One drawback of business process reengineering BPR), sometimes referred to as business process analysis, is:

  1. Improved efficiency in the business processes analyzed.
  2. Excess of cast over the benefit.
  3. Reduction of operational efficiency.
  4. Employee resistance to change.

Answer(s): D

Explanation:

Business process reengineering BPR), or business process analysis, involves process innovation and process redesign. Instead of improving existing procedures, it finds new ways of doing things. One major drawback of BPR is that employees may be resistant due to fear of layoffs, being replaced, or insecurity about new required skills or tasks that the employee now has to perform.



Heniser Pet Foods manufactures two products, X. and Y. The unit contribution margins for
Products X. and Y are US $30 and US $50, respectively. Each product uses Materials A and

  1. Product uses 6 pounds of Material A and 12 pounds of Material B. Product Y uses 12 pounds of Material A and 8 pounds of Material B. The company can purchase only 1,200 pounds of Material A and 1,760 pounds of Material B. The optimal mix of products to manufacture is:
  2. 146 units of and 0 units of Y.
  3. 0 units of X and 100 units of Y.
  4. 120 units of and 40 units of Y.
  5. 40 units of X. and 120 units of Y.

Answer(s): C

Explanation:

Linear programming is a technique used to maximize a contribution margin function or to minimize a cost function, subject to constraints such as scarce resources or minimum/maximum levels of production. Thus, linear programming is often used for planning resource allocations. In this problem, the equation to be maximized, called the objective function, is: U3 $30)K+ $50Y. This equation is to be maximized subject to the constraints on materials. The two constraint functions are:
Material A: 6X + 12Y < 1,200
Material B: I 2X + 8Y < 1,760
One way to solve this problem is to graph the constraint lines and determine the feasible area. The optimal production level is at an extreme point within the feasible area. The graph shows that a production level of 120 units of and 40 units of Y is a feasible production level that maximizes the contribution margin.



Dale has 20 days to complete production of an order for an important customer. The customer wants 96 units of product that may be painted either red or white. The red units can be produced at a rate of 4 per day. The white units, because of a different quality of paint, can be produced at a rate of 7 per day. The materials for the red units cost US $80 each, while the white units cost US $120 each. Dale wants to keep costs at a minimum.
What is the constraint that expresses the number of units to be produced?

  1. 4R + 7W = 20
  2. R 4) + W = 7) <20
  3. R + W = 20
  4. 4R + 7W = 96

Answer(s): B

Explanation:

The constraint function that expresses the number of units to be produced is R + W = --I 96, but that is not one of the answer choices. Another constraint is that the total quantities of red R) and white W) units must be produced in 20 or fewer days at a rate of 4 red units per day and 7 white units per day. Thus, the time constraint is R - 4) + W - 7) 20.



The data below were gathered on two different machine centers and two products.

Which item below would be part of a linear programming formulation of this problem?

  1. Maximize: Contribution > 4A + 5B.
  2. Subject to: A < O.
  3. Subject to: 2.5A + 4B < 60.
  4. Subject to: 4A + 5B < 130.

Answer(s): C

Explanation:

The linear programming solution is subject to constraints on the availability of machine hours in both centers. For example, products A and B require 2.5 and 4 hours per unit, respectively, in Machine Center 1, but only 60 hours are available. Hence, the optimal production of A and B to the following constraint:
2.5 A + 4B < 60



A firm must decide the mix of production of Product X and Product Y. There are only two resources used in the two products, resources A and B. Data related to the two products is given in the following table:


What is the appropriate objective function to maximize profit?

  1. 3X + 7Y
  2. 2X+Y
  3. 8X + 6Y
  4. 5X + 8Y

Answer(s): C

Explanation:

The objective function is the function to be optimized. This firm wishes to maximize profits on the sales of two products X and Y). Based on profits per unit US $8 and US $6, respectively), the objective function is 8X + 6Y.



Share your comments for IIA IIA-CIA-Part3 exam with other users:

H
hik
1/19/2024 1:47:00 PM

good content

B
Blessious Phiri
8/15/2023 2:18:00 PM

pdb and cdb are critical to the database

Z
Zuned
10/22/2023 4:39:00 AM

till 104 questions are free, lets see how it helps me in my exam today.

M
Muhammad Rawish Siddiqui
12/3/2023 12:11:00 PM

question # 56, answer is true not false.

A
Amaresh Vashishtha
8/27/2023 1:33:00 AM

i would be requiring dumps to prepare for certification exam

A
Asad
9/8/2023 1:01:00 AM

very helpful

B
Blessious Phiri
8/13/2023 3:10:00 PM

control file is the heart of rman backup

S
Senthil
9/19/2023 5:47:00 AM

hi could you please upload the ibm c2090-543 dumps

H
Harry
6/27/2023 7:20:00 AM

appriciate if you could upload this again

A
Anonymous
7/10/2023 4:10:00 AM

please upload the dump

R
Raja
6/20/2023 5:30:00 AM

i found some questions answers mismatch with explanation answers. please properly update

D
Doora
11/30/2023 4:20:00 AM

nothing to mention

D
deally
1/19/2024 3:41:00 PM

knowable questions

S
Sonia
7/23/2023 4:03:00 PM

very helpfull

B
binEY
10/6/2023 5:15:00 AM

good questions

N
Neha
9/28/2023 1:58:00 PM

its helpful

D
Desmond
1/5/2023 9:11:00 PM

i just took my oracle exam and let me tell you, this exam dumps was a lifesaver! without them, iam not sure i would have passed. the questions were tricky and the answers were obscure, but the exam dumps had everything i needed. i would recommend to anyone looking to pass their oracle exams with flying colors (and a little bit of cheating) lol.

D
Davidson OZ
9/9/2023 6:37:00 PM

22. if you need to make sure that one computer in your hot-spot network can access the internet without hot-spot authentication, which menu allows you to do this? answer is ip binding and not wall garden. wall garden allows specified websites to be accessed with users authentication to the hotspot

3
381
9/2/2023 4:31:00 PM

is question 1 correct?

L
Laurent
10/6/2023 5:09:00 PM

good content

S
Sniper69
5/9/2022 11:04:00 PM

manged to pass the exam with this exam dumps.

D
Deepak
12/27/2023 2:37:00 AM

good questions

D
dba
9/23/2023 3:10:00 AM

can we please have the latest exam questions?

P
Prasad
9/29/2023 7:27:00 AM

please help with jn0-649 latest dumps

G
GTI9982
7/31/2023 10:15:00 PM

please i need this dump. thanks

E
Elton Riva
12/12/2023 8:20:00 PM

i have to take the aws certified developer - associate dva-c02 in the next few weeks and i wanted to know if the questions on your website are the same as the official exam.

B
Berihun Desalegn Wonde
7/13/2023 11:00:00 AM

all questions are more important

G
gr
7/2/2023 7:03:00 AM

ques 4 answer should be c ie automatically recover from failure

R
RS
7/27/2023 7:17:00 AM

very very useful page

B
Blessious Phiri
8/12/2023 11:47:00 AM

the exams are giving me an eye opener

A
AD
10/22/2023 9:08:00 AM

3rd so far, need to cover more

M
Matt
11/18/2023 2:32:00 AM

aligns with the pecd notes

S
Sri
10/15/2023 4:38:00 PM

question 4: b securityadmin is the correct answer. https://docs.snowflake.com/en/user-guide/security-access-control-overview#access-control-framework

H
H.T.M. D
6/25/2023 2:55:00 PM

kindly please share dumps

AI Tutor 👋 I’m here to help!