Within the relevant range, a variable cost is a cost which:
Answer(s): B
CORRECT TEXT Refer to the exhibit.Patchit Limited operates a job costing system. They have been asked to quote for a rush job that will require to be done in overtime hours. It is estimated that the job will incur the following costs:Production overheads are absorbed on a direct labour hour basis. Budgeted direct labour hours for the year were 50,000 and budgeted direct labour cost was $300,000.If production overheads had been based on a percentage of direct labour cost, the revised production costs for the job would be:
Answer(s): A
In order to provide information that is suitable for control purposes, the budget must be:
Answer(s): C
CORRECT TEXT C Ltd produces a chemical in a single process. Information for this process last month is as follows:(a) Opening work in progress - 10000 kg valued at £10000 for direct material and £7500 for conversion costs.(b) Materials input - 25000 kg at £1.10 per kg.(c) Conversion costs - £17000(d) Output during the month - 23000 kg.(e) There were 7500 units of closing work in progress which was complete as to materials and 30% complete as to conversion.(f) Normal loss for the month was 10% of input and all losses have a scrap value of 80p per kg.What was the value of normal loss during the month?
Which of the following best describes a step cost?
Share your comments for CIMA CIMAPRA17-BA2-1 exam with other users:
good one with explanation
This is one of the most useful study guides I have ever used.