To facilitate transportation efficiency and inventory management, companies frequently use:
Answer(s): C
Standardized containers are containers that have uniform dimensions and specifications, such as pallets, crates, boxes, etc. Standardized containers can facilitate transportation efficiency and inventory management by reducing the handling time, increasing the loading capacity, improving the space utilization, and simplifying the packaging and labeling processes. Standardized containers can also enable the use of automated storage/retrieval systems (AS/RS) and other technologies that require consistent dimensions and weights of the items.
CPIM Part 2 Exam Content Manual, Domain 7: Plan and Manage Distribution, Section 7.1: Distribution Network Design, p. 38.
A statistical safety stock calculation would be appropriate for:
A statistical safety stock calculation is a method to determine the optimal amount of safety stock based on the demand variability, the lead time variability, and the desired service level. A statistical safety stock calculation would be appropriate for end items with stable demand, because these items have a predictable demand pattern and a low coefficient of variation. For items with unstable or unpredictable demand, such as components used in multiple end items, new products at time of introduction, or supply-constrained raw materials, a statistical safety stock calculation may not be accurate or reliable, and other methods such as judgmental or simulation-based approaches may be preferred.
CPIM Part 2 Exam Content Manual, Domain 5: Plan and Manage Inventory, Section 5.4: Inventory Management Techniques, p. 29.
A part is sold as a service part, and it is also used as a component in another part. Which of the following statements about the planning for this part is true?
A part that is sold as a service part and also used as a component in another part is called a dual- sourced item. A dual-sourced item has two sources of demand: the external demand from the customers who buy the service part, and the internal demand from the parent part that uses the component. The planning for a dual-sourced item should include both sources of demand in the gross requirements, so that the net requirements can be calculated correctly. The service part demand can be included in the gross requirements by using a planning bill of material, which is a special bill of material that shows the relationship between a parent item and its service parts. A planning bill of material allows the system to explode the service part demand to the component level and generate planned orders for both the service part and the component. The other statements about the planning for this part are false. Its low-level code is not zero, because it is not an independent item. It has a higher low-level code than its parent item, because it is a component of another item. The material requirements for the part will not be understated, if both sources of demand are included in the gross requirements. It should have some safety stock, to protect against demand and supply uncertainties.
CPIM Part 2 Exam Content Manual, Domain 4: Plan and Manage Supply, Section 4.2: Material Requirements Planning (MRP), p. 22-23.
The benefits of standardized work include:
Answer(s): A
Standardized work is a method of organizing work processes to improve efficiency, quality, and safety1. One of the benefits of standardized work is consistent cycle time, which is the time it takes to complete a task or a process. By standardizing the work sequence, the takt time, and the standard inventory, standardized work reduces the variability and unpredictability of the work flow, and ensures that each task or process is performed in a consistent and optimal manner2. Consistent cycle time can lead to other benefits, such as improved customer satisfaction, reduced waste, increased productivity, and enhanced quality3.
Standardized Work: What Is It and Where Is It Used? - TWI Institute What is Standard Work: Benefits & Applications | SafetyCulture Standard Work: The Foundation for Kaizen - Lean Smarts
Long lead-time items with stable demand would best be supported by a supply chain:
Answer(s): D
Long lead-time items are items that take a long time to procure, produce, or deliver. Stable demand means that the demand for these items is predictable and does not fluctuate much over time. A supply chain that supports long lead-time items with stable demand would best be designed to position inventory close to the consumer, because this would reduce the delivery time and improve the customer service level. Positioning inventory close to the consumer also reduces the transportation costs and risks associated with long-distance shipments. A supply chain that uses a pull system, which is based on actual customer orders rather than forecasts, may not be suitable for long lead-time items, because it may not be able to meet the customer demand in a timely manner. A supply chain that is linked through an enterprise resources planning (ERP) system, which is a software system that integrates various business functions and processes, may improve the visibility and coordination of the supply chain, but it does not necessarily reduce the lead time or position inventory close to the consumer. A supply chain that is designed to be responsive, which means that it can quickly adapt to changes in demand or other variables, may not be necessary for long lead- time items with stable demand, because these items have low demand uncertainty and variability.
Inventory Positioning | Supply Chain Resource Cooperative Push System vs. Pull System: Adopting A Hybrid Approach To MRP What Is Inventory Positioning in Supply Chain Management?
Share your comments for APICS CPIM-Part-2 exam with other users:
could you please upload ad0-127 dumps
good content
understanding about joins
please upload oracle cloud infrastructure 2023 foundations associate exam braindumps. thank you.
questions made studying easy and enjoyable, passed on the first try!
has anyone recently attended safe 6.0 exam? did you see any questions from here?
question 13 should be dhcp option 43, right?
the buy 1 get 1 is a great deal. so far i have only gone over exam. it looks promissing. i report back once i write my exam.
is this dump good
good ................
passed
yes going good
good questions for practice
need dump and sap notes for c_s4cpr_2308 - sap certified application associate - sap s/4hana cloud, public edition - sourcing and procurement
question 11: d i personally feel some answers are wrong.
nice questions
looking for c1000-158: ibm cloud technical advocate v4 questions
can you share the pdf
admin ii is real technical stuff
could you post the link
hello send me dumps
it is very nice
i gave the amazon dva-c02 tests today and passed. very helpful.
there is an incorrect word in the problem statement. for example, in question 1, there is the word "speci c". this is "specific. in the other question, there is the word "noti cation". this is "notification. these mistakes make this site difficult for me to use.
passed my az-120 certification exam today with 90% marks. studied using the dumps highly recommended to all.
i need it, plz make it available
q47: intrusion prevention system is the correct answer, not patch management. by definition, there are no patches available for a zero-day vulnerability. the way to prevent an attacker from exploiting a zero-day vulnerability is to use an ips.
this is simple but tiugh as well
questão 4, segundo meu compilador local e o site https://www.jdoodle.com/online-java-compiler/, a resposta correta é "c" !
its very useful
i mastered my skills and aced the comptia 220-1102 exam with a score of 920/1000. i give the credit to for my success.
real questions
very helpful assessments
hi there, i would like to get dumps for this exam
Keeping this site free takes real effort. We constantly battle automated scraping and unauthorized content copying. A quick account helps us protect the community and keep the site free.
To continue studying for your CPIM-Part-2, please sign in or create a free account.