SAP C_IBP_2502 Exam (page: 1)
SAP Certified Associate - IBP for Supply Chain
Updated on: 31-Mar-2026

Viewing Page 1 of 11

How many different time levels can be selected within one planning view?

  1. Only time levels from the base planning level of selected key figures
  2. All time levels available in the time profile, restricted by global configuration parameter
  3. All time levels available in the time profile
  4. The number of time levels is restricted to four to avoid negative effects on performance

Answer(s): B



You need to define a new logic for a key figure to drive values from the PERPRODCUSTREGION level to the PERPRODCUST level.
Which of the following configuration options are possible for this process?
Note: There are 2 correct answers to this question

  1. Splitting the values from detailed to aggregated level by using a copy operator
  2. Splitting the values from aggregated to detailed level using multiplication by the proportions
  3. Splitting the values form aggregated to detailed level, based on the time profile attribute
  4. Splitting the values from aggregated to detailed level, based on a stored split-factor key figure

Answer(s): B,D



You are setting up planning with lot sizes.
What are some of the properties of lot sizes that you need to beware of?
Note: There are 2 correct answers to this question

  1. Lot sizes are applicable for production and handling quantities.
  2. Periodic lot size setting overrides the minimum lot size.
  3. Lot size are time-independent master data settings
  4. Lot size are applicable for production and transportation quantities

Answer(s): C,D



You need to work in two separate sessions for two different SAP IBP tenants.
What can help you differentiate the appearance of their user interfaces?
Note: There are 2 correct answers to this question

  1. Define a different default planning area via the User Preferences
  2. Have a different set to tiles in the Home group of apps
  3. Set a separate theme for the Home page in the Web UI.
  4. Add the system name and tenant information from the About section to the Home pages

Answer(s): B,C



Which Master Data Types are used in time-series-based planning within SAP IBP for response and supply?
Note: There are 3 correct answers to this question

  1. DS Order fulfilment
  2. Transportation lane
  3. Customer
  4. Location
  5. Product

Answer(s): C,D,E



You are implementing a demand process in SAP IBP for sales and operations, and consider using the standard forecast key figures available in the sample planning area SAPIBP1.
What are the first and last key figures in the logical progression of demand in the S&OP process?

  1. Local Demand Plan first and Combined Final Demand last
  2. Statistical Forecast Qty first and Consensus Demand Plan Qty last
  3. Local Demand Plan first and Consensus Demand Plan Qty last
  4. Statistical Forecast Qty first and Global Demand Plan Qty for SOP last

Answer(s): A



What does ABC/XYZ segmentation allow you to do?
Note: There are 2 correct answers to this question

  1. Substitute missing values in case of sporadic demands.
  2. Choose time-independent key figures as segmentation measures
  3. Identify inventory items that quire closer attentions
  4. Use forecasting algorithms that are specific to seasonal demands of SKUs in the segment "B"

Answer(s): B,C



Which processes are running in sampl to this question.

  1. Supply and Allocation Planning
  2. Inventory Optimization
  3. Response Planning
  4. Demand Sensing
  5. Sales and Operation planning

Answer(s): B,D,E



Viewing Page 1 of 11



Share your comments for SAP C_IBP_2502 exam with other users:

Stephen 8/4/2023 9:08:00 PM

please upload cima e2 managing performance dumps
Anonymous


hp 6/16/2023 12:44:00 AM

wonderful questions
Anonymous


Priyo 11/14/2023 2:23:00 AM

i used this site since 2000, still great to support my career
INDONESIA


Jude 8/29/2023 1:56:00 PM

why is the answer to "which of the following is required by scrum?" all of the following stated below since most of them are not mandatory? sprint retrospective. members must be stand up at the daily scrum. sprint burndown chart. release planning.
UNITED STATES


Marc blue 9/15/2023 4:11:00 AM

great job. hope this helps out.
UNITED STATES


Anne 9/13/2023 2:33:00 AM

upload please. many thanks!
Anonymous


pepe el toro 9/12/2023 7:55:00 PM

this is so interesting
Anonymous


Antony 11/28/2023 12:13:00 AM

great material thanks
AUSTRALIA


Thembelani 5/30/2023 2:22:00 AM

anyone who wrote this exam recently
Anonymous


P 9/16/2023 1:27:00 AM

ok they re good
Anonymous


Jorn 7/13/2023 5:05:00 AM

relevant questions
UNITED KINGDOM


AM 6/20/2023 7:54:00 PM

please post
UNITED STATES


Nagendra Pedipina 7/13/2023 2:22:00 AM

q:42 there has to be a image in the question to choose what does it mean from the options
INDIA


BrainDumpee 11/18/2023 1:36:00 PM

looking for cphq dumps, where can i find these for free? please and thank you.
UNITED STATES


sheik 10/14/2023 11:37:00 AM

@aarun , thanks for the information. it would be great help if you share your email
Anonymous


Random user 12/11/2023 1:34:00 AM

1z0-1078-23 need this dumps
Anonymous


labuschanka 11/16/2023 6:06:00 PM

i gave the microsoft azure az-500 tests and prepared from this site as it has latest mock tests available which helped me evaluate my performance and score 919/1000
Anonymous


Marianne 10/22/2023 11:57:00 PM

i cannot see the button to go to the questions
Anonymous


sushant 6/28/2023 4:52:00 AM

good questions
EUROPEAN UNION


A\MAM 6/27/2023 5:17:00 PM

q-6 ans-b correct. https://docs.paloaltonetworks.com/pan-os/9-1/pan-os-cli-quick-start/use-the-cli/commit-configuration-changes
UNITED STATES


unanimous 12/15/2023 6:38:00 AM

very nice very nice
Anonymous


akminocha 9/28/2023 10:36:00 AM

please help us with 1z0-1107-2 dumps
INDIA


Jefi 9/4/2023 8:15:00 AM

please upload the practice questions
Anonymous


Thembelani 5/30/2023 2:45:00 AM

need this dumps
Anonymous


Abduraimov 4/19/2023 12:43:00 AM

preparing for this exam is overwhelming. you cannot pass without the help of these exam dumps.
UNITED KINGDOM


Puneeth 10/5/2023 2:06:00 AM

new to this site but i feel it is good
EUROPEAN UNION


Ashok Kumar 1/2/2024 6:53:00 AM

the correct answer to q8 is b. explanation since the mule app has a dependency, it is necessary to include project modules and dependencies to make sure the app will run successfully on the runtime on any other machine. source code of the component that the mule app is dependent of does not need to be included in the exported jar file, because the source code is not being used while executing an app. compiled code is being used instead.
Anonymous


Merry 7/30/2023 6:57:00 AM

good questions
Anonymous


VoiceofMidnight 12/17/2023 4:07:00 PM

Delayed the exam until December 29th.
UNITED STATES


Umar Ali 8/29/2023 2:59:00 PM

A and D are True
Anonymous


vel 8/28/2023 9:17:09 AM

good one with explanation
Anonymous


Gurdeep 1/18/2024 4:00:15 PM

This is one of the most useful study guides I have ever used.
CANADA