In a theory of constraints (TOC) analysis, the bottleneck operation (the constraint) corresponds to which part of the drum-buffer-rope model?

  1. Drum.
  2. Buffer.
  3. Rope.
  4. No part of TOC analysis corresponds to the drum-buffer-rope model.

Answer(s): B

Explanation:

Production flow through a constraint is managed using the drum-buffer-rope (DBR) system. The drum (i.e., the beat to which a production process marches) is the bottleneck operation. The constraint sets the pace for the entire process. The buffer is a minimal amount of work-in-process input to the drum that is maintained to ensure that it is always in operation. The rope is the sequence of activities preceding and including the bottleneck operation that must be coordinated to avoid inventory buildup.



The process model used in a theory of constraints (TOC) analysis is called:

  1. Just-in-time.
  2. Drum-buffer-rope.
  3. Materials requirements planning.
  4. Lean production.

Answer(s): B

Explanation:

Production flow through a constraint is managed using the drum-buffer-rope (DBR) system. The drum (i.e.. the beat to which a production process marches) is the bottleneck operation. The constraint sets the pace for the entire process. The buffer is a minimal amount of work-in-process input to the drum that is maintained to ensure that it is always in operation. The rope is the sequence of activities preceding and including the bottleneck operation that must be coordinated to avoid inventory buildup.



The following steps make up the stages of a theory of constraints (TOC) analysis.

I). Determine the most profitable product mix given the constraint.
II). Increase capacity at the constraint.
Ill). Identify the constraint.
IV). Redesign the manufacturing process.
V). Maximize the flow through the constraint.

If executed in the correct order, the sequence is

  1. III). I, II). V, IV
  2. III). II, I). V, IV
  3. III). II, I). IV, V
  4. III). I, V, II, IV

Answer(s): D

Explanation:

The steps in a TOC analysis are (1) identify the constraint. (2) determine the most profitable product mix given the constraint, (3) maximize the flow through the constraint, (4) increase capacity at the constraint, and (5) redesign the manufacturing process for greater flexibility and speed.



A manufacturer can sell its single product for US $660. Below are the cost data for the product:
Direct materials US$170
Direct labor 225
Manufacturing overhead 90
The relevant margin amount when beginning a theory of constraints (TOC) analysis is:

  1. US$490
  2. US$345
  3. US$265
  4. US$175

Answer(s): A

Explanation:

A theory of constraints (TOC) analysis proceeds from the assumption that only direct materials costs are truly variable in the short run. This is called throughput, or super variable, costing. The relevant margin amount is throughput margin, which equals price minus direct materials. Thus, the relevant margin amount for this manufacturer is US $490 (US $660-US $170).



Below are data concerning the hours spent by a manufacturer's two products in its two processes.


The constraint is:

  1. Product
  2. Product B in Assembly.
  3. The assembly activity.
  4. Cannot be determined from the information given.

Answer(s): C

Explanation:

In theory of constraints (TOC) analysis, the constraint (bottleneck) operation is the slowest part of the process. It can usually be identified as the one where work-in-process backs up the most of this manufacturer's two operations, the one that requires the most total time is assembly.



Share your comments for IIA IIA-CIA-PART3-3P exam with other users:

I
indira m
8/14/2023 12:15:00 PM

please provide the pdf

R
ribrahim
8/1/2023 6:05:00 AM

hey guys, just to let you all know that i cleared my 312-38 today within 1 hr with 100 questions and passed. thank you so much brain-dumps.net all the questions that ive studied in this dump came out exactly the same word for word "verbatim". you rock brain-dumps.net!!! section name total score gained score network perimeter protection 16 11 incident response 10 8 enterprise virtual, cloud, and wireless network protection 12 8 application and data protection 13 10 network défense management 10 9 endpoint protection 15 12 incident d

A
Andrew
8/23/2023 6:02:00 PM

very helpful

L
latha
9/7/2023 8:14:00 AM

useful questions

I
ibrahim
11/9/2023 7:57:00 AM

page :20 https://exam-dumps.com/snowflake/free-cof-c02-braindumps.html?p=20#collapse_453 q 74: true or false: pipes can be suspended and resumed. true. desc.: pausing or resuming pipes in addition to the pipe owner, a role that has the following minimum permissions can pause or resume the pipe https://docs.snowflake.com/en/user-guide/data-load-snowpipe-intro

F
Franklin Allagoa
7/5/2023 5:16:00 AM

i want hcia exam dumps

S
SSA
12/24/2023 1:18:00 PM

good training

B
BK
8/11/2023 12:23:00 PM

very useful

D
Deepika Narayanan
7/13/2023 11:05:00 PM

yes need this exam dumps

B
Blessious Phiri
8/15/2023 3:31:00 PM

these questions are a great eye opener

J
Jagdesh
9/8/2023 8:17:00 AM

thank you for providing these questions and answers. they helped me pass my exam. you guys are great.

T
TS
7/18/2023 3:32:00 PM

good knowledge

A
Asad Khan
11/1/2023 2:44:00 AM

answer 10 should be a because only a new project will be created & the organization is the same.

R
Raj
9/12/2023 3:49:00 PM

can you please upload the dump again

C
Christian Klein
6/23/2023 1:32:00 PM

is it legit questions from sap certifications ?

A
anonymous
1/12/2024 3:34:00 PM

question 16 should be b (changing the connector settings on the monitor) pc and monitor were powered on. the lights on the pc are on indicating power. the monitor is showing an error text indicating that it is receiving power too. this is a clear sign of having the wrong input selected on the monitor. thus, the "connector setting" needs to be switched from hdmi to display port on the monitor so it receives the signal from the pc, or the other way around (display port to hdmi).

N
NSPK
1/18/2024 10:26:00 AM

q 10. ans is d (in the target org: open deployment settings, click edit next to the source org. select allow inbound changes and save

M
mohamed abdo
9/1/2023 4:59:00 AM

very useful

T
Tom
3/18/2022 8:00:00 PM

i purchased this exam dumps from another website with way more questions but they were all invalid and outdate. this exam dumps was right to the point and all from recent exam. it was a hard pass.

E
Edrick GOP
10/24/2023 6:00:00 AM

it was a good experience and i got 90% in the 200-901 exam.

A
anonymous
8/10/2023 2:28:00 AM

hi please upload this

B
Bakir
7/6/2023 7:24:00 AM

please upload it

A
Aman
6/18/2023 1:27:00 PM

really need this dump. can you please help.

N
Neela Para
1/8/2024 6:39:00 PM

really good and covers many areas explaining the answer.

K
Karan Patel
8/15/2023 12:51:00 AM

yes, can you please upload the exam?

N
NISHAD
11/7/2023 11:28:00 AM

how many questions are there in these dumps?

P
Pankaj
7/3/2023 3:57:00 AM

hi team, please upload this , i need it.

D
DN
9/4/2023 11:19:00 PM

question 14 - run terraform import: this is the recommended best practice for bringing manually created or destroyed resources under terraform management. you use terraform import to associate an existing resource with a terraform resource configuration. this ensures that terraform is aware of the resource, and you can subsequently manage it with terraform.

Z
Zhiguang
8/19/2023 11:37:00 PM

please upload dump. thanks in advance.

D
deedee
12/23/2023 5:51:00 PM

great great

A
Asad Khan
11/1/2023 3:10:00 AM

answer 16 should be b your organizational policies require you to use virtual machines directly

S
Sale Danasabe
10/24/2023 5:21:00 PM

the question are kind of tricky of you didnt get the hnag on it.

L
Luis
11/16/2023 1:39:00 PM

can anyone tell me if this is for rhel8 or rhel9?

H
hik
1/19/2024 1:47:00 PM

good content

AI Tutor 👋 I’m here to help!