Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (PP/DS)?
Answer(s): B
You can achieve planning only for specific resources in Advanced Planning (PP/DS) by using a resource group. A resource group is a collection of resources that share the same characteristics and can be used interchangeably for production. You can assign a resource group to a product or a production version, and then use the resource group as a selection criterion in the planning board or the product view. This way, you can restrict the planning to only those resources that belong to the resource group.
SAP S/4HANA Manufacturing for Planning & Scheduling - Implementation Guide, page 25; [SAP S/4HANA Production Planning and Manufacturing Certification Guide], page 79.
in your Plant, MRP is activated.which options do you have to exclude a material from the MRP run?Note: there are 2 correct answers to this question.
Answer(s): A,C
You can exclude a material from the MRP run by using a specific material status or a specific MRP type. A material status is a user-defined indicator that can be assigned to a material master record to control the procurement and planning activities for the material. For example, you can define a material status that blocks the material from being planned by MRP. An MRP type is a parameter that defines how a material is planned by MRP. For example, you can use the MRP type ND (No Planning) to exclude the material from the MRP run.
[SAP S/4HANA Production Planning and Manufacturing Certification Guide], page 87; [SAP Help Portal: Material Status] and [SAP Help Portal: MRP Type].
How can you support a GMP (Good Manufacturing Practice)-compliant production process? Note: There are 3 correct answers to this question.
Answer(s): B,C,E
To support a GMP-compliant production process, you can use the following features in SAP S/4HANA:Digital signature: This allows you to electronically sign documents and transactions that are relevant for GMP compliance, such as production orders, process orders, batch records, and quality inspections. Digital signatures ensure the authenticity, integrity, and non-repudiation of the documents and transactions.Batch record: This is a document that records the entire production process of a batch, including the materials, resources, operations, quality data, and signatures involved. Batch records provide traceability and documentation for GMP compliance3 .Recipe approval: This is a process that ensures that only approved recipes can be used for production. Recipes are approved by authorized users who sign them digitally. Recipe approval prevents unauthorized changes and ensures consistency and quality of the products .
1: SAP Help Portal: Digital Signature2: SAP S/4HANA Production Planning and Manufacturing Certification Guide, Chapter 8: ProductCompliance3: SAP Help Portal: Batch Record: SAP S/4HANA Production Planning and Manufacturing Certification Guide, Chapter 8: Product Compliance: SAP Help Portal: Recipe Approval: SAP S/4HANA Production Planning and Manufacturing Certification Guide, Chapter 7: Process Orders
Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HAN
Answer(s): C
Mode selection is a feature that allows the system to choose the best mode for an activity based on the mode priority and the available capacity of the resources. A mode is a combination of a resource and a formula that determines the duration and quantity of an activity. An operation can have multiple activities, each with multiple modes. Mode selection can be used when an operation contains several activities, each of which is assigned several modes for different resources, and the system needs to determine which resource to use for each activity. Mode selection can also be used when an activity has several modes for the same resource, and the system needs to determine which formula to use for the activity. Mode selection can be performed during the planning explosion or during the interactive planning.
Mode Selection | SAP Help Portal, Mode Selection | SAP Help Portal
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that production flow only happens in suitable and physically connected tanks? Note: There are 2 correct answers to this question.
Answer(s): B,D
A resource network is a business object in PP/DS that defines the allowed directed connections between two or more resources. A directed connection means that the connection from Resource 1to Resource 2 is not the same as the inverse connection from Resource 2 to Resource 1. You use this object to model existing production constraints more precisely, with the objective of creating a finite and technically feasible production schedule. Resource networks simplify the modeling of resource restrictions for consecutive operations or orders1A resource selection is a business object in PP/DS that defines the criteria for selecting a suitable resource for an operation or an order. You use this object to specify the characteristics, attributes, and capacities of the resources that can be used for a particular production process. Resource selection allows you to optimize the resource utilization and reduce the setup times and costs2 A resource matrix is a business object in PP/DS that defines the relationships between different resources based on their characteristics and attributes. You use this object to determine the setup times and costs for changing from one resource to another. Resource matrix allows you to model the setup effort and expense more accurately and improve the production efficiency3 A resource hierarchy is a business object in PP/DS that defines the structure and sequence of resources that are used for a production process. You use this object to represent the logical and physical dependencies of the resources and to control the scheduling and sequencing of the operations or orders. Resource hierarchy allows you to model the production flow and capacity more realistically and ensure the technical feasibility of the production plan.
Resource Network | SAP Help PortalResource Selection | SAP Help PortalResource Matrix | SAP Help Portal[Resource Hierarchy | SAP Help Portal]
Share your comments for SAP C_TS422_2023 exam with other users:
please i need dumps for isc2 cybersecuity
ans is coldline i think
very helpful
can you please provide dumps so that it helps me more
thank you for providing me with the updated question and answers. this version has all the questions from the exam. i just saw them in my exam this morning. i passed my exam today.
how i can see exam questions?
can you please upload please?
question 75: option c is correct answer
please add this exam
please upoad
has anyone recently attended safe 6.0 certification? is it the samq question from here.
expository experience
52 should be b&c. controller failure has nothing to do with this type of issue. degraded state tells us its a raid issue, and if the os is missing then the bootable device isnt found. the only other consideration could be data loss but thats somewhat broad whereas b&c show understanding of the specific issues the question is asking about.
great help!!!
very useful tools
looks a good platform to prepare az-104
want to pass the exam
good resource
question 11 : d
only the free dumps will be enough for pass, or have to purchase the premium one. please suggest.
good questions. thanks.
good for practice.
great case study
the questions in this exam dumps is valid. i passed my test last monday. i only whish they had their pricing in inr instead of usd. but it is still worth it.
q40 the answer is not d, why are you giving incorrect answers? snapshot consolidation is used to merge the snapshot delta disk files to the vm base disk
thanks, very relevant
wrong answer. it is true not false.
please i need the mo-100 questions
very good use full
very valid questions
will these question help me to clear pl-300 exam?
please provide me with these dumps questions. thanks
in the pdf downloaded is write google cloud database engineer i think that it isnt the correct exam
i think you have the answers wrong regarding question: "what are three core principles of web content accessibility guidelines (wcag)? answer: robust, operable, understandable
Keeping this site free takes real effort. We constantly battle automated scraping and unauthorized content copying. A quick account helps us protect the community and keep the site free.
To continue studying for your C_TS422_2023, please sign in or create a free account.