATP checks are mandatory for lead-time scheduling.
  5. ATP checks can be adjusted to also consider future requirements and receipts.

Answer(s): A,E



Which Customizing element controls the determination of planned costs in production orders?

  1. Accounting type
  2. Costing variant
  3. Calculation procedure
  4. Settlement profile

Answer(s): B



An enterprise based in the US produces an end product that is used with the unit of measure "pound" (LB). The material is now to be marketed in the EU. A prerequisite for this is that the material can be sold with the unit "kilogram" (KG).
What is the easiest way to fulfill this requirement?

  1. Define a unit of measure group that converts pounds to kilograms in the basic data customizing and assign it to the material master on basic data view 1.
  2. Add a conversion factor for converting pounds to kilograms on basic data view 1 in the material master.
  3. Create a new material with a reference to the original material and assign the metric unit of measure to the new material master.
  4. There is no need to take any action. In this scenario, the conversion of units of measurements is done automatically.

Answer(s): D



In the SAP ECC system, a material is produced using production orders. The planning table for repetitive manufacturing should be used to plan line loading for this material. On the initial screen of the planning table, you select this material and then receive a message informing you that you cannot use the planning table for this material (see attached screenshot).



What could be the reason?

  1. There are no planned orders or production orders present.
  2. The repetitive manufacturing indicator has been set.
  3. There is no valid production version for this material.
  4. There are no requirements present.

Answer(s): C



Share your comments for SAP C_TSCM42_67 exam with other users:

S
Sandeep
12/29/2023 4:07:00 AM

very useful

K
kevin
9/29/2023 8:04:00 AM

physical tempering techniques

B
Blessious Phiri
8/15/2023 4:08:00 PM

its giving best technical knowledge

T
Testbear
6/13/2023 11:15:00 AM

please upload

S
shime
10/24/2023 4:23:00 AM

great question with explanation thanks!!

T
Thembelani
5/30/2023 2:40:00 AM

does this exam have lab sections?

S
Shin
9/8/2023 5:31:00 AM

please upload

P
priti kagwade
7/22/2023 5:17:00 AM

please upload the braindump for .net

R
Robe
9/27/2023 8:15:00 PM

i need this exam 1z0-1107-2. please.

C
Chiranthaka
9/20/2023 11:22:00 AM

very useful!

N
Not Miguel
11/26/2023 9:43:00 PM

for this question - "which three type of basic patient or member information is displayed on the patient info component? (choose three.)", list of conditions is not displayed (it is displayed in patient card, not patient info). so should be thumbnail of chatter photo

A
Andrus
12/17/2023 12:09:00 PM

q52 should be d. vm storage controller bandwidth represents the amount of data (in terms of bandwidth) that a vms storage controller is using to read and write data to the storage fabric.

R
Raj
5/25/2023 8:43:00 AM

nice questions

M
max
12/22/2023 3:45:00 PM

very useful

M
Muhammad Rawish Siddiqui
12/8/2023 6:12:00 PM

question # 208: failure logs is not an example of operational metadata.

S
Sachin Bedi
1/5/2024 4:47:00 AM

good questions

K
Kenneth
12/8/2023 7:34:00 AM

thank you for the test materials!

H
Harjinder Singh
8/9/2023 4:16:00 AM

its very helpful

S
SD
7/13/2023 12:56:00 AM

good questions

K
kanjoe
7/2/2023 11:40:00 AM

good questons

M
Mahmoud
7/6/2023 4:24:00 AM

i need the dumb of the hcip security v4.0 exam

W
Wei
8/3/2023 4:18:00 AM

upload the dump please

S
Stephen
10/3/2023 6:24:00 PM

yes, iam looking this

S
Stephen
8/4/2023 9:08:00 PM

please upload cima e2 managing performance dumps

H
hp
6/16/2023 12:44:00 AM

wonderful questions

P
Priyo
11/14/2023 2:23:00 AM

i used this site since 2000, still great to support my career

J
Jude
8/29/2023 1:56:00 PM

why is the answer to "which of the following is required by scrum?" all of the following stated below since most of them are not mandatory? sprint retrospective. members must be stand up at the daily scrum. sprint burndown chart. release planning.

M
Marc blue
9/15/2023 4:11:00 AM

great job. hope this helps out.

A
Anne
9/13/2023 2:33:00 AM

upload please. many thanks!

P
pepe el toro
9/12/2023 7:55:00 PM

this is so interesting

A
Antony
11/28/2023 12:13:00 AM

great material thanks

T
Thembelani
5/30/2023 2:22:00 AM

anyone who wrote this exam recently

P
P
9/16/2023 1:27:00 AM

ok they re good

J
Jorn
7/13/2023 5:05:00 AM

relevant questions

AI Tutor 👋 I’m here to help!