Test Estimation should consider all the factors that can influence the cost, effort, and duration of the testing activities. These factors include:

  1. Size of the system to be tested
  2. Process factors, including the Test Strategy, Development or Maintenance lifecycle and Process maturity
  3. The complexity of the process, technology, organization, number of testing stakeholders, composition and location of sub-teams
  4. All of the above
  5. None of the above
    F) Only A and B are true.

Answer(s): D



One of the stakeholders wants to have an insight into the defects. You, a Test Manager has required to breakdown the defects. In which categories will you breakdown the defects? Select the best 3.

  1. Root cause
  2. Severity
  3. Priority
  4. Modules / Units of application
  5. Resources who submitted the defects
    F) Mean time of failure.

Answer(s): A,B,C



As a Test Manager, you want to establish a well-defined method to measure the cost of quality. Which of the 2 categories you would consider to calculate it?

  1. Cost of Internal Failure
  2. Cost of Tools
  3. Cost of Prevention
  4. Cost of Training Resources
  5. Cost of External Audits

Answer(s): A,C



You are the Test Manager of an organization that designs medical systems for a USA based hospital. You and your team are required to design the Test Strategy based on some standards. Which of the below standards will you consider while designing your strategy?

  1. ISO 12207
  2. IEEE1028
  3. U.S. Food and Drug Administration’s Title 21 CFR Part 820 [FDA21]
  4. All the above
  5. Only option C

Answer(s): D



The Testing Maturity Model integration (TMMi) is composed of five maturity levels and is intended to complement CMMI. Which among the following options is the correct TMMi level?

  1. Initial, Defined, Managed, Measured, Optimized.
  2. Initial, Managed, Defined, Measured, Optimized.
  3. Initial, Measured, Defined, Managed, Optimized.
  4. Initial, Optimized, Measured, Defined, Managed

Answer(s): B



Share your comments for ISTQB CTAL exam with other users:

A
akminocha
9/28/2023 10:36:00 AM

please help us with 1z0-1107-2 dumps

J
Jefi
9/4/2023 8:15:00 AM

please upload the practice questions

T
Thembelani
5/30/2023 2:45:00 AM

need this dumps

A
Abduraimov
4/19/2023 12:43:00 AM

preparing for this exam is overwhelming. you cannot pass without the help of these exam dumps.

P
Puneeth
10/5/2023 2:06:00 AM

new to this site but i feel it is good

A
Ashok Kumar
1/2/2024 6:53:00 AM

the correct answer to q8 is b. explanation since the mule app has a dependency, it is necessary to include project modules and dependencies to make sure the app will run successfully on the runtime on any other machine. source code of the component that the mule app is dependent of does not need to be included in the exported jar file, because the source code is not being used while executing an app. compiled code is being used instead.

M
Merry
7/30/2023 6:57:00 AM

good questions

V
VoiceofMidnight
12/17/2023 4:07:00 PM

Delayed the exam until December 29th.

U
Umar Ali
8/29/2023 2:59:00 PM

A and D are True

V
vel
8/28/2023 9:17:09 AM

good one with explanation

G
Gurdeep
1/18/2024 4:00:15 PM

This is one of the most useful study guides I have ever used.

AI Tutor 👋 I’m here to help!