In your plant MRP is activated.

Which options do you have to exclude a material from the MRP run?
Note: There are 2 correct answers to this question.

  1. Use a specific MRP list.
  2. Use a specific material status.
  3. Use a specific material group.
  4. Use a specific MRP type.

Answer(s): B,D



In documentation for MRP in Advanced Planning you read that new orders are created through infinite planning.
What does this mean for the capacity requirements of a new order?

  1. MRP assigns the capacity requirements automatically after the last scheduled operation for each work center.
  2. MRP creates the capacity requirements without considering existing load on the work centers.
  3. MRP creates the capacity requirements at the earliest possible time.
  4. MRP assigns the capacity requirements automatically to work centers with the earliest available capacity.

Answer(s): A



Which master data fields can have an impact on whether MRP creates planned orders or purchase requisitions for a material?
Note: There are 2 correct answers to this question.

  1. Procurement type
  2. Material type
  3. MRP type
  4. MRP group

Answer(s): A,B



You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage.
What must you do?

Note: There are 2 correct answers to this question.

  1. Set the creation indicator for purchase requisitions on the initial screen of the MRP run.
  2. Add the agreement to the source list mark it for MRP relevance.
  3. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
  4. Add the agreement to the quota arrangement mark it for MRP relevance.

Answer(s): B,C



How are dependent requirements for assemblies created?
Note: There are 2 correct answers to this question.

  1. They are created together with the independent requirement for the finished product.
  2. They are created on assembly level during the planning run.
  3. They are created with exact times in Advanced Planning.
  4. They are only created for multilevel bill of material (BOM) structures.

Answer(s): B,C



Which time elements does MRP consider in backward scheduling to determine the basic dates for components from depender
Note: There are 2 correct answers to this question.

  1. Planned delivery time
  2. Total replenishment lead time
  3. Operation duration
  4. Inhouse production time

Answer(s): A,D



What determines whether the planned independent requirements in dem management are consumed by other requirements?
Note: There are 2 correct answers to this question.

  1. Order type
  2. Requirements profile
  3. Requirements type
  4. Planning strategy

Answer(s): C,D



What does forecasting in the dem planning cycle include?
Note: There are 3 correct answers to this question.

  1. Oneoff events
  2. Past production planning quantities
  3. Past quotation quantities
  4. Market intelligence
  5. Past sales order quantities

Answer(s): A,D,E



Share your comments for SAP C_TS422_2504 exam with other users:

P
Praveen P
11/8/2023 5:18:00 AM

good content

A
Anastasiia
12/28/2023 9:06:00 AM

totally not correct answers. 21. you have one gcp account running in your default region and zone and another account running in a non-default region and zone. you want to start a new compute engine instance in these two google cloud platform accounts using the command line interface. what should you do? correct: create two configurations using gcloud config configurations create [name]. run gcloud config configurations activate [name] to switch between accounts when running the commands to start the compute engine instances.

P
Priyanka
7/24/2023 2:26:00 AM

kindly upload the dumps

N
Nabeel
7/25/2023 4:11:00 PM

still learning

G
gure
7/26/2023 5:10:00 PM

excellent way to learn

C
ciken
8/24/2023 2:55:00 PM

help so much

B
Biswa
11/20/2023 9:28:00 AM

understand sql col.

S
Saint Pierre
10/24/2023 6:21:00 AM

i would give 5 stars to this website as i studied for az-800 exam from here. it has all the relevant material available for preparation. i got 890/1000 on the test.

R
Rose
7/24/2023 2:16:00 PM

this is nice.

A
anon
10/15/2023 12:21:00 PM

q55- the ridac workflow can be modified using flow designer, correct answer is d not a

N
NanoTek3
6/13/2022 10:44:00 PM

by far this is the most accurate exam dumps i have ever purchased. all questions are in the exam. i saw almost 90% of the questions word by word.

E
eriy
11/9/2023 5:12:00 AM

i cleared the az-104 exam by scoring 930/1000 on the exam. it was all possible due to this platform as it provides premium quality service. thank you!

M
Muhammad Rawish Siddiqui
12/8/2023 8:12:00 PM

question # 232: accessibility, privacy, and innovation are not data quality dimensions.

V
Venkat
12/27/2023 9:04:00 AM

looks wrong answer for 443 question, please check and update

V
Varun
10/29/2023 9:11:00 PM

great question

D
Doc
10/29/2023 9:36:00 PM

question: a user wants to start a recruiting posting job posting. what must occur before the posting process can begin? 3 ans: comment- option e is incorrect reason: as part of enablement steps, sap recommends that to be able to post jobs to a job board, a user need to have the correct permission and secondly, be associated with one posting profile at minimum

I
It‘s not A
9/17/2023 5:31:00 PM

answer to question 72 is d [sys_user_role]

I
indira m
8/14/2023 12:15:00 PM

please provide the pdf

R
ribrahim
8/1/2023 6:05:00 AM

hey guys, just to let you all know that i cleared my 312-38 today within 1 hr with 100 questions and passed. thank you so much brain-dumps.net all the questions that ive studied in this dump came out exactly the same word for word "verbatim". you rock brain-dumps.net!!! section name total score gained score network perimeter protection 16 11 incident response 10 8 enterprise virtual, cloud, and wireless network protection 12 8 application and data protection 13 10 network défense management 10 9 endpoint protection 15 12 incident d

A
Andrew
8/23/2023 6:02:00 PM

very helpful

L
latha
9/7/2023 8:14:00 AM

useful questions

I
ibrahim
11/9/2023 7:57:00 AM

page :20 https://exam-dumps.com/snowflake/free-cof-c02-braindumps.html?p=20#collapse_453 q 74: true or false: pipes can be suspended and resumed. true. desc.: pausing or resuming pipes in addition to the pipe owner, a role that has the following minimum permissions can pause or resume the pipe https://docs.snowflake.com/en/user-guide/data-load-snowpipe-intro

F
Franklin Allagoa
7/5/2023 5:16:00 AM

i want hcia exam dumps

S
SSA
12/24/2023 1:18:00 PM

good training

B
BK
8/11/2023 12:23:00 PM

very useful

D
Deepika Narayanan
7/13/2023 11:05:00 PM

yes need this exam dumps

B
Blessious Phiri
8/15/2023 3:31:00 PM

these questions are a great eye opener

J
Jagdesh
9/8/2023 8:17:00 AM

thank you for providing these questions and answers. they helped me pass my exam. you guys are great.

T
TS
7/18/2023 3:32:00 PM

good knowledge

A
Asad Khan
11/1/2023 2:44:00 AM

answer 10 should be a because only a new project will be created & the organization is the same.

R
Raj
9/12/2023 3:49:00 PM

can you please upload the dump again

C
Christian Klein
6/23/2023 1:32:00 PM

is it legit questions from sap certifications ?

A
anonymous
1/12/2024 3:34:00 PM

question 16 should be b (changing the connector settings on the monitor) pc and monitor were powered on. the lights on the pc are on indicating power. the monitor is showing an error text indicating that it is receiving power too. this is a clear sign of having the wrong input selected on the monitor. thus, the "connector setting" needs to be switched from hdmi to display port on the monitor so it receives the signal from the pc, or the other way around (display port to hdmi).

N
NSPK
1/18/2024 10:26:00 AM

q 10. ans is d (in the target org: open deployment settings, click edit next to the source org. select allow inbound changes and save

AI Tutor 👋 I’m here to help!