CIMA BA2 Exam (page: 15)
CIMA Fundamentals of Management Accounting
Updated on: 09-Feb-2026

Viewing Page 15 of 80

Within the relevant range, a variable cost is a cost which:

  1. cannot be forecast with any degree of accuracy because of its variability.
  2. varies in total in proportion to the level of activity.
  3. varies per unit in proportion to the level of activity.
  4. varies in total in proportion to the level of inflation.

Answer(s): B



CORRECT TEXT

Refer to the exhibit.



Patchit Limited operates a job costing system. They have been asked to quote for a rush job that will require to be done in overtime hours. It is estimated that the job will incur the following costs:

Production overheads are absorbed on a direct labour hour basis. Budgeted direct labour hours for the year were 50,000 and budgeted direct labour cost was $300,000.

If production overheads had been based on a percentage of direct labour cost, the revised production costs for the job would be:

  1. $8

Answer(s): A



In order to provide information that is suitable for control purposes, the budget must be:

  1. Computer generated
  2. Fixed
  3. Flexed
  4. Ideal

Answer(s): C



CORRECT TEXT
C Ltd produces a chemical in a single process. Information for this process last month is as follows:

(a) Opening work in progress - 10000 kg valued at £10000 for direct material and £7500 for conversion costs.

(b) Materials input - 25000 kg at £1.10 per kg.

(c) Conversion costs - £17000

(d) Output during the month - 23000 kg.

(e) There were 7500 units of closing work in progress which was complete as to materials and 30% complete as to conversion.

(f) Normal loss for the month was 10% of input and all losses have a scrap value of 80p per kg.

What was the value of normal loss during the month?

  1. £1999

Answer(s): A



Which of the following best describes a step cost?

  1. A cost which remains constant until activity reaches a critical level; thereafter the cost increases to a higher level and the unit cost remains constant until the next critical activity level is reached.
  2. A cost which increases steadily until activity reaches a critical level; thereafter the cost increases to a higher level and the total cost remains constant until the next critical activity level is reached.
  3. A cost which remains constant until activity reaches a critical level; thereafter the cost increases to a higher level and the total cost remains constant until the next critical activity level is reached.
  4. A cost which increases per unit until activity reaches a critical level; thereafter the cost increases to a higher level and the unit cost remains constant until the next critical activity level is reached.

Answer(s): C



Viewing Page 15 of 80



Share your comments for CIMA BA2 exam with other users:

MortonG 10/19/2023 6:32:00 PM

question: 128 d is the wrong answer...should be c
EUROPEAN UNION


Jayant 11/2/2023 3:15:00 AM

thanks for az 700 dumps
Anonymous


Bipul Mishra 12/14/2023 7:12:00 AM

thank you for this tableau dumps . it will helpfull for tableau certification
UNITED STATES


hello 10/31/2023 12:07:00 PM

good content
Anonymous


Matheus 9/3/2023 2:14:00 PM

just testing if the comments are real
UNITED STATES


yenvti2@gmail.com 8/12/2023 7:56:00 PM

very helpful for exam preparation
Anonymous


Miguel 10/5/2023 12:16:00 PM

question 11: https://help.salesforce.com/s/articleview?id=sf.admin_lead_to_patient_setup_overview.htm&type=5
SPAIN


Noushin 11/28/2023 4:52:00 PM

i think the answer to question 42 is b not c
CANADA


susan sandivore 8/28/2023 1:00:00 AM

thanks for the dump
Anonymous


Aderonke 10/31/2023 12:51:00 AM

fantastic assessments
Anonymous


Priscila 7/22/2022 9:59:00 AM

i find the xengine test engine simulator to be more fun than reading from pdf.
GERMANY


suresh 12/16/2023 10:54:00 PM

nice document
Anonymous


Wali 6/4/2023 10:07:00 PM

thank you for making the questions and answers intractive and selectable.
UNITED STATES


Nawaz 7/18/2023 1:10:00 AM

answers are correct?
UNITED STATES


das 6/23/2023 7:57:00 AM

can i belive this dump
INDIA


Sanjay 10/15/2023 1:34:00 PM

great site to practice for sitecore exam
INDIA


jaya 12/17/2023 8:36:00 AM

good for students
UNITED STATES


Bsmaind 8/20/2023 9:23:00 AM

nice practice dumps
Anonymous


kumar 11/15/2023 11:24:00 AM

nokia 4a0-114 dumps
Anonymous


Vetri 10/3/2023 12:59:00 AM

great content and wonderful to have the answers with explanation
UNITED STATES


Ranjith 8/21/2023 3:39:00 PM

for question #118, the answer is option c. the screen shot is showing the drop down, but the answer is marked incorrectly please update . thanks for sharing such nice questions.
Anonymous


Eduardo Ramírez 12/11/2023 9:55:00 PM

the correct answer for the question 29 is d.
Anonymous


Dass 11/2/2023 7:43:00 AM

question no 22: correct answers: bc, 1 per session 1 per page 1 per component always
UNITED STATES


Reddy 12/14/2023 2:42:00 AM

these are pretty useful
Anonymous


Daisy Delgado 1/9/2023 1:05:00 PM

awesome
UNITED STATES


Atif 6/13/2023 4:09:00 AM

yes please upload
UNITED STATES


Xunil 6/12/2023 3:04:00 PM

great job whoever put this together, for the greater good! thanks!
Anonymous


Lakshmi 10/2/2023 5:26:00 AM

just started to view all questions for the exam
NETHERLANDS


rani 1/19/2024 11:52:00 AM

helpful material
Anonymous


Greg 11/16/2023 6:59:00 AM

hope for the best
UNITED STATES


hi 10/5/2023 4:00:00 AM

will post exam has finished
UNITED STATES


Vmotu 8/24/2023 11:14:00 AM

really correct and good analyze!
AZERBAIJAN


hicham 5/30/2023 8:57:00 AM

excellent thanks a lot
FRANCE


Suman C 7/7/2023 8:13:00 AM

will post once pass the cka exam
INDIA