A Dell EMC Avamar backup administrator is running a Backend Capacity Report for several of their large backup clients.
What is a consideration when viewing the report?

  1. Forecast estimates may underestimate growth due to using a linear regression method.
  2. Some of the capacity shown may represent data used by other clients.
  3. Both pre-deduplication and post-deduplication total GBs are displayed.
  4. A report should be run separately for each client to get an accurate view of the total Avamar server capacity utilized.

Answer(s): C



A Dell EMC Avamar administrator is performing backups of a physical Microsoft Exchange server to an integrated Data Domain. Since the Exchange server is remote, they are concerned about meeting the RTO.
What should be done to decrease restore times?

  1. Restore from a replicated Data Domain
  2. Use the ­ddr-compressed-restore flag
  3. Use the Instant Access feature
  4. Disable encryption on restores

Answer(s): A



A backup administrator is looking for advice on how to achieve a steady state condition for their multi-node Dell EMC Avamar server with five storage nodes.
What is the approximate amount of storage that garbage collection should free up at steady state?

  1. 5 GB per hour for the Avamar server
  2. 10 GB per node per hour
  3. 15 GB per hour for the Avamar server
  4. 20 GB per node per hour

Answer(s): B



You are asked to implement a Dell EMC Avamar solution for a Microsoft Exchange 2010 environment. The Exchange 2010 server has three mailbox databases running circular logging mode.
What is a consideration for this implementation?

  1. Incremental backup is not supported for this implementation
  2. Full, Incremental, and Differential backups are supported
  3. Old transaction logs are truncated after Incremental backup
  4. There is no limit on the maximum number of transaction log files

Answer(s): A



A Dell EMC Avamar has been performing image backups of a VMware virtual machine (VM) running SLES. The backup administrator has decided to change the backup strategy of this VM to use guest backups instead.
What is required for successful guest backups to occur?

  1. Avamar client software must be installed on the vCenter server
  2. A proxy server must be deployed on the ESXi server
  3. VMware Tools must be installed
  4. The VM needs a network connection

Answer(s): A



Dell EMC Avamar client backup/restore performance depends on what factors?

  1. Average file size, client CPU, RAM, I/O capability, and network connection between client and Avamar server
  2. Average file size, disk space on client, RAM, I/O capability, and network connection between client and Avamar server
  3. Client CPU, RAM, I/O capability only
  4. Average file size, client CPU, I/O capability only

Answer(s): B



A customer has two Microsoft SQL servers that are backed up by Dell EMC Avamar. Both servers are running on the same SQL server version and have the same Avamar client version installed. The customer tries to perform a database restore to the other database server. However, the restore fails 10 seconds after initializing.
What should be done to correct this issue?

  1. Bring the database offline before starting the restore
  2. Set the "Point-in-time" recover mode to `None'
  3. mark the "Use SQL REPLACE" option
  4. Unmark the "Tail-Log Backup" option

Answer(s): B



What is a characteristic of a dell EMC Avamar "restore only" restore of a DB2 database?

  1. Only rolls the database forward to a point-in-time
  2. Must manually roll database forward to point-in-time
  3. Restores and rolls forward the database
  4. Restores only the archive logs

Answer(s): A



Viewing Page 4 of 34



Share your comments for EMC E20-895 exam with other users:

sheik 10/14/2023 11:37:00 AM

@aarun , thanks for the information. it would be great help if you share your email
Anonymous


Random user 12/11/2023 1:34:00 AM

1z0-1078-23 need this dumps
Anonymous


labuschanka 11/16/2023 6:06:00 PM

i gave the microsoft azure az-500 tests and prepared from this site as it has latest mock tests available which helped me evaluate my performance and score 919/1000
Anonymous


Marianne 10/22/2023 11:57:00 PM

i cannot see the button to go to the questions
Anonymous


sushant 6/28/2023 4:52:00 AM

good questions
EUROPEAN UNION


A\MAM 6/27/2023 5:17:00 PM

q-6 ans-b correct. https://docs.paloaltonetworks.com/pan-os/9-1/pan-os-cli-quick-start/use-the-cli/commit-configuration-changes
UNITED STATES


unanimous 12/15/2023 6:38:00 AM

very nice very nice
Anonymous


akminocha 9/28/2023 10:36:00 AM

please help us with 1z0-1107-2 dumps
INDIA


Jefi 9/4/2023 8:15:00 AM

please upload the practice questions
Anonymous


Thembelani 5/30/2023 2:45:00 AM

need this dumps
Anonymous


Abduraimov 4/19/2023 12:43:00 AM

preparing for this exam is overwhelming. you cannot pass without the help of these exam dumps.
UNITED KINGDOM


Puneeth 10/5/2023 2:06:00 AM

new to this site but i feel it is good
EUROPEAN UNION


Ashok Kumar 1/2/2024 6:53:00 AM

the correct answer to q8 is b. explanation since the mule app has a dependency, it is necessary to include project modules and dependencies to make sure the app will run successfully on the runtime on any other machine. source code of the component that the mule app is dependent of does not need to be included in the exported jar file, because the source code is not being used while executing an app. compiled code is being used instead.
Anonymous


Merry 7/30/2023 6:57:00 AM

good questions
Anonymous


VoiceofMidnight 12/17/2023 4:07:00 PM

Delayed the exam until December 29th.
UNITED STATES


Umar Ali 8/29/2023 2:59:00 PM

A and D are True
Anonymous


vel 8/28/2023 9:17:09 AM

good one with explanation
Anonymous


Gurdeep 1/18/2024 4:00:15 PM

This is one of the most useful study guides I have ever used.
CANADA