Up-to-date information about production order status is required to do which of the following tasks?

  1. Calculate current take time.
  2. Determine planned orders.
  3. Replenish kanban quantities.
  4. Calculate the cost of work in process (WIP).

Answer(s): D

Explanation:

Up-to-date information about production order status is required to calculate the cost of work in process (WIP). WIP is the inventory of unfinished goods or partially completed products that are still in the production process1. The cost of WIP is the sum of the costs of the materials, labor, and overhead that have been incurred in the production process but have not yet been transferred to the finished goods inventory2. To calculate the cost of WIP, we need to know how much of each production order has been completed and how much remains to be done. This information can be obtained from the production order status, which is a report that shows the current status of each production order in terms of its quantity, start date, end date, completion percentage, and variance3. By using the production order status, we can determine the amount of WIP for each production order and for the entire production process. This can help us monitor and control the production efficiency, profitability, and quality4.


Reference:

1: Work In Progress (WIP) Definition 2 2: Work-in-Process (WIP) Accounting 3 3:
Production Order Status Report 5 4: How to Calculate Work in Process Inventory 6



A machine is suddenly having excessive downtime.
Which of the following tools would be used in a root cause corrective action process to determine the problem?

  1. Failure mode effects analysis (FMEA)
  2. Standardized work analysis chart
  3. Balance chart
  4. A3 method

Answer(s): D

Explanation:

A3 method is a tool that can be used in a root cause corrective action process to determine the problem of a machine that is suddenly having excessive downtime. A3 method is a structured problem-solving approach that follows the Plan-Do-Check-Act (PDCA) cycle and uses a single sheet of paper (A3 size) to document the problem, analysis, countermeasures, and results1. A3 method can help identify the root cause of a problem by using tools such as the 5 Whys or the fishbone diagram, and then develop and implement effective corrective actions to prevent recurrence2. A3 method can also help communicate the problem and the solution to stakeholders, as well as monitor and evaluate the outcomes3.
The steps of the A3 method are4:
Step 1: Define the problem and its impact. Describe the current situation, the gap between the actual and the desired state, and the scope and magnitude of the problem. Step 2: Identify the root cause of the problem. Use tools such as the 5 Whys or the fishbone diagram to analyze the factors that contribute to the problem and drill down to its root cause. Step 3: Propose countermeasures to address the root cause. Generate possible solutions that can eliminate or reduce the root cause, and evaluate their feasibility, effectiveness, and costs. Step 4: Implement countermeasures. Select the best solution and plan how to execute it. Define the roles, responsibilities, resources, timeline, and expected outcomes of the implementation. Step 5: Check results and process. Measure and compare the results before and after the implementation, and verify if the problem has been solved or improved. Also check if the process has been followed correctly and document any deviations or issues. Step 6: Standardize successful processes or identify unresolved issues. If the results are satisfactory, standardize the new process and ensure that it is sustained. If not, identify the remaining or new issues and repeat the A3 method.
Therefore, A3 method is a tool that can be used in a root cause corrective action process to determine the problem of a machine that is suddenly having excessive downtime.


Reference:

1: What is an A31 2: How to Use an A3 Report for Problem Solving 2 3: The A3 Problem Solving Method 4 4: The A3 Report ­ A Simple Tool for Complex Problems 5



Which of the following techniques would a group use to prioritize problems?

  1. Critical path analysis
  2. Pareto analysis
  3. Scatter charts
  4. Cause-and-effect diagrams

Answer(s): B

Explanation:

Pareto analysis is a technique that a group can use to prioritize problems. Pareto analysis is based on the Pareto principle, also known as the 80/20 rule, which states that 80% of the effects come from 20% of the causes1. Pareto analysis can help a group identify and focus on the most significant problems that account for the majority of the negative outcomes, and allocate their resources and efforts accordingly2.
The steps of Pareto analysis are3:
Step 1: Define the problem and its scope. Clarify what the problem is, why it is important, and what are the desired outcomes.
Step 2: Identify the causes of the problem. Brainstorm and list all the possible factors that contribute to the problem, such as people, processes, equipment, materials, environment, etc. Step 3: Collect data on the causes. Gather quantitative or qualitative data on how often or how much each cause affects the problem, such as frequency, severity, cost, time, etc.

Step 4: Analyze the data using a Pareto chart. A Pareto chart is a type of bar chart that shows the frequency or impact of each cause in descending order, along with a cumulative line that shows the percentage of the total effect. A Pareto chart can help visualize which causes are more significant than others, and where the 80/20 split occurs.
Step 5: Prioritize the causes and take action. Based on the Pareto chart, select the most critical causes that need to be addressed first, and develop and implement solutions to eliminate or reduce them. Monitor and evaluate the results and repeat the process if necessary. Therefore, Pareto analysis is a technique that a group can use to prioritize problems by identifying and focusing on the most significant causes that account for the majority of the negative outcomes.


Reference:

1: The Pareto Principle - The 80/20 Rule Explained 1 2: How to Use Pareto Analysis to Improve Your Business 2 3: How to Perform a Pareto Analysis (Step-by-Step) 3



In the design and development of a manufacturing process, process engineers would most likely be responsible for decisions relating to:

  1. lead times.
  2. production capacity.
  3. product reliability.
  4. routing sequences.

Answer(s): D



Which of the following trade-offs should be evaluated when determining where to place inventory in a multi-echelon supply chain network?

  1. Production cost and lot size quantity
  2. Purchase cost and shrinkage rates
  3. Transportation cost and delivery time
  4. Customer price and order quantity

Answer(s): C



Viewing Page 3 of 32



Share your comments for APICS CPIM-Part-2 exam with other users:

piyush keshari 7/7/2023 9:46:00 PM

true quesstions
Anonymous


B.A.J 11/6/2023 7:01:00 AM

i can“t believe ms asks things like this, seems to be only marketing material.
Anonymous


Guss 5/23/2023 12:28:00 PM

hi, could you please add the last update of ns0-527
Anonymous


Rond65 8/22/2023 4:39:00 PM

question #3 refers to vnet4 and vnet5. however, there is no vnet5 listed in the case study (testlet 2).
UNITED STATES


Cheers 12/13/2023 9:55:00 AM

sometimes it may be good some times it may be
GERMANY


Sumita Bose 7/21/2023 1:01:00 AM

qs 4 answer seems wrong- please check
AUSTRALIA


Amit 9/7/2023 12:53:00 AM

very detailed explanation !
HONG KONG


FisherGirl 5/16/2022 10:36:00 PM

the interactive nature of the test engine application makes the preparation process less boring.
NETHERLANDS


Chiranthaka 9/20/2023 11:15:00 AM

very useful.
Anonymous


SK 7/15/2023 3:51:00 AM

complete question dump should be made available for practice.
Anonymous


Gamerrr420 5/25/2022 9:38:00 PM

i just passed my first exam. i got 2 exam dumps as part of the 50% sale. my second exam is under work. once i write that exam i report my result. but so far i am confident.
AUSTRALIA


Kudu hgeur 9/21/2023 5:58:00 PM

nice create dewey stefen
CZECH REPUBLIC


Anorag 9/6/2023 9:24:00 AM

i just wrote this exam and it is still valid. the questions are exactly the same but there are about 4 or 5 questions that are answered incorrectly. so watch out for those. best of luck with your exam.
CANADA


Nathan 1/10/2023 3:54:00 PM

passed my exam today. this is a good start to 2023.
UNITED STATES


1 10/28/2023 7:32:00 AM

great sharing
Anonymous


Anand 1/20/2024 10:36:00 AM

very helpful
UNITED STATES


Kumar 6/23/2023 1:07:00 PM

thanks.. very helpful
FRANCE


User random 11/15/2023 3:01:00 AM

i registered for 1z0-1047-23 but dumps qre available for 1z0-1047-22. help me with this...
UNITED STATES


kk 1/17/2024 3:00:00 PM

very helpful
UNITED STATES


Raj 7/24/2023 10:20:00 AM

please upload oracle 1z0-1110-22 exam pdf
INDIA


Blessious Phiri 8/13/2023 11:58:00 AM

becoming interesting on the logical part of the cdbs and pdbs
Anonymous


LOL what a joke 9/10/2023 9:09:00 AM

some of the answers are incorrect, i would be wary of using this until an admin goes back and reviews all the answers
UNITED STATES


Muhammad Rawish Siddiqui 12/9/2023 7:40:00 AM

question # 267: federated operating model is also correct.
SAUDI ARABIA


Mayar 9/22/2023 4:58:00 AM

its helpful alot.
Anonymous


Sandeep 7/25/2022 11:58:00 PM

the questiosn from this braindumps are same as in the real exam. my passing mark was 84%.
INDIA


Eman Sawalha 6/10/2023 6:09:00 AM

it is an exam that measures your understanding of cloud computing resources provided by aws. these resources are aligned under 6 categories: storage, compute, database, infrastructure, pricing and network. with all of the services and typees of services under each category
GREECE


Mars 11/16/2023 1:53:00 AM

good and very useful
TAIWAN PROVINCE OF CHINA


ronaldo7 10/24/2023 5:34:00 AM

i cleared the az-104 exam by scoring 930/1000 on the exam. it was all possible due to this platform as it provides premium quality service. thank you!
UNITED STATES


Palash Ghosh 9/11/2023 8:30:00 AM

easy questions
Anonymous


Noor 10/2/2023 7:48:00 AM

could you please upload ad0-127 dumps
INDIA


Kotesh 7/27/2023 2:30:00 AM

good content
Anonymous


Biswa 11/20/2023 9:07:00 AM

understanding about joins
Anonymous


Jimmy Lopez 8/25/2023 10:19:00 AM

please upload oracle cloud infrastructure 2023 foundations associate exam braindumps. thank you.
Anonymous


Lily 4/24/2023 10:50:00 PM

questions made studying easy and enjoyable, passed on the first try!
UNITED STATES