In a theory of constraints (TOC) analysis, the bottleneck operation (the constraint) corresponds to which part of the drum-buffer-rope model?
Answer(s): B
Production flow through a constraint is managed using the drum-buffer-rope (DBR) system. The drum (i.e., the beat to which a production process marches) is the bottleneck operation. The constraint sets the pace for the entire process. The buffer is a minimal amount of work-in-process input to the drum that is maintained to ensure that it is always in operation. The rope is the sequence of activities preceding and including the bottleneck operation that must be coordinated to avoid inventory buildup.
The process model used in a theory of constraints (TOC) analysis is called:
Production flow through a constraint is managed using the drum-buffer-rope (DBR) system. The drum (i.e.. the beat to which a production process marches) is the bottleneck operation. The constraint sets the pace for the entire process. The buffer is a minimal amount of work-in-process input to the drum that is maintained to ensure that it is always in operation. The rope is the sequence of activities preceding and including the bottleneck operation that must be coordinated to avoid inventory buildup.
The following steps make up the stages of a theory of constraints (TOC) analysis.I). Determine the most profitable product mix given the constraint.II). Increase capacity at the constraint.Ill). Identify the constraint.IV). Redesign the manufacturing process.V). Maximize the flow through the constraint.If executed in the correct order, the sequence is
Answer(s): D
The steps in a TOC analysis are (1) identify the constraint. (2) determine the most profitable product mix given the constraint, (3) maximize the flow through the constraint, (4) increase capacity at the constraint, and (5) redesign the manufacturing process for greater flexibility and speed.
A manufacturer can sell its single product for US $660. Below are the cost data for the product:Direct materials US$170Direct labor 225Manufacturing overhead 90The relevant margin amount when beginning a theory of constraints (TOC) analysis is:
Answer(s): A
A theory of constraints (TOC) analysis proceeds from the assumption that only direct materials costs are truly variable in the short run. This is called throughput, or super variable, costing. The relevant margin amount is throughput margin, which equals price minus direct materials. Thus, the relevant margin amount for this manufacturer is US $490 (US $660-US $170).
Below are data concerning the hours spent by a manufacturer's two products in its two processes.The constraint is:
Answer(s): C
In theory of constraints (TOC) analysis, the constraint (bottleneck) operation is the slowest part of the process. It can usually be identified as the one where work-in-process backs up the most of this manufacturer's two operations, the one that requires the most total time is assembly.
Share your comments for Financial CIA-III exam with other users:
very helpful
good info about oml
very useful to practice
this website is very helpful.
good content
so challenging
17 should be d ,for morequery its scale out
nice question
yes.
good mateial
good practice exam
impressivre qustion
questions seem helpful
question 21 answer is alerts
am preparing for exam
good one thanks
only got thru 5 questions, need more to evaluate
q26 should be b
the aaa triad in information security is authentication, accounting and authorisation so the answer should be d 1, 3 and 5.
need to attend this
these are free brain dumps i understand, how can one get free pdf
provide access
good morning
please upload the ncp-mci 6.5 dumps, really need to practice this one. thanks guys
question 16: https://help.salesforce.com/s/articleview?id=sf.care_console_overview.htm&type=5
yes i m prepared exam
my experience was great with this site as i studied for the ms-900 from here and got 900/1000 on the test. my main focus was on the tutorials which were provided and practice questions. thanks!
great course
very good question
question: 93 which statement is true regarding the result? sales contain 6 columns and values contain 7 columns so c is not right answer.
highly recommend just passed my exam.
great practice! thanks
anyone who wrote this exam recently?