A reward can only be effective if it is:

  1. Given immediately after the project is completed.
  2. Something that is tangible.
  3. Formally given during project performance appraisals.
  4. Satisfying a need valued by the individual.

Answer(s): D



Which tool or technique allows a large number of ideas to be classified into groups for review and analysis?

  1. Nominal group technique
  2. Idea/mind mapping
  3. Affinity diagram
  4. Brainstorming

Answer(s): C

Explanation:

5.2.2.4 Group Creativity Techniques
Several group activities can be organized to identify project and product requirements. Some of the group creativity techniques that can be used are:

Brainstorming. A technique used to generate and collect multiple ideas related to project and product requirements. Although brainstorming by itself does not include voting or prioritization, it is often used with other group creativity techniques that do.
Nominal group technique. A technique that enhances brainstorming with a voting process used to rank the most useful ideas for further brainstorming or for prioritization.
Idea/mind mapping. A technique in which ideas created through individual brainstorming sessions are consolidated into a single map to reflect commonality and differences in understanding, and generate new ideas.

Affinity diagram. A technique that allows large numbers of ideas to be classified into groups for review and analysis.

Multicriteria decision analysis. A technique that utilizes a decision matrix to provide a systematic analytical approach for establishing criteria, such as risk levels, uncertainty, and valuation, to evaluate and rank many ideas.



Using values such as scope, cost, budget, and duration or measures of scale such as size, weight, and complexity from a previous similar project as the basis for estimating the same parameter or measurement for a current project describes which type of estimating?

  1. Bottom-up
  2. Parametric
  3. Analogous
  4. Three-point

Answer(s): C



Sending letters, memos, reports, emails, and faxes to share information is an example of which type of communication?

  1. Direct
  2. Interactive
  3. Pull
  4. Push

Answer(s): D

Explanation:

10.1.2.4 Communication Methods
There are several communication methods that are used to share information among project stakeholders. These methods are broadly classified as follows:
Interactive communication. Between two or more parties performing a multidirectional exchange of information. It is the most efficient way to ensure a common understanding by all participants on specified topics, and includes meetings, phone calls, instant messaging, video conferencing, etc.
Push communication. Sent to specific recipients who need to receive the information. This ensures that the information is distributed but does not ensure that it actually reached or was understood by the intended audience. Push communications include letters, memos, reports, emails, faxes, voice mails, blogs, press releases, etc.
Pull communication. Used for very large volumes of information, or for very large audiences, and requires the recipients to access the communication content at their own discretion. These methods include intranet sites, e-learning, lessons learned databases, knowledge repositories, etc.
The choices of communication methods that are used for a project may need to be discussed and agreed upon by the project stakeholders based on communication requirements; cost and time constraints; and familiarity and availability of the required tools and resources that may be applicable to the communications process.



Which earned value management (EVM) metric is a measure of the cost efficiency of budgeted resources expressed as a ratio of earned value (EV) to actual cost (AC) and is considered a critical EVM metric?

  1. Cost variance (CV)
  2. Cost performance index (CPI)
  3. Budget at completion (BAC)
  4. Variance at completion (VAC)

Answer(s): B

Explanation:

CPI = EV / AC